Quick Take: The Campus-to-DC Bridge Tier
Quick Take: FortiGate 900G and 901G are Fortinet's mid-high 1U NGFWs with NP7 plus CP9, delivering roughly 164 Gbps firewall and 30 Gbps threat protection on the enterprise mix, with 25GE ultra-low-latency ports. Choose the 901G for dual 480 GB SSDs. BENQUAN supplies FG-900G/901G with competitive pricing.
Figures follow Fortinet FortiGate 900G Series datasheets (enterprise traffic mix; methodology footnotes apply). Confirm the FortiOS train, FortiGuard bundle, and HA design on the quote.
Adjacent guides:
- 600F/900G vs PA-3400 — dual-vendor aggregation bake-off
- FortiGate 100F & 200F specs — the branch tier below
- FortiGate 3000F/3500F/3700F specs — the DC tier above
NP7/CP9 Security Fabric Node in 1U
Quick Answer: The 900G runs FortiOS with NP7 and CP9 acceleration, combining NGFW, Secure SD-WAN, Universal ZTNA, and segmentation in one Security Fabric node. It fills the gap between branch-class 100F/200F boxes and the 3000F data-center tier, and FortiLink turns FortiSwitch ports into a logical extension of the firewall.
Hardware acceleration keeps SSL inspection and IPS practical at the mid-enterprise edge, while FortiLink converges secure access — switch and AP ports inherit firewall policy without separate NAC overlays.
| Dimension | FG-900G / 901G |
|---|---|
| Role | Campus/HQ edge, mid-DC perimeter, SD-WAN hub, FortiLink core |
| SPU complement | NP7 + CP9 |
| Form factor | 1U, dual hot-swap PSU |
| Default VDOMs | 10/10 |
| SSL-VPN guidance | ~10,000 tunnel-mode class |
Model Ladder: Where the 900G Fits
Quick Answer: Step up from the 100F/200F class when 25GE uplinks and roughly 30 Gbps threat protection are required; step to the 3000F/3500F/3700F tier or 6000F chassis for data-center scale. Peer multi-vendor RFQs against the Palo Alto PA-3400 class or Check Point Quantum Force on equal threat+SSL assumptions.
| Site role | Model | Why it fits | Escalate / peer |
|---|---|---|---|
| Branch / small campus | FG-100F / 200F | GE/10GE density, lower TP ceilings | 100F/200F specs |
| Campus / mid-DC edge | FG-900G / 901G | ~30 Gbps TP, 25GE ULL, FortiLink scale | This page |
| DC core tier | FG-3000F / 3500F / 3700F | 33-75 Gbps TP, 100GE/400GE | 3000F/3500F/3700F specs |
| Chassis scaling | FG-6300F / 6500F | FPC parallelism, 200M sessions | 6000F specs |
| Multi-vendor bake-off | PA-3400 / Quantum Force | Same aggregation role on PAN-OS / Quantum | PA-3400 / Quantum Force |
Threat+SSL Sizing: The Numbers That Matter
Quick Answer: On the enterprise traffic mix, the 900G posts 42 Gbps IPS, 31 Gbps NGFW, and 30 Gbps threat protection; IPv4 firewall reaches 164 Gbps at 1518-byte with about 28 million sessions. SSL inspection lands near 16.7 Gbps — size on threat protection with your documented SSL percentage.
| Metric (published*) | FG-900G / 901G |
|---|---|
| IPv4 firewall (1518/512/64 UDP) | 164 / 163 / 153 Gbps |
| IPS | 42 Gbps |
| NGFW | 31 Gbps |
| Threat protection | 30 Gbps |
| IPsec VPN (512-byte) | ~55 Gbps |
| SSL inspection (IPS, avg HTTPS) | ~16.7 Gbps |
| Concurrent sessions (TCP) | ~28 million |
| New sessions/sec (TCP) | ~720,000 |
| Firewall latency (64-byte UDP) | ~3.78 / 2.5 µs (ULL ports) |
*Fortinet datasheet; lab conditions vary. Re-validate on your FortiOS release notes.
Ports, PSUs & SKU Variants
Quick Answer: The front panel mixes 4x 25GE/10GE SFP28 ultra-low-latency ports, 4x 10GE SFP+, 8x GE SFP, and 16x GE RJ45 with dual hot-swap AC or DC PSUs. The 901G adds dual 480 GB SSDs for local logging. Two SFP SX transceivers ship in the box.
| Attribute | FG-900G / 901G |
|---|---|
| 25GE/10GE SFP28 ULL | 4 |
| 10GE SFP+ | 4 |
| GE SFP | 8 |
| GE RJ45 | 16 (+ GE MGMT) |
| HA | 1x 2.5GE/GE RJ45 |
| Onboard SSD | None (900G) / 2x 480 GB (901G) |
| TPM / BLE | Yes |
| PSU | Dual hot-swap AC or DC SKUs |
| Included optics | 2x SFP SX |
| FortiSwitch (FortiLink) | Up to ~96-196 (FortiOS-dependent) |
- SKUs: FG-900G, FG-900G-DC, FG-901G, FG-901G-DC.
- Typical power ~170-184 W average / ~313-323 W max (model-dependent).
- Budget 25GE/10GE optics beyond the included SX pair as separate BOM lines.
FortiLink, HA & Deployment Patterns
Quick Answer: Deploy the 900G as a campus or HQ edge with 25GE ULL northbound and FortiLink southbound to FortiSwitch and FortiAP, or as a mid-DC segmentation node with HA active-passive or active-active. FortiLink manages up to roughly 96-196 FortiSwitches depending on the FortiOS release — confirm the minimum train.
Deployment patterns
- Campus / HQ NGFW: 25GE ULL northbound to the core; FortiLink southbound to FortiSwitch and FortiAP for secure access convergence
- Mid-size DC / segmentation: threat protection with SSL inspection between zones; HA active-passive or active-active per the FortiOS design guide
- Secure SD-WAN hub: FortiOS SD-WAN with FortiGuard AI/ML services on the same node
RFQ Checklist: Freeze the Aggregation BOM
Quick Answer: Freeze the BOM in order: document the threat-protection target with SSL percentage, choose FG-900G or FG-901G for SSD logging, pick AC or DC PSU SKUs, add 25GE and 10GE optics beyond the included SX pair, then set the FortiGuard bundle term, HA design, FortiLink counts, and management seats.
- Threat protection target with SSL percentage documented
- FG-900G vs FG-901G (SSD logging needs)
- AC vs DC PSU SKUs
- 25GE/10GE optics beyond the included SX pair
- FortiGuard AI-Powered Security Services bundle term
- HA interconnect and failover design
- FortiSwitch / FortiAP counts under FortiLink
- FortiManager / FortiAnalyzer centralization
BENQUAN GLOBAL LIMITED supplies the FortiGate 900G and 901G with FortiGuard services, competitive pricing, and configuration support. Search Fortinet SKUs on SKU Lookup, then submit the BOM on rfq.html.
RFQ checklist before you PO
Quick Answer: Freeze model and option SKUs, support or subscription years, ship-by date, and HA or spare needs on one dated ATP before you compare channel prints. Use the checklist below, validate lines on SKU Lookup when the brand is indexed, then open a BOM risk RFQ — soft channel prices stay industry estimate or pending confirmation.
- Model / MPN lines — chassis and options matching this page (not a vague family name).
- Quantities + HA — single unit vs pair; spare FRUs if required.
- Support / subscription years — tier and term on the same quote as hardware.
- Ship-by / quote validity — lock reprice-until-ship language when memory or list cliffs apply.
- Acceptance — Service Tag / serials vs PO; reject surprise third-party parts without paperwork.
Free Compatibility & Delivery Risk Assessment · Fortinet SKU Lookup
FortiGate 900G Datasheet Summary (FG-900G / FG-901G)
Quick Answer: The Fortinet datasheet lists FortiGate 900G and 901G with 164 Gbps IPv4 firewall throughput, 42 Gbps IPS, 31 Gbps NGFW and 30 Gbps threat protection. The 901G adds two 480 GB SSDs, and every value is up to and configuration dependent.
| Datasheet item | FortiGate 900G (FG-900G) | FortiGate 901G (FG-901G) |
|---|---|---|
| IPv4 firewall throughput (1518 / 512 / 64 byte UDP) | 164 / 163 / 153 Gbps | 164 / 163 / 153 Gbps |
| IPS / NGFW / threat protection | 42 / 31 / 30 Gbps | 42 / 31 / 30 Gbps |
| SSL inspection throughput (IPS, avg. HTTPS) | 16.7 Gbps | 16.7 Gbps |
| IPsec VPN throughput (512 byte) | 55 Gbps | 55 Gbps |
| Concurrent / new sessions per second (TCP) | 28 million / 720,000 | 28 million / 720,000 |
| Firewall policies; virtual domains default / max | 50,000; 10 / 50 | 50,000; 10 / 50 |
| IPsec tunnels gateway-to-gateway / client-to-gateway | 2,000 / 50,000 | 2,000 / 50,000 |
| Ports | 4 x 25GE SFP28 / 10GE SFP+, 4 x 10GE SFP+ / GE SFP, 8 x GE SFP, 16 x GE RJ45 | Same as 900G |
| Onboard storage | None | 2 x 480 GB SSD |
| Form factor and weight | 1 RU; 7.25 kg, dual hot-swappable PSUs | 1 RU; 7.5 kg |
Source: Fortinet FortiGate 900G series data sheet (PDF). Checked 2026-10-15.
How to Read the 900G Datasheet in Five Steps
- Step 1: Download the official data sheet and read the footnotes: values are up to and depend on configuration and enabled features.
- Step 2: Size on threat protection throughput, then check the SSL inspection throughput against your share of encrypted traffic.
- Step 3: Choose FG-901G only if you need the 2 x 480 GB onboard SSDs for local logging.
- Step 4: Map the 4 x 25GE SFP28, 4 x 10GE SFP+, 8 x GE SFP and 16 x GE RJ45 ports to your aggregation design.
- Step 5: Request a quote that states the SKU, transceivers, the FortiGuard bundle and the term.
Which Part Numbers Should You Freeze on the RFQ (1 SKUs)?
Quick Answer: When quoting FG-700G and sibling configurations across these 1 part numbers, lock the exact base MPN, redundant power supplies, optics, and matching 1-year or 3-year support tier on separate lines before comparing vendor discounts. Channel net pricing remains industry estimate / pending confirmation.
| Ordering SKU | Key Configuration & Boundary | Adjacent BOM Lines to Freeze |
|---|---|---|
FG-700G | NP7/CP10, 4x25G, ~26 Gbps threat protection, dual AC. Not FG-701G, FG-600F or FG-900G. No public net price. | FG-701G, SFP28 / SFP+ as drawn, Second FG-700G, FortiCare + UTM years |
Frequently Asked Questions
Quick Answer: Buyers ask whether the 900G is still current in 2026, when the 901G SSDs matter, and where to source it. The series remains on Fortinet's published datasheet cycle; choose the 901G for disk-dependent logging, confirm the FortiOS train and SKUs on the quote, and validate the BOM.
What are the FortiGate 900G datasheet throughput numbers?
The Fortinet datasheet lists 164 Gbps IPv4 firewall throughput at 1518 bytes, 42 Gbps IPS, 31 Gbps NGFW, 30 Gbps threat protection and 55 Gbps IPsec VPN at 512 bytes. All values are up to. Checked 2026-10-15.
Where is the FG-900G / FG-901G FortiGate 900G datasheet?
This page summarizes the FortiGate 900G datasheet for RFQ sizing: key specs, interfaces, performance envelopes, and use cases. Confirm software train and SKUs on the quote. BENQUAN GLOBAL LIMITED supplies FortiGate 900G with competitive pricing and BOM risk review.
Is 900G still current in 2026?
Yes — Fortinet continues to publish FortiGate 900G Series datasheets (including mid-2026 revisions). Always confirm the latest performance table and FortiOS minimum for features such as higher FortiSwitch counts.
Do I need 901G SSDs?
Choose 901G when local disk logging, caching, or disk-dependent features matter. Many estates log to FortiAnalyzer and can use 900G — confirm with your logging architecture.
Where to buy FortiGate 900G?
BENQUAN GLOBAL LIMITED supplies FortiGate 900G/901G and support with competitive pricing. Contact info@benquan.hk or request a quote.
Key Takeaway
Key Takeaway: FortiGate 900G/901G is Fortinet's mid-high 1U NGFW: NP7 plus CP9, about 164 Gbps firewall and 30 Gbps threat protection, 25GE ULL ports, and FortiLink convergence. Size on threat protection plus SSL inspection, prefer the 901G for local logging, and confirm the FortiOS train. BENQUAN GLOBAL LIMITED supplies FG-900G/901G with competitive pricing.