Internet Gateway NGFW / Specs

PA-3410 7.5 to PA-3440 20 Gbps TP?

1U ML-Powered internet-gateway NGFW line — Threat Prevention sizing from PA-3410 to PA-3440, 25G/100G uplink planning, TLSv1.3 decryption, and an RFQ checklist for campus and regional edges.

Quick Take: The 1U Internet-Gateway Tier

Quick Take: Palo Alto PA-3400 is a 1U internet-gateway NGFW family. Size on Threat Prevention (appmix): 7.5 Gbps on PA-3410 rising to 20 Gbps on PA-3440, using PAN-OS 12.1 datasheet numbers. All four models carry 25G SFP28 ports; PA-3430 and PA-3440 add dual 40/100G QSFP28. BENQUAN supplies PA-3400 with competitive pricing.

Figures follow the vendor PA-3400 Series datasheet measured on PAN-OS 12.1. Confirm against the quote package for your software train.

Adjacent guides:

Single-Pass Platform: What All Four Models Share

Quick Answer: PA-3410, PA-3420, PA-3430, and PA-3440 share one PAN-OS feature set: App-ID with user and content classification, machine learning in the core for inline signatureless file and phishing prevention, active/active and active/passive HA, and central management through Panorama or Strata Cloud Manager. They differ only in throughput, capacity, and uplink density.

Because the feature set is identical, the buying decision reduces to three numbers: Threat Prevention with your decryption profile, concurrent sessions, and whether 40/100G uplinks are required.

DimensionPA-3400 Series (all models)
RoleCampus / HQ internet gateway, regional edge
OS / ops planePAN-OS + Panorama / Strata Cloud Manager
Form factor1U, redundant 450 W AC supplies
HAActive/active and active/passive
Virtual systems1 base / 11 max (license)
Sizing rule: Quote against Threat Prevention (7.5-20 Gbps) with your decryption profile — not the 14-35 Gbps firewall-only band — and let the uplink plan decide between the 3420 and 3430.

Model Ladder: PA-3410 Through PA-3440 and Neighbors

Quick Answer: Choose the PA-3410 or PA-3420 for a single-site internet edge; move to the PA-3430 or PA-3440 when 40/100G uplinks, more than 2.2 million sessions, or Threat Prevention above 10 Gbps is required. Step up to the PA-5400 Series for data-center scale, and peer against the FortiGate 400F-900G band.
Site roleModelWhy it fitsEscalate / peer
Branch tier belowPA-1410 / 1420Branch-class TP and portsPA-1400 specs
Single-site edgePA-3410 / 34207.5-10 Gbps TP, 25G SFP28This page
100G gateway / regionalPA-3430 / 344015-20 Gbps TP, dual 40/100G QSFP28This page
DC tier abovePA-5410 to PA-544532-76 Gbps TP, 5-48M sessionsPA-5400 specs
Multi-vendor bake-offFortiGate 400F / 600F / 900GSame gateway band on FortiOS400F vs PA-3410 / 600F/900G vs PA-3400
Naming traps: The PA-3430 is not just "a faster 3420" — the dual 40/100G uplinks are the structural difference. All four models cap at 11 licensed virtual systems; multi-tenant briefs beyond that belong on the PA-5400 tier. Confirm exact SKUs on every quote.

Threat+SSL Sizing: The Numbers That Matter

Quick Answer: Firewall throughput (appmix) scales 14, 19, 29, and 35 Gbps across PA-3410 to PA-3440, with Threat Prevention at 7.5, 10, 15, and 20 Gbps and IPsec VPN from 6.6 to 14.5 Gbps. Concurrent sessions run 1.4 to 3 million, and new sessions per second from 145,000 to 268,000.
MetricPA-3410PA-3420PA-3430PA-3440
Firewall (appmix)14 Gbps19 Gbps29 Gbps35 Gbps
Threat Prevention (appmix)7.5 Gbps10 Gbps15 Gbps20 Gbps
IPsec VPN6.6 Gbps9.9 Gbps12 Gbps14.5 Gbps
Max concurrent sessions1.4M2.2M2.5M3M
New sessions/sec145,000220,000240,000268,000
Virtual systems (base/max)1/111/111/111/11

Threat Prevention includes App-ID, IPS, AV, antispyware, WildFire, file blocking, and logging (appmix). Extra virtual systems need separate licenses.

Stop ranking models on the firewall-only row. Threat Prevention with your real decryption profile is the buying number — and the 3420-to-3430 jump is about 40/100G uplinks as much as throughput. Soft Mbps/Gbps = industry estimate / pending confirmation. Row-selection method: NGFW throughput datasheet vs real.

PA-3400 Front Panel, Ports & Chassis

Quick Answer: Every model provides 12 multigig copper ports, 10 SFP/SFP+, and 4 SFP28 25G; the PA-3430 and PA-3440 add two QSFP/QSFP28 40/100G ports. The 1U chassis carries redundant 450 W AC supplies, a 480 GB SSD, and an integrated TPM for secure boot.
ItemSpecification
Form factor1U, 19" rack (14.15" x 17.15" x 1.70")
Data I/O (all models)12x 1-10G multigig copper; 10x SFP/SFP+; 4x SFP28 25G
Extra uplinks (3430/3440)2x QSFP/QSFP28 40/100G
Management / HA1x 100/1000 OOB; 2x 100/1000 HA; 1x 10G SFP+ HA; RJ-45 console; Micro USB
Storage480 GB SSD
TPMIntegrated (secure boot / root of trust)
PSURedundant 450 W AC (~133 W avg / ~190 W max)
MTBF22 years (vendor)
  • Budget SFP28 and QSFP28 optics as separate BOM lines.
  • The 40/100G decision between PA-3420 and PA-3430 changes the optics budget as much as the chassis price.

Decryption, Subscriptions & Deployment Patterns

Quick Answer: Single-pass packet processing keeps throughput predictable with subscriptions enabled: SSL/TLS decryption through TLSv1.3 with optional post-quantum-ready key exchange, decryption policy scoped by URL category, zone, user, device, or port, plus cloud-delivered Threat Prevention, WildFire, URL Filtering, and SaaS Security. A native web proxy option consolidates firewall and proxy operations.

Deployment patterns

  • High-speed internet gateway: terminate ISP handoffs, enforce App-ID and Threat Prevention, decrypt outbound TLS where policy allows
  • Hybrid identity / Zero Trust edge: tie users via Cloud Identity Engine; apply dynamic user groups and MFA at the network layer for legacy apps
  • Branch aggregation / SD-WAN: enable Advanced SD-WAN on the same NGFW where path steering and security converge
Scope discipline: Branch sites stay on the PA-1400; data-center throughput belongs on the PA-5400 Series or the FortiGate 6000F alternative. Shortlist the PA-3400 only for the 10-25G gateway band.

RFQ Checklist: Freeze the Gateway BOM

Quick Answer: Quote the chassis, optics, subscriptions — Threat Prevention, WildFire, URL Filtering, or a CDSS suite — and support as one package. Confirm the PAN-OS train behind your figures, HA pair counts, extra virtual-system licenses beyond the base one, and whether 100G ports are required before locking the model.
  1. Threat Prevention target with decryption profile documented
  2. Session forecast: 1.4M (3410) to 3M (3440)
  3. Uplink decision: 25G-only (3410/3420) vs dual 40/100G (3430/3440)
  4. SFP28 / QSFP28 optics beyond the chassis
  5. Subscription suite: Threat Prevention, WildFire, URL Filtering, or CDSS bundle and term
  6. Virtual-system licenses beyond the base one
  7. HA design: active/active or active/passive pairs
  8. Panorama or Strata Cloud Manager seats and log collection

BENQUAN GLOBAL LIMITED supplies the PA-3400 Series and subscriptions with competitive pricing and configuration support. Search Palo Alto SKUs on SKU Lookup, then submit the BOM on rfq.html.

RFQ checklist before you PO

Quick Answer: Freeze model and option SKUs, support or subscription years, ship-by date, and HA or spare needs on one dated ATP before you compare channel prints. Use the checklist below, validate lines on SKU Lookup when the brand is indexed, then open a BOM risk RFQ — soft channel prices stay industry estimate or pending confirmation.

  • Model / MPN lines — chassis and options matching this page (not a vague family name).
  • Quantities + HA — single unit vs pair; spare FRUs if required.
  • Support / subscription years — tier and term on the same quote as hardware.
  • Ship-by / quote validity — lock reprice-until-ship language when memory or list cliffs apply.
  • Acceptance — Service Tag / serials vs PO; reject surprise third-party parts without paperwork.

Free Compatibility & Delivery Risk Assessment · Palo Alto SKU Lookup

Frequently Asked Questions

Quick Answer: Buyers ask how the PA-3420 differs from the PA-3430, whether TLSv1.3 decryption is supported, and where to source the series. The PA-3430 adds dual 40/100G uplinks and higher ratings; decryption covers SSLv3 through TLSv1.3. Confirm the PAN-OS train and SKUs on the quote before ordering.

Where can I find the PA-3400 Series datasheet?

This page summarizes the PA-3400 Series datasheet for RFQ sizing: key specs, interfaces, performance envelopes, and use cases. Confirm software train and SKUs on the quote. BENQUAN GLOBAL LIMITED supplies PA-3400 Series with competitive pricing and BOM risk review.

PA-3420 vs PA-3430?

PA-3430 adds dual 40/100G ports and higher firewall/TP ratings (29/15 Gbps vs 19/10 Gbps). Choose 3430 when uplinks or TP headroom need the jump.

Does PA-3400 support TLSv1.3 decryption?

Yes — datasheet covers SSLv3 through TLSv1.3 with classical and selected PQC key-exchange options on supported PAN-OS.

Which PA-3400 datasheet row should I size on — Threat Prevention or firewall-only?

Size and RFQ on Threat Prevention (App-ID + IPS + related blades with your decryption profile) — not the higher firewall-only appmix row (14–35 Gbps). Firewall-only figures are not award math for a production NGFW. Soft Mbps/Gbps stay pending confirmation on your dated datasheet. Full method (which row to circle, why firewall ≫ threat): NGFW throughput datasheet vs real 2026. Do not open a separate sizing slug for this question.

Where to buy PA-3400?

BENQUAN GLOBAL LIMITED supplies PA-3400 series and subscriptions. Contact info@benquan.hk or request a quote.

Key Takeaway

Key Takeaway: PA-3400 is Palo Alto's 1U internet-gateway NGFW family: Threat Prevention from 7.5 Gbps on PA-3410 to 20 Gbps on PA-3440, 25G SFP28 on every model, and dual 40/100G on the top two. Size on Threat Prevention with your decryption profile. BENQUAN GLOBAL LIMITED supplies the PA-3400 Series with competitive pricing.

PA-3420 or PA-3430? The 100G decision changes the price

The jump from PA-3420 to PA-3430 buys 40/100G uplinks and Threat Prevention headroom you may not need — or may need in eighteen months. Click below for a free compatibility and delivery risk assessment with your throughput target, decryption profile, and uplink plan.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk

Contents