Which vendor price and EOS dates hit your open quotes in 2026?

Dated notices for Cisco, HPE, Dell, Fortinet, Broadcom, Palo Alto and peers — what changed, what it covers, and what to do before you freeze a PO. Filter the timeline, request gated PDFs, then open a BOM-risk RFQ.

Quick Take

Match the card date before you freeze CapEx. Last-order and list-price cliffs often fall on different days. Then open the analysis or request the official PDF.

SECTION 01

Announcement Timeline

Vendor
All Aruba Cisco Dorado F5 Fortinet Hitachi Vantara HPE Juniper NetApp Palo Alto Networks
Type
All EOL / EOS Price Change Product
Filter list grows with new vendor notices and announcement types. Unknown vendors are auto-colored from an 8-color palette; unknown types fall back to their raw label.
202661 announcements effective this year
07
NOV
CiscoPrice Change

Cisco list goes live in CCW on 7 Nov 2026 — software mid-single digit, Splunk out

Partner note dated 24 October 2026. Networking and security software list rises by a mid-single-digit average. Splunk is not included. Hardware changes cover a small set of products; the note prints no hardware percent. Standard price protection is unchanged. SKU deltas are in the price-change file from 24 October. New prices go live in Cisco Commerce Workspace on 7 November 2026. This is not the 1 August book. Channel net pending confirmation.

Eff. Nov 07, 2026
02
NOV
Broadcom BrocadePrice Change

Brocade BSN Price Book: +5.7% Average Nov 2, 2026 — X8 +10%, G820 +5%, 7850 +25%

BSN channel book (not TGStor / Dell): average +5.7% from November 2, 2026 citing supplier costs through 2026/2027. Product: X8 chassis/blades/ICL POD +10%; G748/G749 (HPE embedded) +10%; G720/G820 + POD +5%; 7810/7850 +25%. FRUs higher (X8 CP +50%, 7850 FRU +60%). Optics and software unchanged. Support: Gen8 Active 5–9% (X8/ICL 5%, G820 9%), Gen7 and Gen6 Active + licenses 7%. FY26-ship backlog excepted. OEM Q4'26 true-up at current price. New pricing for orders shipped after November 1, 2026.

Eff. Nov 02, 2026
30
OCT
HuaweiPrice Change

Huawei datacom selling prices move 30 Oct 2026 — 15 Oct notice prints no percent

Customer letter dated 15 October 2026 from Huawei Technologies Co., Ltd. From 30 October 2026, selling prices rise on some data-communication products and supporting servers. No percent and no model list. Not the 9 October storage-media file. Notice PDF is emailed after a company-email request. Channel net pending confirmation.

Eff. Oct 30, 2026
30
OCT
HPEOrdering Freeze

HPE SAP FYE freeze: submit POs by 16:00 HKT 30 Oct 2026; SAP down 31 Oct 22:00–5 Nov 09:00 HKT

Channel partner notice dated 20 October 2026. HPE SAP ordering is unavailable from 31 October 2026, 22:00 HKT, until 5 November 2026, 09:00 HKT. Submit all order requests by 16:00 HKT on 30 October 2026. During the freeze: no order creation, no modifications (RDD, delivery address), no invoice triggering or other SAP-related processing. Requests after the cutoff may not process before the outage. Not Instant Price. Not the quote-to-ship hold. No public PDF. Channel net pending confirmation.

Eff. Oct 30, 2026
23
OCT
FortinetProduct Update

FortiSwitch AX9000G: 4-slot or 8-slot chassis, lock the line card and 4,320 W per slot

Blog by James Allen, 23 October 2026. First modular FortiSwitch chassis. Cards: 48x10GE multigig 802.3bt 90 W, 50x10GE fiber, 48x25GE+4x100GE, 32x100GE, 8x400GE. PoE budget 4,320 W per slot. Dual supervisors, up to 8 PSUs, 3 fan modules. FortiSwitchNMS now. FortiLink is future integration. No public PID or price. Channel net pending confirmation.

Eff. Oct 23, 2026
22
OCT
FortinetSecurity Hardening

FortiOS hardening builds 22 Oct 2026: patch internet-facing FortiGate first

CISO blog dated 21 October 2026. Fixed trains scheduled 22 October 2026: FortiOS 7.6.8, 7.4.13, 7.2.14 or 8.0.2 (or above on that train). FortiManager and FortiAnalyzer follow their own rows — FortiManager 7.4 is 7.4.12, not 7.4.13. PSIRT text is Patch Tuesday 10 November 2026. Do not wait for it. Admin-plane limits and MFA are interim. No CVE IDs in the blog. Channel net pending confirmation.

Eff. Oct 22, 2026
21
OCT
Palo Alto NetworksCatalog / New SKUs

October 2026 commercial price file: PA-5510 / PA-1510-POE families added (+2,367 SKUs)

The October 2026 Palo Alto commercial price file adds about 2,367 SKUs versus September, including PA-5510/5520/5530 and PA-1510-POE chassis families. Soft chassis LIST spans roughly USD 3,050–299,000. Retained LIST did not move. Distinct from the 3 October Gen 4/5 surcharge. Public SKU Lookup remains dated 2026-09-30. Channel net pending confirmation.

Eff. Oct 21, 2026
17
OCT
F5Catalog Update

F5 List Oct 17 2026: +22%, +20%, +14%, +33% — licenses and maintenance moved; not one chassis multiplier

F5 SKU Lookup is on catalog date 2026-10-17 with 5,553 SKUs (was 5,371 on 2026-06-05). Diff: +297 / −102. MoM is not one percentage: +22% / +20% / +14% on appliances and licenses; software maintenance near +33%; about 3,009 retained lines still 0%. Adds are mostly finer ELA billing, Schedule A / US National, and F5-SVC* splits, plus F5-BIG-R5600. F5 Lookup hides LIST dollars. Channel net pending confirmation.

Eff. Oct 17, 2026
16
OCT
Palo Alto NetworksPrice Change + Hardware Surcharge

Palo Alto CVP: hardware surcharge exemption extended until further notice (16 Oct 2026)

NextWave 16 October 2026 follow-up to the 5 August and 23 September announcements: the hardware surcharge exemption for Commercial Velocity Program (CVP) customer quotes is extended until further notice. The original 90-day window (3 October–31 December 2026) is no longer the hard stop. Exemption covers the temporary Gen 4 hardware surcharge only — do not assume it erases Gen 5 PA-500 +15% base-list uplift. Confirm CVP eligibility in writing with your CBM or distributor. Channel net pending confirmation.

Eff. Oct 16, 2026
12
OCT
CiscoProduct Update

Cisco G302 / USFP at OCP 12 Oct 2026: spec and silicon, not 2026 PIDs

Cisco and NVIDIA at OCP 12 October 2026 published USFP as a 400Gb/s-per-lane pluggable spec (up to 12.8T) and Silicon One G302 as 51.2T ToR silicon with 200G SerDes and 1.6T optics, planned to ship before end of 2026. G300 is 102.4T sampling with first systems shipping. No public commercial-box PID. Do not PO USFP. Freeze today's 800G OSFP / Spectrum-X / E100 lines. Channel early-2027 / GA TBD stays pending confirmation. Channel net pending confirmation.

Eff. Oct 12, 2026
09
OCT
DoradoPrice List Change

Huawei price list 2026-10-09: 63 OceanDisk SSD lines cut 17.8–31.5% on LIST — Dorado array drives flat

Huawei Dorado price list dated 2026-10-09: 4,092 lines (was 4,046 on 2026-09-01), +89 / −43. Of 4,003 retained lines, 64 changed and all went down: 63 OceanDisk SSD components (model prefix HSSD-O) cut 17.8% to 31.5%, plus one 64GB DDR4 module (02510883, −57%). Dorado array drives (D5V6, D8V6 and peers), 34 eKitStor HSSD-E lines and 3 HSSD-S lines are flat. Four Pacific chassis codes (02357QN*) were removed; the nearest same-spec line is 28–34% higher. Channel net pending confirmation.

Eff. Oct 09, 2026
09
OCT
IBMCatalog Update + Model Withdrawal

IBM catalog 2026-10-09: 217,683 parts (+1,776) — Power E1050 (9043-MRX) to E1150 (9043-MRU) upgrade codes added

IBM catalog date 2026-10-09: 217,683 part numbers (was 215,907 on 2026-09-12). Diff +1,776 / −0, no price moves. 1,762 adds are machine type 9043: 1,534 orderable features, 227 feature conversions (107 memory activation, 69 processor activation, 20 DDIMM, 12 processor module, 19 other) and 1 model conversion 9043-MRX → 9043-MRU. That matches the Power E1050 withdrawal from new orders on 31 Jul 2026 and the serial-preserving upgrade to Power E1150. The other 14 adds are SaaS and software codes. Quote-only; channel net pending confirmation.

Eff. Oct 09, 2026
09
OCT
DoradoPrice List

OceanStor Dorado EN Price List Updated — October 2026 (Gated XLSX)

OceanStor Dorado English price-list index dated 2026-10-09 now holds 4,092 SKUs (was 4,046 on 2026-09-01). Net +46: +89 new / −43 dropped. Retained LIST: 0 up / 64 down / 3,939 flat. Cuts cluster on SSD media (about −22% to −32%); one 64GB DDR4 module fell −57%. New orderable lines include Dorado 3000/5000/6000 V7 controllers. Gated XLSX by company email; channel net = RFQ / pending confirmation. Prior revisions stay for quote reconciliation.

Eff. Oct 09, 2026
08
OCT
OraclePrice Change

Oracle SPARC M12 Memory List Oct 8 2026: +51%, +37%, +25%

Oracle raised Fujitsu SPARC M12 memory list on 8 October 2026 for SPARC M12-1, M12-2, and M12-2S. 16GB modules move +51% or +25% depending on part number and configuration. 32GB modules move +37%. A complete system is about +10% depending on model and DIMM mix. The quote workspace already shows the new memory list. Approved deal registrations must be ordered on the offline path before they expire. Channel net = RFQ / pending confirmation. Do not stamp +51% on the whole chassis PO.

Eff. Oct 08, 2026
07
OCT
CiscoCatalog Update (Status Only)

Cisco SKU Lookup — 47 NVIDIA HCI license SKUs left the 2026-10-01 index

Cisco product index is still catalog date 2026-10-01. Public product SKUs are now 47,339 (were 47,386). Diff: +0 / −47. All 47 removed lines are NVIDIA AI Enterprise Essentials and GRID / vDWS licenses on Cisco HCI (HCI-NV-AIE, HCI-NV-GRD, HCI-NVAIE). Retained product LIST is unchanged (0 up / 0 down). Maintenance file is unchanged at 485,100 rows. This is not a new list-date and not a repeat of the +3.5% / +15% / +25% move. Channel net = RFQ / pending confirmation.

Eff. Oct 07, 2026
03
OCT
Palo Alto NetworksPrice Change + Hardware Surcharge

Palo Alto Oct 3: Gen4 PA-400/1400 +15% & PA-3400/5400 +10% temp list surcharge; Gen5 PA-500 +15% base list; CVP waiver; Fed/SLED Dec 1

NextWave follow-up to the August 5, 2026 announcement. Effective October 3, 2026 (commercial): Gen 4 Branch PA-400s/PA-1400s temporary 15% list surcharge; Gen 4 Campus PA-3400s and Data Center PA-5400s temporary 10% list surcharge; Gen 5 Branch PA-500s 15% increase to base list price (not temporary surcharge). US Public Sector / Fed/SLED Gen 4 surcharge timing December 1, 2026 (Gen 5 Fed/SLED detail TBD). Temporary surcharge waived for Commercial Velocity Program (CVP) quotes October 3–December 31, 2026. Accessories, subscriptions, and support not affected. Broader Oct 3 list families (Panorama, Flex Credits, SD-WAN, Precision AI Bundle, EOS support, Prisma Access, Focused Services) remain in force. Channel net = industry estimate / pending confirmation.

Eff. Oct 03, 2026
01
OCT
CiscoCatalog Update

Cisco SKU Lookup — Catalog 2026-10-01 (47,386 product SKUs)

Cisco on SKU Lookup now shows catalog date 2026-10-01 with 47,386 product SKUs (was 2026-08-19 / 47,912). Product set +2,074 / −2,600. Retained product LIST: 3,977 up, 14 down, 30,292 flat. About 3,028 increases sit near +3.5%. Maintenance rows, loaded on demand, cluster near +25% (6,486) and +15% (6,102). LIST is shown. Channel net = RFQ / pending confirmation.

Eff. Oct 01, 2026
01
OCT
Hitachi VantaraPrice Change

Hitachi VSP media and cache — cost change from October 1, 2026

Storage Media and Cache cost change starts October 1, 2026. July 15, 2026 was the previous price-increase notice, not this mail. Estimated solution-level impact: VSP Block 85 about 15-20%, VSP 5x00 about 19-30%, VSP Block 2x about 20-22%, E and G series media about 25%. Component cost and price percentages are wider (5000 nodes max 298%; E-series drive price from -53% to 223%). Not the April 2025 list revision and not the August 18, 2026 InfoFlash.

Eff. Oct 01, 2026
01
OCT
Extreme NetworksPrice Change + Supply

Extreme Networks Pricing Update Oct 1, 2026 — Hardware, Subscription, Support SKUs

Customer letter dated August 17, 2026: pricing update effective October 1, 2026 covers hardware, subscription, and support SKUs (no SKU-level % in the letter). Vendor cites supplier/component costs; recommends advance purchase, multiyear support/subscription lock, and timeline planning. USAC E-Rate: compliance for existing awards and applicable quote guidance. Official PDF gated — company email required.

Eff. Oct 01, 2026
30
SEP
Palo Alto NetworksCatalog Update

Palo Alto SKU Lookup — Catalog 2026-09-30 (+537 SKUs)

Palo Alto on SKU Lookup now shows catalog date 2026-09-30 with 15,846 public SKUs (was 2026-08-22 / 15,309). Diff: +537 / −0. About 490 new lines are PAN-PA subscription rows, mostly Advanced IP Defense, plus ELA modifiers, Cortex Data Security, five power supplies, and PAN-FIPS-KIT-56R. Public Lookup has no LIST column. Not the October 3 list surcharge. Channel net = RFQ / pending confirmation.

Eff. Sep 30, 2026
28
SEP
Pure StorageCatalog Update (Status Only)

Pure Storage SKU Lookup — Catalog 2026-09-28 (+3 SKUs)

Pure on SKU Lookup now shows catalog date 2026-09-28 with 26,659 public SKUs (was 2026-08-22 / 26,654). Diff vs Aug 22: +3 / −0 — FA DC 2000W POWER SUPPLY KIT; 91TB-DFM X20 TO X50R5 UPG, 1MO,PRM,FVR; 91TB-DFM X20 TO X50R5-NL-FC UPG ACCL-FF. Public Lookup stays quote-oriented (no LIST column). No Insights article this cycle (status-only). Channel net = RFQ / pending confirmation — LIST≠PO.

Eff. Sep 28, 2026
28
SEP
Hitachi VantaraProduct GA + Price Change

Hitachi InfoFlash Sep 22: iQ Studio v1.1 GA + VSP pricing Sep 28 + Supermicro Oct 1

Partner Weekly InfoFlash dated September 22, 2026. Track A: Hitachi iQ Studio v1.1 general availability (multimodal RAG, agents, governance, ServiceNow). Track B: list pricing updates effective September 28, 2026 for VSP One Block High End, VSP 5000, VSP One Block 20, and VSP E/G (new sales + upgrades); Approved/unexpired quotes keep prior pricing, In-Progress must Refresh in PQM. Track C: Supermicro Servers and components price increase October 1, 2026 — all pre-Oct 1 quotes must reprice. Soft channel % pending confirmation. Not the August 18 or July 14 InfoFlash.

Eff. Sep 28, 2026
24
SEP
DellCatalog Update

Dell List Sep 24 2026: +12%, +11%, +14%, +7% — mostly ProSupport, not PowerEdge chassis

Dell SKU Lookup is on catalog date 2026-09-24 with 370,385 Dell-branded SKUs (was 371,197 on 2026-08-19). Diff: +6,303 / −7,115. LIST MoM is not one percentage: +12% / +11% / +14% / +7% bands sit mostly on ProSupport (714-/715-/716-). PowerEdge family rows are largely flat. New chassis examples include 210-BWTY (R9825) and 210-BWWX (R9815). Baseline LIST ≠ channel net. Channel net pending confirmation.

Eff. Sep 24, 2026
22
SEP
NetAppCommerce Operations

NetApp UCPQ PO Submission Training — partners submit General POs in Quote Advisor

Official English UCPQ PO Submission Training (22 slides): partners submit General NetApp POs in PartnerHub UCPQ themselves — Configured to Orderable to PO Submitted. Covers Quote Advisor, CMAT/serial blockers, Attachments, Pre-Build, and Order Management change/cancel/return windows. Leasing still uses ng-nb-posubmission@netapp.com; Demo/Eval conversions use ng-Eval-Program-Quoting@netapp.com. Not the August 15 list-price matrix.

Eff. Sep 22, 2026
17
SEP
FortinetCatalog Date Stamp (No SKU Delta)

Fortinet SKU Lookup Catalog Date 2026-09-17 — Zero SKU Delta vs Sep 2

Fortinet on SKU Lookup now shows catalog date 2026-09-17 (26,483 SKUs). Diff vs 2026-09-02: +0 / −0 SKUs, no description renumbers, no public LIST MoM (Lookup has no Fortinet LIST). Stamp/source-file refresh only — not a new product delta. Material Sep adds remain those documented for Sep 2 (+7 net vs Aug 18). Channel net = RFQ / pending confirmation.

Eff. Sep 17, 2026
12
SEP
IBMCatalog Update

IBM Catalog Update Sep 12, 2026 — +143 Part Numbers, 0 Removed

IBM on SKU Lookup moves to catalog revision 2026-09-12 with 215,907 public part numbers, up 143 from 215,764 with zero removals (MoM baseline 2026-08-27). Additions are ordering-matrix depth: 32 Storage Assurance billing-cadence codes across 1-8 year terms, 18 Storage Expert Care committed-fix codes (4h-72h) plus 6-year Basic/Advanced/Premium terms, 60 five-year Expert Care Premium wrappers paired 1:1 with new hardware codes, 3 FlashCore Module 4.0 drives (4.8TB/9.6TB/19.2TB), 8 FlashSystem 9500 campaign lines, and 22 software/cloud migration-path codes. No price action: IBM stays quote-only with no public list price. Re-validate open storage BOMs at code level.

Eff. Sep 12, 2026
07
SEP
FortinetPrice Change + New SKU

Fortinet Mid-Q3 2026 Price List — New SKUs, Standard +15% on FG 7000, Hardware Uplift (Sep 7)

Separate mid-quarter price list effective Monday September 7, 2026 (not the August Q3 wave). Track 1 new SKUs: Sovereign SASE Onramp/Orchestrator, FS 324G/324G-FPOE, FortiMail 200H/400H, unified FortiEndpoint, FortiManagement Cloud (coming soon), FortiVoice 2000H, FVE-5000H central mgmt, FortiCall Trunks, FortiRecorder 400H, FortiCamera FD52-CA. Track 2 Standard: FG 7000+FPMS/FIM +15%, select FVE +11–30%, select FVG +18–63%. Track 3 Price Uplift: entry G-series+40F and 120G/121G hardware+HW bundles only (no invented %).

Eff. Sep 07, 2026
01
SEP
CiscoCommerce Operations

Cisco August 2026 Operational Early Visibility — Service EA, Splunk/AppD, SaaS NSD, Lapse Charges, TF T+30

Partner Operational Early Visibility Newsletter (August 2026, emailed 2026-08-28). Forecast may include deferred scopes under analysis — every window pending confirmation. September = Top Care Abouts (no hour table). 1–2 month: Uncovered Asset Discounts removal (Service EA); Splunk + AppDynamics subscription consolidation; NSD process change for SaaS Manual Renewal; Lapse Charges Phase 2 (à-la-carte PS→EA and EA→EA). 3–4 month: device-based SaaS renewals in CCW-R; Concurrent Ordering (EA 3.0); TF T+60→T+30 (EA 3.0); distributor stocking for cloud-managed Meraki; rebate claims SN-based replacing WPL (pilot). 5–6 month: CPI for distributors; Enterprise Direct SMB; Enterprise Direct Self Service — unfit to stall a current PO. Webinar (date pending): TF/true-up dispute window + AppDynamics mid-term pricing. Not the Aug 1 list-price letter and not July FY downtime. No PDF on the email.

Eff. Sep 01, 2026
27
AUG
Hitachi VantaraPrice Change + EOL

Hitachi InfoFlash Aug 18: VSP One Price Aug 27, Nexus Aug 14, Brocade Cord EOL Aug 30

Partner Weekly InfoFlash (August 18, 2026): VSP One Block High End list pricing effective August 27, 2026 (new sales and upgrades; unapproved deals need new Deal Registration). Cisco Nexus channel pricing effective August 14, 2026 with reprice of open quotes. Brocade 2.5m Director power cord BR-DCX-0137.P EOL August 30, 2026 (EOCS June 30, 2029) replaced by BR-DCX-0132.P.

Eff. Aug 27, 2026
21
AUG
Dell TechnologiesEnd of Sales Life

Dell Unity XT Hybrid Arrays EOL: 380HFA–880HFA End of Sales Life (Regional 2027–2028)

All Dell Unity XT Hybrid x80HFA models (380HFA, 480HFA, 680HFA, 880HFA) reach End of Sales Life on regional calendars: China Mainland January 29, 2027; EU July 31, 2027; APJ including Hong Kong/Taiwan markets plus NA, LATAM, and non-EU EMEA January 28, 2028. End of Expansion January 31, 2031; End of Standard Support January 31, 2033. No purchase exceptions after EOL — start transition planning now.

Eff. Aug 21, 2026
21
AUG
Palo Alto NetworksProgram Update

Palo Alto Networks NextWave FY27: Idira 5% Rebate, Partner Development Fund, Partner-Led Services Default, Tier Freeze

FY27 NextWave partner letter: first-ever 5% rebate on Idira identity sales plus Idira Spark stackable rebate for self-hosted-to-cloud moves; Partner Development Fund when quarterly rebates exceed US$5,000; commercial partner-led services default for Authorized PS/Support Center partners; MSSP unified specializations with new Idira track and forthcoming SIP microsite tool; all partner tiers and specializations frozen through FY27 with compliance assessment at FY27 close during CyberArk program integration.

Eff. Aug 21, 2026
15
AUG
NetAppPrice Change

NetApp August 10 Partner FAQ — which quotes survive Aug 15, renewals through Oct 31

Partner FAQ dated August 10, 2026 (list change effective August 15). Quotes created before August 15 keep a 15-day old list until they expire. New quotes are 30-day at the new list. Old-price renewal quotes can transact through October 31, 2026, then they refresh. Software-only ONTAP Select and StorageGRID Webscale do not increase. Approved FAS Price Protection Guarantee nets stay honored. Not the same document as the August 15 percentage matrix.

Eff. Aug 15, 2026
15
AUG
NetAppPrice Change

NetApp List Price Update — Effective August 15, 2026: HPF/ASA Flash +55%, HDD +35%, EF-Series +20%, Support +10%, Capacity Flash +5%

NetApp August 2026 price action (communicated Aug 3, effective Aug 15): high-performance flash (HPF/ASA/StorageGRID HPF) +55%; FAS/E-Series HDD and StorageGRID HDD +35%; EF-Series +20%; associated support +10%; Capacity Flash (CF) on ASA/StorageGRID +5%. Media type — not platform name alone — sets the uplift.

Eff. Aug 15, 2026
05
AUG
HPEPolicy Change

HPE Quote Validity Extended — Prices Now Locked From Issue Until Factory Ship (Deals up to $1M)

Effective August 5, 2026, HPE honours quoted hardware prices from the day of issue until the equipment leaves its factories, for Compute, Storage and GreenLake Flex deals up to $1M — replacing the 14-to-30-day validity windows introduced during the memory price surge. Buyers with long lead times should re-quote now to lock pricing through shipment.

Eff. Aug 05, 2026
01
AUG
Hitachi VantaraEnd of Sale + Pricing

Hitachi InfoFlash: VSP 5200/5600 End of Sale Dec 31, 2026 + Aug 1 Pricing

Partner Weekly InfoFlash (July 14, 2026): VSP 5200 and VSP 5600 end of sale December 31, 2026 (upgrades through Dec 31, 2029; end of service life Dec 31, 2031). VSP 5000 series and VSP One Block High End list pricing updates effective August 1, 2026 — unapproved quotes need new Deal Registration. Migration path: VSP One Block High End (HDD needs → VSP One Block 20 QLC).

Eff. Aug 01, 2026
15
JUL
HPEQuoting Rule

HPE Instant Price is best-and-final for small Compute, Storage, and GreenLake quotes

Partner notice dated 15 July 2026. Instant Price is the most competitive, best-and-final price up front for small-scale, simpler configurations, with the same discounting empowerment as HPE sellers. Covers Compute, Storage, and GreenLake. Split Compute and Storage quotes except GreenLake Flex, HPE Private Cloud Business Edition, and HPE Private Cloud AI. Escalate larger, complex, non-standard, or special commercial deals to an HPE salesperson. No dollar cutoff and no discount percent in the notice. Channel net outside Instant Price stays pending confirmation. No public PDF on this page.

Eff. Jul 15, 2026
05
JUN
JuniperPrice Change

HPE Juniper List Price Update — Effective June 5, 2026: EX, Security, Mist WAN Assurance & Selected RE SKUs

HPE Juniper Networking list price adjustments effective June 5, 2026 for EX, Security, Mist SaaS WAN Assurance, and selected Routing Engine SKUs. Aruba Switching and Edge Connect also updated; separate Aruba pricing action June 1. No planned reprice of existing quotes; Disti Orders on Hand / Velocity protection for orders on or before June 4.

Eff. Jun 05, 2026
20251 announcement effective this year

FAQ

End-of-Life (EOL) marks the last order date; End-of-Service / End-of-Support (EOS) is when the vendor stops patching and break-fix support. Both dates trigger refresh decisions for in-flight infrastructure.

Vendor notices are sourced from official vendor channels and refreshed whenever a new EOL, EOS, price, licensing, or security advisory is published. The timeline orders entries by effective date so upcoming deadlines surface first.

Cisco, HPE, Dell, Fortinet, Broadcom, Palo Alto Networks, Juniper, Aruba, F5, Hitachi, NetApp, and Huawei OceanStor Dorado are the primary tracked vendors. Use the vendor filter to focus on a single ecosystem.

Yes. Links tied to gated PDFs route through the request-download flow: customer email required, copy is CC'd to our info mailbox, original file is delivered privately rather than hotlinked.

Open the Request Quote form with intent 'bom-risk', include the affected SKUs and desired effective date, and our team will return a compatibility and delivery risk assessment within one business day.