Hyperscale NGFW / Specs

FG-4400F: 6×NP7 = 1,200 Gbps Aggregate?

Hyperscale 6x NP7 fixed NGFW — threat+SSL sizing, 12x 100GE and 18x 25GE interface maps, hyperscale CGNAT licensing, HA design, and an RFQ checklist for large data-center and carrier edges.

Quick Take: Fortinet's Top Fixed NGFW

Quick Take: The FortiGate 4400F and 4401F are Fortinet's hyperscale fixed NGFWs with six NP7 processors plus CP9, delivering 94 Gbps IPS, 75 Gbps threat protection, and 1.15 Tbps firewall across 12x 100GE and 18x 25GE ports. The hyperscale license lifts sessions to 700 million. BENQUAN supplies FG-4400F/4401F with competitive pricing.

Figures follow the official Fortinet FortiGate 4400F Series datasheet (enterprise traffic mix; methodology footnotes apply). Confirm FortiOS train, FortiGuard bundle, hyperscale licensing, and HA design on the quote.

Adjacent guides:

6x NP7 Architecture: A 1,200 Gbps Offload Fabric

Quick Answer: The 4400F carries six NP7 network processors — a 1,200 Gbps aggregate offload fabric — plus CP9 content processors for IPS and SSL inspection. It tops Fortinet's fixed 2U NGFW range, above the 3000F/3500F/3700F tier and beside the 6000F chassis class, with 400,000 firewall policies for complex segmentation.

The 4400F and 4401F are 2U hyperscale-class fixed appliances. Each NP7 connects to the integrated switch fabric via a 2x 100G LAG, so firewall, IPsec, and VXLAN offload scale with balanced NPU port mapping while CP9 handles IPS pattern matching and SSL.

DimensionFG-4400F / 4401F
RoleLarge DC core and perimeter, carrier edge, high-scale segmentation
SPU complement6x NP7 (1,200 Gbps aggregate) + CP9
Form factor2U fixed
Firewall policies400,000
Hyperscale licenseYes — 700M sessions, NP7 CGNAT
Sizing rule: Buy against threat protection (75 Gbps) with your SSL percentage and packet mix — not the 1.15 Tbps firewall-only number — and add the hyperscale license only when CGNAT or extreme session scale is required.

Model Ladder: When the 4400F Is the Right Step

Quick Answer: Step up to the 4400F when the 3500F or 3700F runs out of inspected throughput or session scale. Stay fixed 2U instead of the 6000F chassis when slot-based scaling is unnecessary, and peer multi-vendor RFQs against the Palo Alto PA-7500 or PA-5450 on equal threat+SSL assumptions.

Map by inspected throughput, session scale, and interface density — not by list-price bands or firewall-only stickers.

Site roleModelWhy it fitsEscalate / peer
DC tier belowFG-3500F / 3700F~63-75 Gbps TP, 25GE/400GE options3000F/3500F/3700F specs
Hyperscale fixed 2UFG-4400F / 4401F~75 Gbps TP, 1.15 Tbps firewall, 700M sessions licensedThis page
FPC chassis scalingFG-6300F / 6500FSession capacity scales with processor cards6000F specs
Multi-vendor bake-offPA-7500 / PA-5450Same hyperscale role on PAN-OSPA-7500 / PA-5450
Naming traps: FG-4401F is the SSD logging variant, not a faster tier — performance is identical. Do not shortlist the 4400F for campus aggregation; that role belongs to the 600F/900G tier. Confirm exact SKUs on every quote.

Threat+SSL Sizing: The Numbers That Matter

Quick Answer: On the enterprise traffic mix, the 4400F delivers 94 Gbps IPS, 82 Gbps NGFW, 75 Gbps threat protection, and 86 Gbps SSL inspection; IPv4 firewall peaks at 1.15 Tbps. Sessions reach 210 million, or 700 million licensed. Size on threat protection with your documented SSL percentage.
Metric (published*)FG-4400F / 4401F
IPS throughput94 Gbps
NGFW throughput82 Gbps
Threat protection75 Gbps
IPv4 firewall (1518/512/64 UDP)1.15 / 1.14 / 0.50 Tbps
SSL inspection (IPS, avg HTTPS)86 Gbps
Application control (HTTP 64K)140 Gbps
IPsec VPN (512-byte)310 Gbps
Concurrent sessions (TCP)210M / 700M†
New sessions/sec (TCP)1M / 10M†
Firewall throughput (PPS)750 Mpps
Firewall latency (64-byte UDP)2.98 µs

*Fortinet datasheet, enterprise traffic mix; lab conditions vary. † With the Hyperscale Firewall License. Re-validate on your FortiOS release notes.

Stop ranking models on the 1.15 Tbps firewall-only row. Production NGFW traffic with IPS and TLS inspection lands far lower — document your SSL-inspection percentage first, then read the threat-protection row.

Ports, PSUs & SKU Variants

Quick Answer: The 4400F provides 12x 100GE/40GE QSFP28 and 18x 25GE/10GE SFP28 ports driven by six NP7 processors, each joining the switch fabric over a 2x 100G LAG. The 4401F adds two 1.92 TB SSDs for local logging. Both include TPM, dual management ports, and AC or DC power variants.
AttributeFG-4400F / 4401F
100GE/40GE QSFP28 slots12
25GE/10GE SFP28 slots18 (16 + 2 HA)
Processors6x NP7 + CP9
NP7 aggregate fabric1,200 Gbps
Management ports2x GE RJ45
Onboard SSD4401F: 2x 1.92 TB (4400F: none)
Firewall policies400,000
Hyperscale licenseYes
TPMYes
PowerAC or DC variants
  • SKUs: FG-4400F, FG-4400F-DC, FG-4401F (adds SSDs).
  • Included transceivers: 2x SFP+ (SR 10GE) — budget 100GE QSFP28 and 25GE SFP28 optics separately.
  • Each NP7 connects to the integrated switch fabric via a 2x 100G LAG; use NPU port mapping for balanced offload.

Licensing, HA & Deployment Patterns

Quick Answer: The Hyperscale Firewall License scales the 4400F from 210 million to 700 million sessions and from 1 million to 10 million new sessions per second, unlocking NP7-accelerated CGNAT for carrier and 5G edges. Plan HA active-passive or active-active, NPU port mapping, and FortiManager or FortiAnalyzer centralization.

Deployment patterns

  • Data-center core & perimeter: terabit-class firewall with 100GE density inspects north-south and east-west traffic at scale
  • Hyperscale CGNAT / carrier edge: the license unlocks NP7 CGNAT and 700M sessions for carrier and 5G deployments
  • High-scale VPN aggregation: 310 Gbps IPsec and 40,000 gateway tunnels concentrate site-to-site VPN for large distributed estates
  • Complex segmentation: 400,000 firewall policies support zone-rich DC segmentation designs
Scope discipline: Slot-based scaling belongs on the 6000F chassis and the tier below on 3000F/3500F/3700F — shortlist the 4400F only when fixed 2U hyperscale is the actual requirement.

RFQ Checklist: Freeze the Hyperscale BOM

Quick Answer: Freeze the BOM in order: document the threat-protection target with SSL percentage, choose FG-4400F or FG-4401F for SSD logging, decide the hyperscale license, pick AC or DC power, add 100GE and 25GE optics beyond the included pair, then set the FortiGuard bundle term, HA design, and management seats.
  1. Threat protection target with SSL inspection percentage documented
  2. FG-4400F vs FG-4401F (onboard SSD logging)
  3. Hyperscale Firewall License for CGNAT / session scale
  4. AC vs DC power variants
  5. 100GE QSFP28 / 25GE SFP28 optics beyond the included SR pair
  6. FortiGuard AI-Powered Security Services bundle term
  7. HA interconnect and failover design
  8. FortiManager / FortiAnalyzer centralization

BENQUAN GLOBAL LIMITED supplies the FortiGate 4400F and 4401F with FortiGuard services, competitive pricing, and configuration support. Search Fortinet SKUs on SKU Lookup, then submit the BOM on rfq.html.

Which Part Numbers Should You Freeze on the RFQ (1 SKUs)?

Quick Answer: When quoting FG-4401F and sibling configurations across these 1 part numbers, lock the exact base MPN, redundant power supplies, optics, and matching 1-year or 3-year support tier on separate lines before comparing vendor discounts. Channel net pricing remains industry estimate / pending confirmation.

Ordering SKUKey Configuration & BoundaryAdjacent BOM Lines to Freeze
FG-4401F4RU AC, 2x 1.92TB SSD, 12x 100GE QSFP28, 18x 25GE SFP28, ~75 Gbps Threat Protection. Not FG-4400F (no SSD).FG-4401F-DC, FG-4400F, Hyperscale license as a separate line, QSFP28 / SFP28 per drawing

Frequently Asked Questions

Quick Answer: Buyers ask about 4400F throughput, the difference between FG-4400F and FG-4401F, hyperscale licensing, and sourcing. Size on 75 Gbps threat protection with SSL inspection rather than the 1.15 Tbps firewall-only figure, confirm FortiOS train and SKUs on the quote, and validate the BOM before ordering.

What is the FortiGate 4400F throughput?

On the enterprise traffic mix, the FortiGate 4400F delivers 94 Gbps IPS, 82 Gbps NGFW, and 75 Gbps threat protection, with IPv4 firewall throughput of 1.15 Tbps at 1518-byte. Six NP7 processors and CP9 content processors provide the hardware acceleration.

What is the difference between FG-4400F and FG-4401F?

The FG-4400F and FG-4401F share the same performance, 12x 100GE and 18x 25GE interfaces, and six NP7 processors. The 4401F adds two 1.92 TB onboard SSDs for local logging and caching; the 4400F has no onboard storage and logs to FortiAnalyzer. Both offer AC and DC power variants.

Does the FortiGate 4400F support the hyperscale firewall license?

Yes. With the Hyperscale Firewall License, the 4400F scales concurrent sessions from 210 million to 700 million and new sessions per second from 1 million to 10 million, enabling NP7-accelerated CGNAT for carrier and large data-center workloads.

Where can I buy the FortiGate 4400F?

BENQUAN GLOBAL LIMITED supplies the FortiGate 4400F and 4401F with FortiGuard services and competitive pricing. Contact info@benquan.hk or request a quote for a free BOM compatibility and delivery-risk review.

Key Takeaway

Key Takeaway: The FortiGate 4400F/4401F is Fortinet's hyperscale fixed NGFW: 94 Gbps IPS, 75 Gbps threat protection, 1.15 Tbps firewall, and up to 700 million sessions across six NP7 processors. Size on threat protection, add hyperscale only for CGNAT, and confirm the FortiOS train. BENQUAN GLOBAL LIMITED supplies FG-4400F/4401F with competitive pricing.

Not sure your FortiGate 4400F BOM is optimal?

If 4400F vs 4401F selection, hyperscale licensing, optics, or HA design is unclear, click below for a free compatibility and delivery risk assessment. Fast global BOM validation from a free-port logistics hub.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk

Contents