Quick Take: Why This Fork Exists Now
Start with the F-series EoO migration map for calendar and 70F/80F/100F → 90G/120G sequencing. Use 90G vs 120G specs when the estate stays Fortinet-only.
Not this page:
- FortiGate 40F vs PA-440 — micro-branch fanless desktop; PA-410/415 peers FG-40F
- PA-400 vs FortiGate 100F — legacy outgoing F-series framing, not G-series successors
Architecture Fork: FortiOS Fabric vs PAN-OS / Panorama
Both platforms cover mid-branch Threat Prevention with SSL inspection. The decision is ops gravity plus which chassis inherits your 80F/100F site map after EoO.
| Dimension | FortiGate 90G / 120G | Palo Alto PA-400 (440/450) |
|---|---|---|
| Role after EoO | G-series successors for 80F-class (90G) and 100F-class (120G) | Mid-branch desktop peers for the same site roles |
| OS / ops plane | FortiOS + FortiManager / Security Fabric | PAN-OS + Panorama / Strata Cloud Manager |
| Form factor | 90G desktop; 120G 1U with SFP / 10GE FortiLink | Mostly 1G copper desktop; PoE on selected SKUs |
| TP class (datasheet) | ~2.2 Gbps (90G) / ~2.8 Gbps (120G) | ~1.2 Gbps (PA-440) / ~2.1 Gbps (PA-450) |
| Subscription stack | FortiCare + FortiGuard UTP / ATP | Threat Prevention + WildFire + DNS Security |
Honest Peer Mapping: 80F/100F → G-Series or PA-440/450
Map by outgoing F-series role. Do not copy micro-branch PA-410 logic onto mid-branch EoO refreshes.
| Migration intent | Fortinet G-series | Palo Alto peer | Honesty note |
|---|---|---|---|
| 80F-class branch | FortiGate 90G | PA-440 or PA-450 | 90G TP exceeds PA-440 — PA-450 is fairer when decryption is mandatory |
| 100F-class edge | FortiGate 120G | PA-440/445 or PA-450/455 | 120G adds 1U, SFP, 10GE FortiLink — match the port brief |
| PoE phones / AP | FWF-90G / FPOE-90G class | PA-415 / 445 / 455 PoE SKUs | Only when PoE is on the firewall BOM |
| Micro-branch | FortiGate 40F / 60F | PA-410 / PA-415 | Use the 40F guide — not this page |
| 200F-class | FortiGate 200G (escalate) | PA-450/460 or PA-1400 class | Do not force 120G into a 200F refresh |
Threat+SSL Sizing: Equal Assumptions Only
Size on Threat Prevention with SSL decryption enabled — not firewall-only Gbps. Force identical appmix, logging, and decryption policy on both vendor lines.
Figures follow Fortinet FortiGate 90G Series datasheet and Palo Alto Networks PA-400 Series datasheet (enterprise traffic mix; methodology footnotes apply).
| Metric (datasheet class) | FG-90G | FG-120G | PA-440 | PA-450 |
|---|---|---|---|---|
| Threat protection | ~2.2 Gbps | ~2.8 Gbps | ~1.2 Gbps | ~2.1 Gbps |
| Concurrent sessions | ~3M | ~3M | ~200K | ~300K |
| SSL inspection stack | UTP / ATP | UTP / ATP | TP + WildFire + DNS | Same CDSS stack |
Ports, HA & Subscription Parity
Port and form-factor reality
- 90G desktop: GE-heavy; no native SFP on base SKUs — fiber uplink sites should shortlist 120G
- 120G 1U: GE SFP + 10GE FortiLink and dual PSU — common 100F-class successor
- PA-440/450: mostly 1G copper desktop; PoE and combo SFP on selected SKUs — confirm the exact port map
- HA pairs: active/passive or active/active on both — include cable kits and spare chassis
Subscription lines to equalize
| BOM line | Fortinet path | Palo Alto path |
|---|---|---|
| Threat stack | UTP or ATP FortiGuard | TP + WildFire + DNS Security |
| Support | FortiCare 24x7 — confirm tier | Premium / partner support — same term |
| HA | A/P or A/A + cable kit | HA pair + session sync assumptions |
| Management | FortiManager seats if centralized | Panorama / Strata seats if centralized |
Lean Fortinet when: FortiManager runbooks, FortiSwitch/FortiAP adjacency, and FortiOS SD-WAN are already standardized.
Lean Palo Alto when: Panorama templates, App-ID libraries, and Strata Cloud Manager define branch rollout at scale.
Ops Plane & Adjacent RFQs
Appliance choice follows the management plane your NOC already runs. Keep micro-branch, campus-core, and SD-WAN overlay licensing on separate BOM lines.
- FortiManager vs Panorama — decide the ops plane when the estate is still mixed
- PA-400 Series specs — full PA-410 through PA-460 ladder
- Cisco Secure Firewall vs FortiGate — third column when FTD/FMC skill dominates risk
- FortiGate vs Prisma/PAN SD-WAN — overlay licensing is a separate RFQ line
RFQ Checklist: Dual-Vendor Post-EoO BOM
One F-series migration brief → FortiGate 90G/120G line items → Palo Alto PA-440/450 line items → equal threat+SSL, ports, HA, subscriptions, and lead times.
- Per-site outgoing model (70F/80F/100F) and mapped successor (90G or 120G)
- Threat+SSL throughput target with decryption policy stated
- Session count, VPN tunnel count, SSL-VPN users
- Port mix: GE vs SFP vs 10GE FortiLink; PoE or 5G if required
- Form factor: desktop 90G vs 1U 120G vs PA-400 desktop
- HA: active/passive or active/active; cable kit and spare chassis
- Fortinet: exact FG SKU, FortiCare tier, UTP/ATP bundle, term years
- Palo Alto: exact PA SKU (440/450 class), TP/CDSS bundle, support term
- Management: FortiManager vs Panorama seats if applicable
- Lead time: G-series ATP vs channel F-series leftovers vs PA-400 stock
- Exclusions: micro-branch 40F tier and campus-core SKUs on separate lines
- 3–5 year subscription term on both quotes
BENQUAN GLOBAL LIMITED supplies FortiGate 90G/120G and Palo Alto PA-400 Series with competitive pricing and configuration support. Use SKU Lookup, then submit the dual-vendor brief on rfq.html.
Frequently Asked Questions (FAQ)
Do I need PAN-PA-400-POE-PWR-150W vs FortiGate 90G/120G?
Neither is universally better. Fortinet often wins Security Fabric continuity mapping 80F/100F to G-series. Palo Alto often wins Panorama/Strata estates at PA-440/450. Dual-RFQ matched threat+SSL and subscriptions.
Does FortiGate 90G peer with PA-440?
Yes as a mid-branch peer for 80F-class sites on equal SSL assumptions. Step to PA-450 when decryption headroom is tight. Do not use PA-410/415 micro-branch peers.
Can I reuse the 40F vs PA-440 peer map?
No. That guide is micro-branch fanless desktop sizing. This RFQ is mid-branch EoO refresh: 90G/120G vs PA-440/450 with different throughput, ports, and HA needs.
120G or PA-440 for 100F-class sites?
FortiGate 120G is the Fortinet 100F-class G-series successor. PA-440/450 carries the same branch role. Dual-RFQ both on matched threat+SSL, ports, and HA.
Where to RFQ both platforms?
BENQUAN GLOBAL LIMITED supplies FortiGate 90G/120G and Palo Alto PA-400 with competitive pricing. Submit one RFQ with the migration map and checklist above.