Hyperscale NGFW / Specs

PA-5450: is the usable number 60 Gbps of threat prevention, or 189 Gbps with security services on?

5U modular ML-Powered NGFW — NC/DPC/MPC card sizing, 189 Gbps with security services, TLSv1.3 decryption at scale, and an RFQ checklist for hyperscale DC and multi-tenant edges.

Quick Take: Card-Scalable Top of the PA Fixed Lineup

Quick Take: Palo Alto PA-5450 is a 5U modular chassis with separate Networking, Data Processing, and Management Processing Cards. It delivers 189 Gbps with security services enabled, 60 Gbps Threat Prevention, and 16 million sessions on PAN-OS 12.1 numbers, scaling by card without chassis swaps. BENQUAN supplies PA-5450 with competitive pricing.

Figures follow the vendor PA-5450 Series datasheet (PAN-OS 12.1, April 2026). Confirm against your quote package, software train, and subscription set.

LIST ≠ net: This page has no public chassis dollars. Commercial LIST on the Palo Alto price-list landing is not channel net. Soft prices = industry estimate / pending confirmation until a dated RFQ returns. Soft Mbps/Gbps on the datasheet rows below stay pending confirmation against your dated PDF.

Adjacent guides:

Card Architecture: NC, DPC and MPC Subsystems

Quick Answer: The PA-5450 splits traffic processing across three card types: Networking Cards handle physical I/O and forwarding, Data Processing Cards run Threat Prevention and security processing, and Management Processing Cards host the control plane. Adding cards scales performance without replacing the chassis, and PAN-OS manages everything as one system.

Each card type handles a dedicated subsystem, so adding a DPC increases Threat Prevention throughput without touching network connectivity — and there is no per-card licensing complexity.

SubsystemCardPart NumberMax per ChassisFunction
NetworkingNC-APAN-PA-5400-NC-A8Physical I/O, packet classification, forwarding
Data ProcessingDPC-APAN-PA-5400-DPC-A8Threat prevention, IPS, AV, WildFire, URL filtering
ManagementMPC-APAN-PA-5400-MPC-A4Control plane, policy engine, logging, API
Sizing rule: Buy against Threat Prevention (60 Gbps) and the 189 Gbps security-services figure with your decryption profile — then size the DPC count and power for the final configuration, not the day-one build.

Model Ladder: Chassis vs Fixed Appliance

Quick Answer: Choose the PA-5450 when throughput headroom and card-level expansion drive the brief; choose the fixed PA-5445 when session density dominates — 48 million versus 16 million. Terabit-class inspection escalates to the PA-7500. Peer multi-vendor RFQs against the FortiGate 6000F chassis on equal assumptions.
DimensionPA-5400 Series (5445 peak)PA-5450
Form factorFixed 2U applianceModular 5U chassis
ArchitectureIntegrated CPU/memoryNC + DPC + MPC cards
Security services throughputN/A (not stated)189 Gbps
Threat Prevention76 Gbps60 Gbps
Firewall throughput90 Gbps120 Gbps
Sessions48M16M
Virtual systems25/2251/256
Card expansionNoneAdd NC/DPC/MPC cards
Naming traps: The session gap (48M on PA-5445 vs 16M on PA-5450) reflects the fixed appliance's session-density advantage — the chassis wins on throughput and expandability, not sessions. Evaluate on your primary constraint and confirm exact card SKUs on every quote.

Threat+SSL Sizing: The Numbers That Matter

Quick Answer: The PA-5450 delivers 189 Gbps with security services enabled — the highest in the PA portfolio. Firewall throughput reaches 120 Gbps, Threat Prevention 60 Gbps, and IPsec VPN 50 Gbps. Sessions scale to 16 million with 800,000 new sessions per second and up to 256 virtual systems.
MetricPA-5450
Security services throughput189 Gbps
Firewall (appmix)120 Gbps
Threat Prevention (appmix)60 Gbps
IPsec VPN50 Gbps
Max concurrent sessions16M
New sessions/sec800,000
Max security policies100,000
Virtual systems (base/max)1/256
Logging rate200,000 logs/sec

"With security services enabled" includes Threat Prevention, URL Filtering, WildFire, and file blocking inline. Threat Prevention (appmix) measured with App-ID, IPS, AV, antispyware, WildFire, and logging. Extra virtual systems require separate licenses.

Stop ranking platforms on the 120 Gbps firewall-only row. The 189 Gbps security-services and 60 Gbps Threat Prevention figures with your real decryption profile are the buying numbers — and they scale with DPC count.

Chassis, Slots & Power

Quick Answer: The 5U chassis takes 8 Networking Card, 8 Data Processing Card, and 4 Management Processing Card slots with N+N redundant 2,200 W supplies and 4x 4TB NVMe SSDs for logging. Front-panel I/O depends on the NC configuration — 40GbE QSFP+ or 100GbE QSFP28 densities.
ItemSpecification
Form factor5U, 19" rack (8.74" H x 17.36" W x 30.24" D)
Card slots8x NC, 8x DPC, 4x MPC (3 subsystems)
Networking I/OCard-dependent: 40GbE QSFP+, 100GbE QSFP28
Logging storage4x 4TB E1.S EDSFF NVMe SSDs
TPMIntegrated (secure boot / hardware root of trust)
PSU8x 2,200 W AC hot-swappable (N+N redundant)
HAActive/active and active/passive
ManagementDedicated OOB, RJ-45 console, Micro USB
  • Chassis SKU: PAN-PA-5450-AC-SYS; cards quoted separately at planned densities.
  • Start with fewer NC/DPC cards and add as traffic grows — but size PSU count and cooling for the final card population at initial order.

Redundancy, Subscriptions & Deployment Patterns

Quick Answer: Single-pass architecture with dedicated hardware subsystems keeps security throughput predictable: TLSv1.3 decryption with post-quantum-ready options, Precision AI cloud-delivered services, Advanced SD-WAN on the same chassis, and Panorama or Strata Cloud Manager operations. N+1 card redundancy and N+N power maintain carrier-grade uptime for multi-tenant deployments.

Deployment patterns

  • Hyperscale data-center edge: 100G handoffs with full Threat Prevention and TLS decryption; HA pair for carrier-grade resilience
  • Multi-tenant / service provider: up to 256 virtual systems with dedicated card resources per tenant; N+N power and N+1 card redundancy for SLA-backed deployments
  • Large campus segmentation: micro-segmentation and zero-trust enforcement across 100,000 policies and 16 million sessions
  • Subscriptions: Precision AI-powered Advanced Threat Prevention, Advanced URL Filtering, Advanced WildFire, Advanced DNS Security, plus IoT/OT and SaaS Security modules
Scope discipline: Session-density briefs above 16 million belong on the fixed PA-5445; terabit-class inspection on the PA-7500. Quote the PA-5450 when card-level scaling is the actual requirement.

RFQ Checklist: Freeze the Modular BOM

Quick Answer: Quote the chassis (PAN-PA-5450-AC-SYS), NC/DPC/MPC cards at planned densities, and the Precision AI or CDSS subscription set together. Size PSU count and cooling for the final card population at initial order, confirm the PAN-OS train, and compare against the FortiGate 6000F before locking the architecture.
  1. Threat Prevention and security-services target with decryption profile documented
  2. PA-5450 chassis vs fixed PA-5445 on throughput headroom vs session density
  3. NC / DPC / MPC card counts for the final configuration
  4. PSU count and cooling sized for the target card population
  5. NC port density: 40GbE QSFP+ vs 100GbE QSFP28
  6. Precision AI / CDSS subscription suites and term
  7. Virtual-system licenses beyond the base count
  8. HA design and Panorama or Strata Cloud Manager seats

BENQUAN GLOBAL LIMITED supplies the PA-5450 chassis, cards, and subscriptions with competitive pricing and configuration support. Search Palo Alto SKUs on SKU Lookup, then submit the BOM on rfq.html.

Frequently Asked Questions

Quick Answer: Buyers ask how the PA-5450 differs from the fixed PA-5445, whether it runs Precision AI subscriptions, and whether cards can be added later. It is the card-scalable top of the PA fixed lineup — choose it on throughput headroom, choose the PA-5445 on session density, and size power for the final card count.

Where is the PA-5450 / PA-5400 Series datasheet?

This page summarizes the PA-5450 Series datasheet for RFQ sizing: key specs, interfaces, performance envelopes, and use cases. Confirm software train and SKUs on the quote. BENQUAN GLOBAL LIMITED supplies PA-5450 Series with competitive pricing and BOM risk review.

PA-5450 vs PA-5445 — which should I choose?

PA-5450 is a modular chassis for card-level scalability at the very top of the PA lineup; PA-5445 is a fixed 2U appliance with higher session capacity (48M vs 16M). Choose based on whether throughput headroom and modular expandability or session density drives your brief.

Does PA-5450 support Precision AI subscriptions?

Yes — the platform runs all Precision AI-powered CDSS subscriptions including Advanced Threat Prevention, Advanced URL Filtering, Advanced WildFire, and Advanced DNS Security, plus IoT/OT Security and SaaS Security modules.

Can I add cards to an existing PA-5450 chassis?

Yes — the modular design lets you add NC, DPC, or MPC cards as traffic grows. Ensure the chassis PSU capacity and cooling are sized for the target card count at initial order to avoid mid-life upgrades.

Where to buy PA-5450?

BENQUAN GLOBAL LIMITED supplies PA-5450 chassis, cards, and subscriptions. Contact info@benquan.hk or request a quote for configuration support and lead time.

Key Takeaway

Key Takeaway: PA-5450 is a 5U modular chassis with separate Networking, Data Processing, and Management Processing Cards: 189 Gbps with security services, 60 Gbps Threat Prevention, and 16 million sessions on PAN-OS 12.1. Card-based scaling upgrades performance without chassis replacement. BENQUAN GLOBAL LIMITED supplies the PA-5450 with competitive pricing.

PA-5450 chassis or PA-5445 appliance? Card count decides the budget

The modular PA-5450 starts with a base chassis, then NC, DPC, and MPC cards stack the cost differently than a fixed PA-5445 appliance. Click below for a free compatibility and delivery risk assessment with your throughput target, card count, decryption profile, and 100G uplink plan.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk

Contents