DGX · HGX · Data Center GPU · AI Enterprise — Tier 1 Partner Hub

NVIDIA DGX & GPU: Specs, BOM Risk & RFQ

NVIDIA DGX H100 / H200 / B200, HGX baseboard, H100 / H200 / B200 / L40S GPU, AI Enterprise software — freeze GPU model, topology, software license, and term on one matched brief. Team trading this OEM since 2015.

Quick Take

BENQUAN GLOBAL LIMITED supplies NVIDIA B300 GPU servers with global stock and BOM risk assessment. Freeze DGX versus HGX, fabric tier, power envelope, and AI Enterprise license before ranking any column. Unit ATP stays quote-gated until a dated window is confirmed.

SECTION 01

Our Relationship & Capabilities

Founding team has traded NVIDIA since 2015. Priority free-port allocation, and certified-authentic sourcing across DGX, HGX, data-center GPU, and AI Enterprise.

01

Authorized Channel Sourcing

Serial validation, entitlement check, and documented chain of custody before PO. Grey-market risk eliminated on DGX and HGX deals.

02

AI Enterprise License Decoding

Per-GPU subscription tier and term (1-yr / 3-yr / 5-yr) frozen on the RFQ so totals match across dual-vendor columns.

03

Global Free-Port Allocation

Priority access across NVIDIA worldwide allocation from a global free-port hub. Lead-time disclosure per line on every quote.

04

Multi-Region Logistics

Customs clearance and on-site delivery coordination across APAC, EMEA, and Americas. Regional stocking for AI cluster refresh waves.

SECTION 02

Product Family — What We Quote

Four product families on one brief — GPU model, topology, AI Enterprise license, and fabric tier frozen before ranking any column.

SECTION 03

Top Buying Guides & Specs

Specs, buying guides, and peer comparisons matched on GPU model, count, topology, fabric, and AI Enterprise license.

SECTION 04

Useful Tools for NVIDIA RFQ

Self-serve tools that de-risk an NVIDIA BOM before the quote.

SECTION 05

Industry Use Cases

Workloads and verticals where NVIDIA BOM risk control matters most.

SECTION 06

Frequently Asked Questions (FAQ)

What buyers ask before opening a quote request.

Send exact SKU, GPU model and count, topology, AI Enterprise license tier, term, quantity, and delivery window.

DGX turnkey rack with NVIDIA-optimized hardware + software; HGX baseboard for OEM system builders (8x GPU NVLink topology); PCIe GPU for flexible deployment. RFQ both columns matched on GPU model, count, topology.

H100 (transformer-class, 80GB HBM3); H200 (141GB HBM3e, 4.8TB/s, 60% faster inference); B200 (Blackwell, 192GB HBM3e, 2.5x Hopper training). RFQ both columns matched on workload profile.

AI Enterprise: per-GPU annual subscription for production AI / DGX Cloud software stack. Base Command: included with DGX / HGX for cluster management. Bundle license scope on the RFQ.

DGX B200 turnkey (8x B200); HGX B200 (8x B200 baseboard for OEM); HGX H200 (8x H200 baseboard). DGX adds full rack + networking + software stack; HGX is just the baseboard. Match on scope.

Spectrum-X Ethernet for AI fabric (200/400/800GbE); Quantum InfiniBand (QM9700 / QM9790) for low-latency HPC; BlueField-3 DPU for storage offload. Freeze fabric tier on the RFQ.

Yes. Match GPU model, count, topology, fabric, power, software license, and support tier on every column so the ranking is real.

DGX Cloud: NVIDIA-managed monthly reserved instance for burstable AI capacity. Bundle with on-prem DGX on the RFQ for hybrid AI workload management.

Unsure whether your NVIDIA DGX & GPU BOM will survive procurement?

Send the part list for a free compatibility and delivery risk assessment: license scope, optics, support term, and lead time checked line by line against matched peer columns. BENQUAN GLOBAL LIMITED supplies NVIDIA DGX & GPU hardware and licensing with competitive pricing.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk