Aggregation NGFW / 25G

FortiGate 600F or PA-3400: is threat protection still near 10 Gbps, or do you step up to 900G?

Peer FortiGate 600F/900G to Palo Alto PA-3410–3440 on threat+SSL, 25G density, HA, and a dual-vendor RFQ checklist — above the 200G/PA-1400 campus-edge band, below 1000F midrange.

Quick Take: Why This Band Exists Now

Quick Take: After the campus-edge band, aggregation CapEx forks: stay on FortiGate 600F/601F (~10.5 Gbps TP, 25G) or 900G/901G (~30 Gbps), or pivot to Palo Alto PA-3400 (PA-3420 ~10 Gbps; PA-3430/3440 for 15–20 Gbps and optional 100G). Peer threat+SSL and uplinks. BENQUAN supplies both with competitive pricing.

Start with the 900G specs sheet and the PA-3400 Series datasheet summary. Fabric-only estates still dual-check optics and bundles before freezing CapEx.

Not this page:

Architecture Fork: NP7 Aggregation vs PA-3400 Internet Gateway

Quick Answer: FortiGate 600F/900G targets 1U aggregation with NP7 acceleration and 25G uplinks. Palo Alto PA-3400 targets high-speed internet gateways with 25G on all models and optional 100G on PA-3430/3440. Fork on ops plane and uplink plan once campus-edge ~6 Gbps is no longer enough.

Both families target 1U aggregation, regional HQ, and high-speed internet-edge roles with heavy TLS inspection. The fork is ops gravity plus 25G (and optional 100G) assumptions — not firewall-only UDP Gbps.

DimensionFortiGate 600F / 900GPalo Alto PA-3400 (3410–3440)
Role bandCampus aggregation / mid DC perimeterHigh-speed internet gateway / regional edge
ASIC / stackNP7 (+ CP9/CP10 class) on FortiOS Security FabricML-Powered NGFW on PAN-OS (App-ID, ATP, WildFire)
Ops planeFortiManager / Fabric + FortiLinkPanorama / Strata Cloud Manager
Published TP class~10.5 Gbps (600F) / ~30 Gbps (900G) enterprise mix~7.5 / 10 / 15 / 20 Gbps (3410→3440 appmix)
Uplink emphasis25G SFP28 ULL + 10GE; FortiLink southbound4× 25G SFP28 on all; PA-3430/3440 add dual 40/100G
Local storage SKU601F / 901G add onboard SSD~480 GB SSD class (confirm quote)
Naming traps: Do not peer 600F to PA-1420 as an equal TP column. Do not quote PA-3400 without naming 3410/3420/3430/3440. “900G vs PA-3400” without stating 3430 vs 3440 leaves a 10 Gbps TP gap unpriced.

Honest Peer Mapping: 600F/900G ↔ PA-3410–3440

Quick Answer: Peer FortiGate 600F (~10.5 Gbps Threat Protection) to PA-3420 (~10 Gbps). Map FortiGate 900G (~30 Gbps TP) toward PA-3430/3440 and state any datasheet headroom gap. Do not treat PA-1400 as an equal Threat Prevention peer for 600F-class aggregation briefs. Quote sustained figures with SSL decryption enabled on both columns.

Map by threat+SSL KPI sheet and uplink plan. Branch 90G/120G and campus-edge 200G stay on other RFQ lines.

Migration intentFortinet pathPalo Alto peerHonesty note
~10 Gbps aggregationFortiGate 600F / 601FPA-3420 (primary) or PA-3410~10.5 vs ~10 Gbps TP; step PA-3420 when SSL headroom matches 600F
Need local logging SSDFG-601F or FG-901GConfirm PA SSD on quoteStorage SKU choice is not TP class
~15–20 Gbps + optional 100GFortiGate 900G / 901GPA-3430 / PA-3440900G datasheet TP (~30 Gbps) can exceed PA-3440 (~20) — state the brief
Lighter campus edgeFortiGate 200GPA-1410 / 1420Use the 200G vs PA-1400 Solutions page
Heavier midrange / denser DCFortiGate 1000F classPA-3400 top end or PA-5400Separate RFQ — see PA-3400 vs 1000F

Threat+SSL Sizing: Equal Assumptions Only

Quick Answer: Force identical Threat Prevention with SSL assumptions on both columns. Reject firewall-only 600F/900G marketing rows against Palo Alto TP. A 900G versus PA-3420 bake-off is not an honest peer — step Palo Alto to 3430/3440 or narrow the Fortinet column to 600F.

Size on Threat Prevention with SSL decryption enabled — not firewall-only Gbps (~139 Gbps class on 600F / ~164 Gbps on 900G marketing rows). Force identical appmix and logging on both quotes.

Figures follow Fortinet FortiGate 900G Series datasheet and Palo Alto Networks PA-3400 Series datasheet (enterprise traffic mix; methodology footnotes apply).

Metric (datasheet class)FG-600F / 601FFG-900G / 901GPA-3420PA-3440
Threat protection~10.5 Gbps~30 Gbps~10 Gbps~20 Gbps
NGFW / IPS classconfirm DS~31 / ~42 Gbpsconfirm DSconfirm DS
SSL inspection emphasis~9 Gbps class + UTP/ATP~16.7 Gbps class + UTP/ATPTP + WildFire + DNSSame CDSS stack
Sessions classconfirm DShigh mid-enterprise~2.2M class~3M class
Stop ranking vendors if one quote uses firewall-only Gbps and the other uses Threat Prevention with SSL. A 900G vs PA-3420 bake-off is not an honest peer — step Palo Alto to 3430/3440 or narrow the Fortinet column to 600F. See the renewal SKU bundle trap.

Ports, HA & Subscription Parity

Quick Answer: Equalize 25G SFP28 counts, optional 100G optics on PA-3430/3440, HA kits and spare chassis, plus FortiGuard UTP/ATP versus Palo Alto CDSS years. Quote FortiGate 601F or 901G only when onboard SSD logging is a hard RFQ requirement. Equalize support term years across both vendor columns.

Port and form-factor reality

  • 600F/601F: 1U; 25G SFP28 ULL + 10GE SFP+; strong FortiLink southbound — confirm exact SKU port map
  • 900G/901G: 1U dual PSU; denser 25G/10G mix; 901G adds dual 480 GB SSD
  • PA-3410/3420: 1U; 12× multigig copper + 10× SFP/SFP+ + 4× 25G SFP28
  • PA-3430/3440: same 25G base plus dual 40/100G QSFP28 — price optics and breakout early
  • HA: Active/passive or active/active on both — include HA cables and spare chassis

Subscription lines to equalize

BOM lineFortinet pathPalo Alto path
Threat stackUTP or ATP FortiGuardTP + WildFire + DNS Security
SupportFortiCare 24x7 — confirm tierPremium / partner — same term length
SD-WANOn-box FortiOS SD-WAN if usedAdvanced SD-WAN license if used
ManagementFortiManager seats if centralizedPanorama / Strata seats if centralized

Lean Fortinet when: Security Fabric, FortiLink, and FortiManager runbooks already define aggregation.

Lean Palo Alto when: Panorama/Strata templates, App-ID libraries, and optional 100G uplinks dominate the brief.

Ops Plane & Adjacent RFQs

Quick Answer: Lock FortiManager versus Panorama before chassis SKUs. Keep FortiGate 200G versus PA-1400 campus-edge and FortiGate 1000F versus PA-3400 midrange peers on other RFQ lines so aggregation density and 25G or 100G assumptions remain a clean band. Name the console owner before agreeing the migration window.

Keep branch (90G/120G), campus-edge (200G/PA-1400), aggregation (this page), and midrange (1000F/PA-3400) as separate BOM lines so peers stay honest.

Scope discipline: Legacy 600F vs PA-1400 is useful history for under-peer mistakes, not the 2026 aggregation dual-RFQ. New CapEx should quote 600F against PA-3420 and 900G against PA-3430/3440 with matched threat+SSL.

RFQ Checklist: Dual-Vendor Aggregation BOM

Quick Answer: Issue one aggregation brief with FortiGate 600F/900G and Palo Alto PA-3410 through PA-3440 columns. Match threat+SSL, 25G or 100G uplinks, HA, subscriptions, and shared ATP. State the exact PA-3400 model suffix on every quote package. Require dated lead times on both vendor quotes.

One aggregation brief → FortiGate 600F/900G line items → Palo Alto PA-3410–3440 line items → equal threat+SSL, 25G/100G, HA, subscriptions, and lead times.

  1. Per-site KPI sheet (TP+SSL, sessions, VPN users, SSL %)
  2. Fortinet model: FG-600F vs FG-601F vs FG-900G vs FG-901G stated explicitly
  3. Palo Alto model: PA-3410 / 3420 / 3430 / 3440 with TP and 100G needs called out
  4. Port mix: 25G SFP28 counts, 10G, optional 40/100G QSFP28
  5. FortiLink / switch adjacency vs Panorama-managed switching path
  6. HA: mode, cables, spare chassis
  7. Fortinet: FortiCare tier + UTP/ATP + term years
  8. Palo Alto: TP/CDSS + optional Advanced SD-WAN + support term
  9. Management seats: FortiManager vs Panorama / Strata
  10. Optics and DAC/AOC spares on both columns (especially 100G)
  11. Lead time: 600F/900G ATP vs PA-3400 channel stock
  12. Exclusions: 200G campus-edge and 1000F midrange on separate lines

BENQUAN GLOBAL LIMITED supplies FortiGate 600F/900G and Palo Alto PA-3400 Series with competitive pricing and configuration support. Use SKU Lookup, then submit the dual-vendor brief on rfq.html.

Frequently Asked Questions

Quick Answer: FortiGate 600F peers PA-3420 near 10 Gbps threat+SSL. This Solutions page corrects under-peer FortiGate 600F versus PA-1400 framing used in older guides. Jump to FortiGate 1000F or PA-5400 when uplink density or TP exceeds aggregation. Confirm sustained figures with SSL decryption enabled.

Does FortiGate 600F peer with PA-3420?

Yes as an aggregation peer on equal threat+SSL assumptions (~10 Gbps band). Use PA-3410 when the KPI sheet is lighter. Dual-RFQ matched 25G, HA, and subscription years.

Is this the same as 600F vs PA-1400?

No. That article compares 600F to an under-peered PA-1400 column. This page is the honest aggregation ladder against PA-3400.

600F or 900G — which to quote?

Quote 600F when TP stays near ~10 Gbps. Quote 900G when you need ~30 Gbps-class TP or denser 25G mid-enterprise edge — then peer Palo Alto at PA-3430/3440 and state any TP headroom gap.

When do I jump to 1000F or PA-5400?

When Threat Prevention or uplink density clearly exceeds the aggregation band on this page. Keep that as a separate RFQ line.

Where to RFQ both platforms?

BENQUAN GLOBAL LIMITED supplies FortiGate 600F/900G and Palo Alto PA-3400 with competitive pricing. Submit one RFQ with the checklist above.

Key Takeaway

Key Takeaway: Aggregation CapEx peers FortiGate 600F to PA-3420 and FortiGate 900G to PA-3430/3440 on threat+SSL and 25G/100G — not PA-1400 under-peers. BENQUAN GLOBAL LIMITED supplies FortiGate 600F/900G and PA-3400 Series with competitive pricing.

Not sure your aggregation NGFW BOM is optimal?

If FortiGate 600F/900G vs PA-3410–3440 peer tiers, threat+SSL assumptions, or 25G/100G optics parity are unclear, click below for a free compatibility and delivery risk assessment. Fast BOM validation from a global free-port logistics hub.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk

Contents