Mid-Campus NGFW / 10GE

Is the 400F about 9 Gbps of threat protection, peered to a PA-3410?

Peer FortiGate 400F/401F (~9 Gbps TP) to Palo Alto PA-3410/3420 on threat+SSL, 10GE, HA, and dual-vendor RFQ — between 200G/PA-1400 campus edge and 600F/900G aggregation.

Quick Take: Why This Mid-Campus Band Exists

Quick Take: Mid-enterprise RFQs often skip a band — jumping from 200G to 600F. FortiGate 400F/401F fills ~9 Gbps threat protection with 10GE ULL ports. Peer Palo Alto at PA-3410/3420 (~7.5–10 Gbps TP), not PA-1420 as an equal column. BENQUAN GLOBAL LIMITED supplies both platforms with competitive pricing for dual-vendor RFQs.

Start with the 400F/401F specs sheet and the PA-3400 Series ladder.

Not this page:

Architecture Fork: NP7 Mid-Campus vs PA-3400 Entry

Quick Answer: FortiGate 400F/401F is a 1U NP7/CP9 mid-campus NGFW with ~9 Gbps threat protection and 10GE ULL ports. Palo Alto PA-3410/3420 open the PA-3400 gateway ladder at ~7.5–10 Gbps Threat Prevention with 25G SFP28. Fork on ops gravity and uplink plan — not firewall-only marketing rows.

Both land above the 200G/PA-1400 campus-edge band and below denser 600F/900G aggregation.

DimensionFortiGate 400F / 401FPalo Alto PA-3410 / 3420
Role bandMid-campus / mid-enterprise edgePA-3400 entry internet / campus gateway
ASIC / stackNP7 + CP9 on FortiOS FabricML-Powered NGFW on PAN-OS
Ops planeFortiManager / FortiLinkPanorama / Strata
Published TP class~9 Gbps threat protection~7.5 Gbps (3410) / ~10 Gbps (3420)
Uplink emphasis8× 10GE SFP+ (four ULL)4× 25G SFP28 + multigig / SFP+
Local storage SKU401F dual 480 GB SSD~480 GB SSD class (confirm)
Naming traps: PA-1420 is not an equal TP peer for 400F. “PA-3400” without 3410/3420 is incomplete. Session counts differ (400F ~7.8M vs 200G ~11M) — high-connection fabrics without the TP need may still fit 200G better.

Honest Peer Mapping: 200G → 400F or PA-3410/3420

Quick Answer: Map sites outgrowing 200G/PA-1420 to FortiGate 400F/401F or PA-3410/3420 on equal threat+SSL assumptions. Prefer PA-3420 when decryption headroom must track ~9–10 Gbps TP. Keep 600F/900G versus PA-3400 aggregation and 1000F step-up forks on separate Solutions lines so peer tiers stay honest.
Migration intentFortinet pathPalo Alto peerHonesty note
~6 Gbps campus edgeFortiGate 200G / 201GPA-1410 / 1420200G Solutions
~9 Gbps mid-campusFortiGate 400F / 401FPA-3410 / 3420This page — not PA-1420 as equal TP
Need local SSD loggingFG-401FConfirm PA SSDStorage SKU ≠ TP class
25G aggregation600F / 900GPA-3420–3440Aggregation Solutions
SSL-VPN scale ~5K usersFG-400F classConfirm PA VPN sizingState tunnel/user counts on the RFQ

Threat+SSL Sizing: Equal Assumptions Only

Quick Answer: Size on Threat Prevention with SSL decryption enabled. FG-400F (~9 Gbps TP) peers PA-3410 (~7.5 Gbps) to PA-3420 (~10 Gbps). Reject firewall-only 400F rows (~79.5 Gbps class) against Palo Alto TP — and reject PA-1420 as an equal mid-campus TP column on this RFQ.

Figures follow Fortinet FortiGate 400F Series datasheet and Palo Alto Networks PA-3400 Series datasheet (enterprise traffic mix; methodology footnotes apply).

Metric (datasheet class)FG-400F / 401FPA-3410PA-3420PA-1420 (ref)
Threat protection~9 Gbps~7.5 Gbps~10 Gbps~6.2 Gbps
NGFW / IPS class~10 / ~12 Gbpsconfirm DSconfirm DSconfirm DS
Sessions class~7.8M~1.4M class~2.2M class~1.4M class
SSL stackUTP / ATPTP + WildFire + DNSSame CDSSSame CDSS
Stop ranking vendors if one quote uses 400F firewall-only Gbps and the other uses PA Threat Prevention. Re-issue with identical decrypt assumptions. See the renewal SKU bundle trap.

Ports, HA & Subscription Parity

Quick Answer: Equalize 10GE SFP+/ULL counts on Fortinet against PA-3400 25G and multigig maps, plus HA kits and UTP/ATP versus CDSS years. Quote 401F when dual 480 GB SSDs are required; confirm PA optics early when 25G is on the Palo Alto column.

Port and form-factor reality

  • 400F/401F: 1U dual PSU; 16× GE RJ45 + 8× GE SFP + 8× 10GE SFP+ (four ULL) — confirm exact SKU map
  • PA-3410/3420: 1U; multigig copper + SFP/SFP+ + 4× 25G SFP28
  • HA: Active/passive or active/active — include cables and spare chassis
  • Fabric scale: 400F-class FortiLink can manage dozens of FortiSwitches / hundreds of FortiAPs — confirm FortiOS limits

Subscription lines to equalize

BOM lineFortinet pathPalo Alto path
Threat stackUTP or ATP FortiGuardTP + WildFire + DNS Security
SupportFortiCare 24x7 — confirm tierPremium / partner — same term
SD-WANOn-box FortiOS SD-WAN if usedAdvanced SD-WAN if used
ManagementFortiManager seats if centralizedPanorama / Strata seats if centralized

Lean Fortinet when: Security Fabric, FortiLink, and 10GE ULL adjacency already define mid-campus edge.

Lean Palo Alto when: Panorama/Strata templates and 25G PA-3400 gateway standards dominate the brief.

Ops Plane & Adjacent RFQs

Quick Answer: Lock FortiManager versus Panorama before chassis debates decide the vendor path. Keep campus-edge (200G/PA-1400), mid-campus (this page), aggregation (600F/PA-3400), and Fabric stack BOMs as separate RFQ lines so peer tiers, optics maps, and subscription years stay honest across both columns.
Scope discipline: Legacy guides that peer 600F to PA-1400 already warn PA-1420 may align closer to 400F-class — use this page for that honest mid-campus dual-RFQ instead of stretching PA-1400 upward.

RFQ Checklist: Dual-Vendor Mid-Campus BOM

Quick Answer: One mid-campus brief → FortiGate 400F/401F column → Palo Alto PA-3410/3420 column with equal threat+SSL, 10GE versus 25G port maps, HA kits, subscription years, and shared ATP dates. Exclude 200G campus-edge and 600F aggregation SKUs from this BOM line entirely.
  1. Per-site KPI sheet (TP+SSL, sessions, SSL-VPN users)
  2. Confirm band: not 200G/PA-1400 and not 600F/25G aggregation
  3. Fortinet model: FG-400F vs FG-401F (SSD) stated explicitly
  4. Palo Alto model: PA-3410 vs PA-3420 with TP called out
  5. Port mix: 10GE ULL/SFP+ vs 25G SFP28 / multigig
  6. FortiLink / AP scale vs Panorama switching path
  7. HA: mode, cables, spare chassis
  8. Fortinet: FortiCare + UTP/ATP + term years
  9. Palo Alto: TP/CDSS + support term
  10. Management seats: FortiManager vs Panorama / Strata
  11. Optics and DAC/AOC spares on both columns
  12. Shared ATP vs one go-live for chassis + optics + subscriptions

BENQUAN GLOBAL LIMITED supplies FortiGate 400F/401F and Palo Alto PA-3400 Series with competitive pricing and configuration support. Use SKU Lookup, then submit the dual-vendor brief on rfq.html.

Frequently Asked Questions

Quick Answer: FortiGate 400F peers PA-3410/3420 on ~9–10 Gbps threat+SSL. This is not the 200G vs PA-1400 page and not the 600F aggregation page. Quote 401F when onboard SSD logging is required; dual-RFQ with matched ports, HA kits, and equal subscription years.

Does FortiGate 400F peer with PA-3410?

Yes as the primary mid-campus peer. Use PA-3420 when TP headroom must match ~9–10 Gbps. Do not treat PA-1420 as an equal TP column for 400F.

Is this the same as 200G vs PA-1400?

No. That Solutions page is the ~6 Gbps campus-edge band. This page is the mid-campus band above it.

400F or 600F?

Stay on 400F when TP and 10GE fit. Step to 600F/900G versus PA-3400 when 25G aggregation density or higher TP is required.

400F or 401F?

Same networking and performance. Quote 401F for dual 480 GB SSDs; otherwise 400F is fine. State the choice on the RFQ.

Where to RFQ both platforms?

BENQUAN GLOBAL LIMITED supplies FortiGate 400F/401F and Palo Alto PA-3400 with competitive pricing. Submit one RFQ with the checklist above.

Key Takeaway

Key Takeaway: Do not skip the mid-campus band. Peer FortiGate 400F/401F (~9 Gbps TP) to PA-3410/3420 — not PA-1420 — between 200G campus edge and 600F aggregation. BENQUAN GLOBAL LIMITED supplies FortiGate 400F/401F and PA-3400 Series with competitive pricing for dual-vendor RFQs.

Not sure your mid-campus NGFW BOM is optimal?

If FortiGate 400F versus PA-3410/3420 peer tiers, threat+SSL assumptions, or 10GE versus 25G parity are unclear, click below for a free compatibility and delivery risk assessment. Fast BOM validation from a global free-port logistics hub.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk

Contents