Data-Center NGFW / Specs

Is the 3700F 75 Gbps of threat protection, and the 3000F 33?

NP7/CP9 hyperscale-class tier — threat+SSL sizing, 100GE and 400GE interface maps, hyperscale CGNAT licensing, HA design, and an RFQ checklist for data-center core and segmentation refreshes.

Quick Take: Where This Tier Fits

Quick Take: FortiGate 3000F, 3500F, and 3700F are Fortinet's NP7 plus CP9 data-center NGFWs delivering roughly 33, 63, and 75 Gbps threat protection. The 3700F adds 400GE QSFP-DD and ultra-low-latency ports; the 3000F and 3500F take the hyperscale CGNAT license. Size on threat protection with SSL inspection. BENQUAN supplies all three with competitive pricing.

Figures follow the official Fortinet FortiGate 3000F, 3500F, and 3700F Series datasheets (enterprise traffic mix; methodology footnotes apply). Confirm FortiOS train, FortiGuard bundle, hyperscale licensing, and HA design on the quote.

Adjacent guides:

NP7/CP9 Architecture: One Platform, Three Densities

Quick Answer: All three models run FortiOS with three-tier SPU acceleration: NP7 network processors offload firewalling, VXLAN, and IPsec, while CP9 content processors accelerate IPS and SSL inspection. The tier sits above the 1U FortiGate 900G and below chassis-class 6000F/7000F, covering data-center core and internal segmentation roles.

This is Fortinet's 2U hyperscale-class NGFW family. It targets the data-center core, internal segmentation between security zones, secure web gateway inspection, and high-scale VPN aggregation. Hardware acceleration keeps SSL inspection, IPS, and VXLAN termination practical at hundreds of gigabits.

DimensionFG-3000FFG-3500FFG-3700F
Role100GE DC edge / coreDense 25/100GE DC core400GE spine-adjacent inspection
SPU complementNP7 + CP93x NP7 / 8x CP93x NP7 / CP9
Form factor2U2U2U
Hyperscale licenseYesYesNo
Ultra-low-latency ports——4x ULL SFP28
Sizing rule: Buy against threat protection (33 / 63 / 75 Gbps for 3000F / 3500F / 3700F) with your SSL percentage and packet mix — not the 397–595 Gbps firewall-only numbers.

Model Ladder: 3000F vs 3500F vs 3700F and Neighbors

Quick Answer: Pick the 3000F for 100GE data-center edge, the 3500F for dense 25GE/100GE cores, and the 3700F when 400GE uplinks or ultra-low-latency ports are mandatory. Step down to the 900G for 1U aggregation, step up to 4400F or 6000F chassis scale, and peer multi-vendor RFQs against PA-5400.

Map by inspected throughput and interface speed — not by list-price bands or firewall-only stickers.

Site roleModelWhy it fitsEscalate / peer
100GE DC edgeFG-3000F6x 100GE, ~33 Gbps TP, hyperscale-capable900G below
Dense 25/100GE coreFG-3500F32x 25GE + 6x 100GE, ~63 Gbps TP, ~348M sessions with hyperscale6000F chassis
400GE spine-adjacentFG-3700F4x 400GE QSFP-DD + ULL ports, ~75 Gbps TP4400F hyperscale
Multi-vendor bake-offPA-5400 classSame DC core / segmentation role on PAN-OSPA-5400 specs
Naming traps: FG-3501F and FG-3701F are SSD logging variants, not faster tiers. The 3700F cannot take the hyperscale CGNAT license — carrier CGNAT belongs on 3000F/3500F. Confirm exact SKUs on every quote.

Threat+SSL Sizing: The Numbers That Matter

Quick Answer: On Fortinet's enterprise traffic mix, threat protection lands at 33 Gbps (3000F), 63 Gbps (3500F), and 75 Gbps (3700F); IPS reaches 36, 72, and 86 Gbps. IPv4 firewall-only peaks of 397 to 595 Gbps reflect large-packet UDP — size on threat protection with your documented SSL percentage.
Metric (published*)3000F3500F3700F
IPS throughput36 Gbps72 Gbps86 Gbps
NGFW throughput34 Gbps65 Gbps80 Gbps
Threat protection33 Gbps63 Gbps75 Gbps
IPv4 firewall (1518/512/64 UDP)397/389/221 Gbps595/590/420 Gbps589/589/420 Gbps
IPsec VPN (512-byte)105 Gbps165 Gbps160 Gbps
SSL inspection (IPS, avg HTTPS)—63 Gbps55 Gbps
Concurrent sessions (TCP)70M / 230M†140M / 348M†140M
New sessions/sec (TCP)870K / 3M†1M / 5M†930K
Firewall latency (64-byte UDP)3.92 µs2.98 µs3.56 / 1.45 µs (ULL)
Firewall throughput (PPS)331.5 Mpps630 Mpps630 Mpps

*Fortinet datasheet, enterprise traffic mix; lab conditions vary. † With the Hyperscale Firewall License. Re-validate on your FortiOS release notes.

Stop ranking models on the 397–595 Gbps firewall-only rows. Production NGFW traffic with IPS and TLS inspection lands far lower — document your SSL-inspection percentage first, then read the threat-protection row.

Ports, PSUs & SKU Variants

Quick Answer: The 3000F pairs 6x 100GE QSFP28 with 16x 25GE and 16x 10G RJ45; the 3500F swaps in 32x 25GE SFP28; the 3700F brings 4x 400GE QSFP-DD, 20x 50GE, and four ultra-low-latency SFP28 ports. All ship dual hot-swap PSUs, TPM, and two SFP+ SR transceivers.
AttributeFG-3000FFG-3500FFG-3700F
400GE QSFP-DD——4
100GE QSFP28 / 40GE66—
50GE SFP56——20 (18 + 2 HA)
25GE SFP28 / 10GE16 (14 + 2 HA)32—
ULL SFP28——4
10G Base-T RJ4516——
MGMT (10GE RJ45)222
Onboard SSD2x 960 GB3501F: 2x 2 TB2x 1.92 TB
ProcessorsNP7 + CP93x NP7 / 8x CP93x NP7 / CP9
Hyperscale licenseYesYesNo
PSUDual AC or DCDual AC or DCDual AC
TPMYesYesYes
  • SKUs: FG-3000F, FG-3000F-DC; FG-3500F, FG-3501F (SSD), FG-3500F-DC; FG-3700F, FG-3701F.
  • Included transceivers: 2x SFP+ (SR 10GE) per model — budget 100GE QSFP28, 400GE QSFP-DD, and 25GE SFP28 optics separately.
  • The 3700F and 3701F each carry three NP7s (600 Gbps aggregate) and cannot be licensed for hyperscale.

Licensing, HA & Deployment Patterns

Quick Answer: Only the 3000F and 3500F accept the Hyperscale Firewall License, which unlocks NP7-accelerated CGNAT and lifts the 3500F to roughly 348 million sessions for carrier and 5G edge. Plan HA active-passive or active-active per the FortiOS design guide, and centralize logging on FortiAnalyzer before freezing SSD variants.

Deployment patterns

  • Data-center core & segmentation: inspect east-west traffic between zones with IPS and SSL inspection; the 3500F carries dense 25/100GE cores
  • Hyperscale CGNAT (3000F/3500F): the license unlocks NP7-accelerated CGNAT for carrier and 5G edge — the 3700F does not support it
  • 400GE spine-adjacent inspection (3700F): 4x 400GE QSFP-DD plus ULL SFP28 suit leaf-spine fabrics with elephant flows and VXLAN termination
  • HA and management: dedicated HA ports on every model; centralize with FortiManager and FortiAnalyzer, or keep local logging on 3501F/3701F SSDs
Scope discipline: Campus aggregation belongs on 600F/900G vs PA-3400 and chassis-scale on 6000F — do not force this 2U tier into either role before checking the ladder.

RFQ Checklist: Freeze the DC NGFW BOM

Quick Answer: Freeze the BOM in order: document the threat-protection target with SSL percentage, select the model, choose AC or DC PSU SKUs, add optics beyond the included SFP+ pair, decide the hyperscale license and SSD variant, then set the FortiGuard bundle term, HA interconnect, and FortiManager or FortiAnalyzer seats.
  1. Threat protection target with SSL inspection percentage documented
  2. Model selection: 3000F (100GE edge) vs 3500F (dense core) vs 3700F (400GE)
  3. Hyperscale Firewall License needed for CGNAT? (3000F/3500F only)
  4. AC vs DC PSU SKUs
  5. Optics: 100GE QSFP28 / 400GE QSFP-DD / 25GE SFP28 beyond the included SR pair
  6. SSD variant (3501F / 3701F) for local logging vs FortiAnalyzer
  7. FortiGuard AI-Powered Security Services bundle term
  8. HA interconnect and FortiManager / FortiAnalyzer centralization

BENQUAN GLOBAL LIMITED supplies the FortiGate 3000F, 3500F, and 3700F with FortiGuard services, competitive pricing, and configuration support. Search Fortinet SKUs on SKU Lookup, then submit the BOM on rfq.html.

Which Part Numbers Should You Freeze on the RFQ (1 SKUs)?

Quick Answer: When quoting FG-2601F and sibling configurations across these 1 part numbers, lock the exact base MPN, redundant power supplies, optics, and matching 1-year or 3-year support tier on separate lines before comparing vendor discounts. Channel net pricing remains industry estimate / pending confirmation.

Ordering SKUKey Configuration & BoundaryAdjacent BOM Lines to Freeze
FG-2601F2RU AC, 2x 960GB NVMe, 4x 100GE, 16x 25GE, 16x 10GE RJ45, ~25 Gbps Threat Protection. Not FG-2600F (no SSD).FG-2601F-DC, FG-2600F, LIC-FGT-HYPSC-1K2K class, QSFP28 / SFP28 per drawing

Frequently Asked Questions

Quick Answer: Buyers ask how the 3500F differs from the 3700F, which models take the hyperscale firewall license, and which throughput number to size on. Match the model to inspected throughput and interface speed, confirm FortiOS train and SKUs on the quote, and validate the BOM before ordering.

What is the difference between the FortiGate 3500F and 3700F?

Both use three NP7 processors with CP9 content processors. The 3500F provides 6x 100GE and 32x 25GE ports with about 63 Gbps threat protection; the 3700F adds 4x 400GE QSFP-DD and ultra-low-latency ports with about 75 Gbps threat protection. Choose the 3700F when you need 400GE uplinks or the highest inspected throughput.

Does the FortiGate 3000F or 3500F support the hyperscale firewall license?

Yes. The 3000F and 3500F accept Fortinet's Hyperscale Firewall License, which unlocks NP7-accelerated CGNAT and lifts concurrent sessions — the 3500F rises to about 348 million sessions. The 3700F cannot be licensed for hyperscale, so plan CGNAT-heavy carrier workloads on the 3000F or 3500F.

Which FortiGate 3500F throughput number should I size on?

Size on threat protection throughput with your real SSL-inspection percentage and packet mix, not the firewall-only figure. Firewall throughput (397 to 595 Gbps across the series) reflects large-packet UDP; production NGFW traffic with IPS and TLS inspection lands far lower. Document your SSL percentage before selecting a model.

Where can I buy the FortiGate 3500F or 3700F?

BENQUAN GLOBAL LIMITED supplies the FortiGate 3000F, 3500F, and 3700F with FortiGuard services and competitive pricing. Contact info@benquan.hk or request a quote for a free BOM compatibility and delivery-risk review.

Key Takeaway

Key Takeaway: The FortiGate 3000F/3500F/3700F tier covers data-center NGFW from 33 to 75 Gbps threat protection with 100GE, 25GE, and 400GE options and NP7/CP9 acceleration. Size on threat protection plus SSL inspection, add the hyperscale license only for CGNAT workloads, and confirm the FortiOS train. BENQUAN GLOBAL LIMITED supplies FG-3000F/3500F/3700F with competitive pricing.

Not sure your FortiGate DC BOM is optimal?

If 3000F vs 3500F vs 3700F sizing, hyperscale licensing, optics, or HA design is unclear, click below for a free compatibility and delivery risk assessment. Fast global BOM validation from a free-port logistics hub.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk

Contents