Quick Take: Why This Campus Fork Matters
Use this bake-off for wired closet refreshes with APs, phones, and IoT. Keep DC leaf on separate lines: 7050X3 vs QFX5120 · 7050X4 vs QFX5130.
Not this page:
- Arista vs Juniper campus — non-Cisco campus peer
- 720XP vs Aruba CX 6300 — HPE campus PoE peer (Gold B)
- 7050SX3 / 720XP EOS 2026 — last-order calendars (read before mass-replacing 720XP)
- Catalyst 9300 specs — Cisco-only ladder
Architecture Fork: EOS Campus vs IOS XE / StackWise
Both cover enterprise PoE access. The decision is operational gravity — unified EOS campus+DC vs Cisco campus ecosystem depth — plus how you build closet HA.
| Dimension | Arista 720XP | Cisco Catalyst 9300 |
|---|---|---|
| OS | EOS (single-image campus/DC adjacency) | IOS XE |
| Ops plane | CloudVision (on-prem / cloud) | Catalyst Center / DNA tooling; ISE adjacency |
| Closet HA | MLAG / EVPN leaf pairs — no classic StackWise stack | StackWise-480 / StackWise-1T (up to 8 members typical) |
| Campus fabric | EVPN-VXLAN edge designs common | SD-Access (VXLAN + LISP + CTS) when licensed |
| Uplink pattern | Often fixed 25G SFP28 + 100G QSFP28 class | Modular or fixed uplinks (1/10/25G class by SKU) |
| Licensing gravity | EOS perpetual + CloudVision subscription | DNA / Advantage tiers + stacking features by license |
Honest Peer Mapping: Closet Intent First
| Closet intent | Arista 720XP path | Catalyst 9300 path | Honesty note |
|---|---|---|---|
| 1G PoE access | 720XP-48Y6 / 24Y6 class | C9300-48P / 24P class | Audit 4GB DRAM on select 720XP lines before Dec 31, 2026 |
| mGig Wi-Fi 6/7 AP | 720XP-48ZC2 class (mixed 2.5G/5G) | C9300 mGig / UXM class | Equalize mGig port count — not total RJ45 count |
| High-watt AP / camera | Confirm which ports are 60W vs 30W | UPOE / UPOE+ SKUs (up to 90W class) | 720XP often splits PoE classes — Catalyst may be uniform |
| Multi-switch closet | Paired leaves (MLAG/EVPN) | StackWise stack | Different failure and upgrade models |
| DC-consistent ops | Prefer 720XP + CloudVision | Third column only if NX-OS/ACI is separate | Campus vs DC remain separate BOM lines |
PoE & mGig Sizing: Equal Assumptions Only
Campus RFQs fail when one quote assumes continuous PoE through upgrades and the other assumes stack reload with PoE drop — state the maintenance model explicitly.
| Sizing factor | What to freeze | Common failure |
|---|---|---|
| PoE budget | Watts with one vs dual PSU | Comparing max sticker watts without PSU count |
| Per-port class | 30W / 60W / 90W map | Assuming every 720XP port is 90W UPOE+ |
| mGig mix | 2.5G / 5G / 10G port counts | Peering mixed mGig to uniform 1G PoE |
| Upgrade behavior | SSU / continuous PoE vs stack reload | Ignoring AP/phone reboot risk on cutover night |
| Uplink optics | 25G/100G DAC/AOC/optics + spares | Switch-only dual quote |
Uplinks, HA & License Parity
Hardware reality checks
- 720XP uplinks: often fixed 25G + 100G class — confirm SKU drawing
- Catalyst 9300 uplinks: modular network modules or fixed L/LM variants — do not assume identical breakouts
- StackWise: include stack cables/kits and member count on the Cisco column
- MLAG/EVPN pairs: include dual-chassis optics and peer-link design on the Arista column
Subscription / license lines to equalize
| BOM line | Arista path | Cisco path |
|---|---|---|
| Feature OS | EOS feature set on SKU | Network Essentials / Advantage as required |
| Ops platform | CloudVision seats / term | Catalyst Center / DNA term years |
| NAC / fabric | 802.1X / segmentation design | ISE + SD-Access licenses if in scope |
| Support | Arista support term | Smart Net / CX term — same years |
Lean Arista when: EOS skill, CloudVision, continuous PoE/SSU, and DC+campus consistency dominate risk.
Lean Cisco when: StackWise ops, ISE/SD-Access, uniform UPOE+, and Catalyst wireless adjacency dominate risk.
Ops Plane & Adjacent RFQs
- CloudVision vs Catalyst Center — ops plane peer
- Arista vs Juniper campus — third-vendor campus column
- Aruba CX vs Catalyst — HPE campus alternate
- Catalyst 9300 vs 9300X — Cisco-only step-up
RFQ Checklist: Dual-Vendor Campus PoE BOM
- Closet role: 1G PoE vs mGig AP vs high-watt IoT
- Exact port map and mGig counts both sides
- PoE: per-port class + total budget (1× vs 2× PSU)
- HA: StackWise member count vs MLAG/EVPN pair
- Uplinks: speed, form factor, optics + 10% spares
- Arista: exact 720XP SKU + DRAM size on PDF
- Cisco: exact C9300 / 9300X SKU + uplink module
- CloudVision vs Catalyst Center / DNA term years
- ISE / SD-Access / segmentation if required
- Wireless adjacency (WLC/AP vendor) as a note — separate BOM if CapEx
- Support term years equalized
- Lead time / ATP dated on both quotes
BENQUAN GLOBAL LIMITED supplies Arista 720XP and Cisco Catalyst 9300 with competitive pricing and configuration support. Use SKU Lookup, then submit the dual-vendor brief on rfq.html.
Frequently Asked Questions
Is Arista 720XP better than Catalyst 9300?
Neither is universally better. Arista often wins EOS/CloudVision consistency; Cisco often wins StackWise, ISE/SD-Access, and dense UPOE+. Dual-RFQ matched PoE and uplinks.
Does every 720XP need remapping in 2026?
No. Only select 4GB-DRAM 720XP-48Y6/24Y6 lines face December 31, 2026 last order. Confirm DRAM on the quote PDF.
Can StackWise replace MLAG on the Arista column?
No. They are different HA models. Document stack size or leaf-pair design on each vendor line — do not assume identical failure domains.
720XP vs Catalyst for Wi-Fi 7 AP closets?
Freeze mGig port counts and PoE class first. Peer mGig 720XP SKUs to Catalyst mGig/UPOE SKUs — not 1G-only access switches.
Where to RFQ both platforms?
BENQUAN GLOBAL LIMITED supplies Arista 720XP and Cisco Catalyst 9300 with competitive pricing. Submit one RFQ with the checklist above.