Data-Center NGFW / Specs

PA-5410–5445: Threat ~32–76 Gbps?

Official-style PA-5400 Series datasheet summary for RFQ — 2U ML-Powered NGFW with shared 25G/100G I/O, Threat Prevention from PA-5410 to PA-5445, session-scale planning, subscriptions, and a DC-edge BOM checklist.

Quick Take: One I/O Layout, Five Performance Tiers

Quick Take: Palo Alto PA-5400 is a 2U ML-Powered NGFW line with shared dense I/O including 4x 40/100G ports. Threat Prevention scales roughly 32 to 76 Gbps from PA-5410 to PA-5445 on PAN-OS 12.1 numbers, and sessions reach 48 million on PA-5445. BENQUAN supplies PA-5400 with competitive pricing.

Performance below is from the vendor PA-5400 Series datasheet (PAN-OS 12.1). Confirm against your quote's software train, subscription bundle, and virtual system licensing.

Adjacent guides:

Single-Pass Platform: What All Five Models Share

Quick Answer: All five models — PA-5410, PA-5420, PA-5430, PA-5440, and PA-5445 — share PAN-OS single-pass architecture, ML-Powered NGFW controls, active/active and active/passive HA, and 5G-native security. They also share one front-end I/O layout, so the buying choice is throughput, sessions, and virtual system count rather than ports.

Because the panel is identical, quotes should never be ranked on port maps. The models separate on inspected throughput, session capacity, and licensed virtual systems.

DimensionPA-5400 Series (all models)
RoleData-center edge, large internet gateway, SP / multi-access edge
OS / ops planePAN-OS + Panorama / Strata Cloud Manager
Form factor2U, redundant 1,200 W PSUs
HAActive/active, active/passive, clustering
5G-native securityYes — validate feature licenses per train
Sizing rule: Buy against Threat Prevention (appmix, 32-76 Gbps) with your decryption profile — not the 52-90 Gbps firewall-only band — and let the session forecast pick the model.

Model Ladder: PA-5410 Through PA-5445 and Neighbors

Quick Answer: Step up from the 1U PA-3400 class when uplink density, session count, or Threat Prevention headroom exceeds the PA-3440. Above this line sit the hyperscale PA-5450 and chassis PA-7500. Peer multi-vendor RFQs against the FortiGate 1800F or 3000F tier on equal threat+SSL assumptions.
Site roleModelWhy it fitsEscalate / peer
1U gateway tierPA-3410 to PA-3440Up to ~20 Gbps TP, 3M sessionsPA-3400 specs
DC edge, moderate sessionsPA-5410 / 5420 / 543032-60 Gbps TP, 5-9M sessionsThis page
High-session DC edgePA-5440 / 544570-76 Gbps TP, 20-48M sessionsThis page
Hyperscale fixedPA-5450Higher TP and session ceilingsPA-5450 specs
Multi-vendor bake-offFortiGate 1800F / 3000F tierSame DC role on FortiOS3000F/3500F/3700F specs
Naming traps: The PA-5445 is not just "a faster 5440" — its 48M-session ceiling is the whole point. Extra virtual systems beyond the base count need licenses on every model. Confirm exact SKUs and the PAN-OS train on every quote.

Threat / App-ID Throughput Rows: The Numbers That Matter

Quick Answer: Size on the Threat Prevention (App-ID) row — not firewall-only. Firewall (appmix) runs 52 to 90 Gbps; Threat Prevention with App-ID, IPS, AV, antispyware, WildFire, file blocking, and logging runs 32 to 76 Gbps; IPsec VPN 20 to 64 Gbps. Sessions separate the models hardest: 5 to 9 million on PA-5410 through PA-5430, then 20 million on PA-5440 and 48 million on PA-5445. Soft Mbps/Gbps = industry estimate / pending confirmation against your dated PAN-OS datasheet.
Metric (datasheet row)PA-5410PA-5420PA-5430PA-5440PA-5445
Firewall only (appmix)52 Gbps*70 Gbps*80 Gbps*85 Gbps*90 Gbps*
Threat Prevention / App-ID (appmix)32 Gbps*50 Gbps*60 Gbps*70 Gbps*76 Gbps*
IPsec VPN20 Gbps*28 Gbps*42 Gbps*58 Gbps*64 Gbps*
Max concurrent sessions5M7M9M20M48M
New sessions/sec270,000370,000380,000390,000449,000
Virtual systems (base/max)10/2015/6525/12525/22525/225

*Soft throughput: industry estimate / pending confirmation — freeze the PAN-OS train and re-read the vendor PDF footnote before award math. Threat Prevention row already includes App-ID; do not invent a separate App-ID Mbps column unless your dated datasheet prints one.

Stop ranking models on the firewall-only Gbps band — PA-5430 through PA-5445 sit within 10 Gbps of each other there. Session capacity is where they separate: pick on the wrong metric and you either overpay or hit a wall. Method for Threat vs firewall-only rows: NGFW throughput datasheet vs real.

PA-5410 Front Panel, Ports & Chassis

Quick Answer: Every model shares the same front panel: eight multigig copper ports, twelve SFP/SFP+, four SFP28 25G, and four QSFP+/QSFP28 40/100G. The 2U chassis takes fully redundant 1,200 W supplies drawing roughly 630 W average, with a pair of 480 GB SSDs and an integrated TPM. Port layout never tells PA-5410 from PA-5420 or PA-5440 — see Front Panel ID.
ItemSpecification
Form factor2U, 19" (3.45" H x 22.5" D x 17.34" W)
Data I/O8x 1/2.5/5/10G copper; 12x 1/10G SFP/SFP+; 4x 1/10/25G SFP28; 4x 40/100G QSFP+/QSFP28
Management / HA1x 1/10G OOB; 2x 1/10G HA; 1x 40G QSFP+ HA; RJ-45 console; Micro USB
Storage480 GB SSD pair
TPMIntegrated
PSU2/2 fully redundant; 1,200 W output each
Weight~35.2 lb device / ~48.8 lb as shipped
MTBF22 years (vendor)
  • I/O is identical on all five models — never shortlist on ports.
  • Budget SFP28 and QSFP28 optics as separate BOM lines.

How do I identify PA-5410, PA-5420, or PA-5440 from the front panel?

Quick Answer: You cannot. PA-5410, PA-5420, PA-5430, PA-5440, and PA-5445 share one front-panel I/O map. Identify the model from the chassis label / serial sticker, the ordering MPN (PAN-PA-5410, PAN-PA-5420, PAN-PA-5440, …), or PAN-OS system info — never from a port photo.
  1. Step 1 — Ignore the port drawing. Copper, SFP/SFP+, SFP28, and QSFP28 counts match across the series.
  2. Step 2 — Read the chassis label. Confirm the printed model name (PA-5410 / PA-5420 / PA-5440) and serial before you compare quotes.
  3. Step 3 — Freeze the ordering MPN. Write PAN-PA-5410, PAN-PA-5420, or PAN-PA-5440 (plus siblings) as separate RFQ lines — not “PA-5400” alone.
  4. Step 4 — Confirm on software if online. Check system information / inventory on the live box so the PO matches the appliance on the floor.

Buyers searching “PA-5410 front panel” or “PA-5440 datasheet ports” land on the same I/O table above. The buy decision is Threat Prevention / App-ID throughput and session scale — not a different faceplate.

Subscriptions, Capabilities & Deployment Patterns

Quick Answer: Single-pass architecture keeps performance predictable once subscriptions are enabled: TLSv1.3 decryption with post-quantum-ready options, Precision AI cloud-delivered services, Advanced SD-WAN on the same appliance, and Panorama or Strata Cloud Manager operations. Deploy at data-center edges, large internet gateways, and 5G or multi-access edge sites.

Deployment patterns

  • Data-center / cloud edge: 100G handoffs with Threat Prevention and selective TLS decryption; HA pair for resilience
  • Service provider / 5G MEC: 5G-native security for SP and multi-access edge — validate feature licenses for your train
  • High-session environments: once concurrent-session forecasts pass roughly 10 million, evaluate PA-5440 and PA-5445 specifically
  • Subscriptions: Inline ML for unknown threats, Device Security, SaaS Security, AI Access Security; NGFW clustering combines with HA for horizontal scale
Scope discipline: Gateway-tier sites stay on the PA-3400; terabit-class inspection belongs on the PA-7500 chassis. Where ASIC price-performance is in scope, compare against the FortiGate 6000F before committing.

RFQ Checklist: Freeze the PA-5400 BOM

Quick Answer: Quote the chassis, optics, CDSS or Threat Prevention suites, and support together. Match the model to Threat Prevention and session targets rather than firewall throughput alone, budget virtual system licenses beyond the base count, and compare ASIC price-performance against the FortiGate 6000F before committing the BOM.
  1. Threat Prevention target with decryption profile documented
  2. Concurrent-session forecast — the primary model selector (5M to 48M)
  3. Model: PA-5410 / 5420 / 5430 vs PA-5440 / 5445 on sessions
  4. SFP28 / QSFP28 optics beyond the chassis
  5. CDSS / Threat Prevention subscription suites and term
  6. Virtual system licenses beyond the base count
  7. HA design: active/active, active/passive, or clustering
  8. Panorama or Strata Cloud Manager seats and log collection

BENQUAN GLOBAL LIMITED supplies the PA-5400 Series and subscriptions with competitive pricing and configuration support. Search Palo Alto SKUs on SKU Lookup, then submit the BOM on rfq.html.

RFQ checklist before you PO

Quick Answer: Freeze model and option SKUs, support or subscription years, ship-by date, and HA or spare needs on one dated ATP before you compare channel prints. Use the checklist below, validate lines on SKU Lookup when the brand is indexed, then open a BOM risk RFQ — soft channel prices stay industry estimate or pending confirmation.

  • Model / MPN lines — chassis and options matching this page (not a vague family name).
  • Quantities + HA — single unit vs pair; spare FRUs if required.
  • Support / subscription years — tier and term on the same quote as hardware.
  • Ship-by / quote validity — lock reprice-until-ship language when memory or list cliffs apply.
  • Acceptance — Service Tag / serials vs PO; reject surprise third-party parts without paperwork.

Free Compatibility & Delivery Risk Assessment · Palo Alto SKU Lookup

Which Part Numbers Should You Freeze on the RFQ (1 SKUs)?

Quick Answer: When quoting PAN-PA-5550 and sibling configurations across these 1 part numbers, lock the exact base MPN, redundant power supplies, optics, and matching 1-year or 3-year support tier on separate lines before comparing vendor discounts. Channel net pricing remains industry estimate / pending confirmation.

Ordering SKUKey Configuration & BoundaryAdjacent BOM Lines to Freeze
PAN-PA-5550175 Gbps firewall appmix, 120 Gbps Threat Prevention, 100 Gbps IPsec, 49 million sessions. HA, ATP, premium support as separate lines.PAN-PA-5550-AC, PAN-PA-5550-AC ×2, PAN-PA-5550-ATP term, Premium years on 5550

Frequently Asked Questions

Quick Answer: Buyers ask how to read Threat/App-ID rows, how to tell PA-5410 from PA-5420 or PA-5440 on the front panel, how PA-5430 differs from PA-5440, and where to source the series. Ports are identical on all five appliances — models separate on Threat Prevention and session capacity. Soft Mbps/Gbps stay pending confirmation against your dated datasheet.

Where can I find the PA-5400 Series datasheet?

This page summarizes the PA-5400 Series datasheet for RFQ sizing: Threat/App-ID throughput rows, shared front-panel I/O, and use cases. Confirm software train and SKUs on the quote. Gbps figures are industry estimate / pending confirmation against your dated vendor datasheet. BENQUAN GLOBAL LIMITED supplies PA-5400 Series with competitive pricing and BOM risk review.

How do I identify PA-5410 vs PA-5420 vs PA-5440 from the front panel?

You cannot tell them apart by port layout — all five share one front panel. Read the chassis model label / serial sticker, the ordering MPN (PAN-PA-5410, PAN-PA-5420, PAN-PA-5440, …), or show system info on PAN-OS. Ports never select the model.

PA-5430 vs PA-5440?

Similar firewall Gbps band, but PA-5440 jumps to 20M sessions and 70 Gbps Threat Prevention vs 9M / 60 Gbps on PA-5430. Choose 5440 when session scale dominates. Soft Mbps/Gbps pending confirmation on your dated datasheet.

Are I/O ports the same on every PA-5400?

Yes — datasheet lists a common I/O set; models differ primarily in performance and capacity ratings.

Where to buy PA-5400?

BENQUAN GLOBAL LIMITED supplies PA-5400 series and subscriptions. Contact info@benquan.hk or request a quote.

Key Takeaway

Key Takeaway: PA-5400 is Palo Alto's 2U data-center NGFW line with shared dense I/O including 4x 40/100G ports. Threat Prevention scales 32 to 76 Gbps and sessions reach 48 million on PA-5445 — pick on sessions and Threat Prevention, not firewall Gbps. BENQUAN GLOBAL LIMITED supplies the PA-5400 Series with competitive pricing.

Session count decides this one, not Gbps

Between PA-5430 and PA-5445 the throughput gap is modest but session capacity rises from 9M to 48M — pick on the wrong metric and you either overpay or hit a wall. Click below for a free compatibility and delivery risk assessment with your session forecast, decryption profile, and 100G uplink plan.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk

Contents