Quick Take: Why This Campus Fork Matters
Use this bake-off for non-Cisco wired closet refreshes with APs, phones, and IoT — especially when Aruba wireless or Arista DC EOS already sit in the estate. Keep DC leaf on separate lines: 7050X3 vs QFX5120 · 7050X4 vs QFX5130.
Not this page:
- 720XP vs Catalyst 9300 — Cisco campus PoE peer (Gold B)
- Arista vs Juniper campus — EX campus peer
- Aruba CX vs Catalyst — HPE vs Cisco access
- 7050SX3 / 720XP EOS 2026 — last-order calendars
Architecture Fork: EOS Campus vs AOS-CX / VSF
Both cover enterprise PoE access. The decision is operational gravity — unified EOS campus+DC versus Aruba wired+wireless Central depth — plus how you build closet HA.
| Dimension | Arista 720XP | Aruba CX 6300 |
|---|---|---|
| OS | EOS (campus/DC adjacency) | AOS-CX |
| Ops plane | CloudVision (on-prem / cloud) | Aruba Central / on-prem tooling; NAE |
| Closet HA | MLAG / EVPN leaf pairs — no classic VSF stack | VSF (family rules; up to 10 on 6300 class) |
| Alt HA | Paired leaves with peer-link design | VSX (2-member) where designed |
| Uplink pattern | Often fixed 25G + 100G class | Built-in 1/10/25/50G SFP56 class by SKU |
| Licensing gravity | EOS + CloudVision subscription | AOS-CX feature set + Central / support term |
Honest Peer Mapping: Closet Intent First
| Closet intent | Arista 720XP path | CX 6300 path | Honesty note |
|---|---|---|---|
| 1G PoE access | 720XP-48Y6 / 24Y6 class | 6300F/M 1G PoE (e.g. JL665A / JL661A class) | Audit 4GB DRAM on select 720XP lines before Dec 31, 2026 |
| mGig Wi-Fi 6/7 AP | 720XP-48ZC2 class (mixed 2.5G/5G) | 6300M Smart Rate Class 6/8 (e.g. JL659A class) | Equalize mGig port count — not total RJ45 count |
| High-watt AP / camera | Confirm which ports are 60W vs 30W | Class 6 (60W) / Class 8 (90W) + PSU budget | 720XP often splits PoE classes — CX may be uniform with modular PSUs |
| Multi-switch closet | Paired leaves (MLAG/EVPN) | VSF stack (confirm F/M vs L domain) | Different failure and upgrade models |
| Cost-optimized L2 | Smaller 720XP variant (confirm SKU) | 6300L (VSF only with other L) | Do not mix L into F/M VSF without saying so |
| Aggregation / dense 25–100G | Not this RFQ — use DC leaf peers | CX 8325 (separate RFQ) | 8325 is not a PoE access peer |
PoE & mGig Sizing: Equal Assumptions Only
Campus RFQs fail when one quote assumes continuous PoE through upgrades and the other assumes stack reload with PoE drop — state the maintenance model explicitly. CX 6300 PoE ceilings depend on PSU SKUs (series budgets up to ~2880W class); quote PSUs, not just switch stickers.
| Sizing factor | What to freeze | Common failure |
|---|---|---|
| PoE budget | Watts with one vs dual / modular PSU | Comparing max sticker watts without PSU count |
| Per-port class | 30W / 60W / 90W map | Assuming every 720XP port is Class 8 |
| mGig mix | 2.5G / 5G / Smart Rate port counts | Peering mixed mGig to uniform 1G PoE |
| VSF / pair behavior | Stack size vs leaf-pair upgrade model | Ignoring AP/phone reboot risk on cutover night |
| Uplink optics | 25G/50G/100G DAC/AOC/optics + VSF cables | Switch-only dual quote |
Uplinks, HA & License Parity
Hardware reality checks
- 720XP uplinks: often fixed 25G + 100G class — confirm SKU drawing
- CX 6300 uplinks: built-in SFP56 paths (1/10/25/50G class) — do not assume identical breakouts
- VSF: include member count, family (F/M vs L), and DAC kits on the Aruba column
- MLAG/EVPN pairs: include dual-chassis optics and peer-link design on the Arista column
Subscription / license lines to equalize
| BOM line | Arista path | Aruba path |
|---|---|---|
| Feature OS | EOS feature set on SKU | AOS-CX software feature set as required |
| Ops platform | CloudVision seats / term | Aruba Central / on-prem term years |
| Wireless adjacency | Note AP vendor — separate CapEx if needed | Aruba AP / Central wireless often co-scoped |
| Support | Arista support term | HPE Aruba support term — same years |
Lean Arista when: EOS skill, CloudVision, continuous PoE/SSU, and DC+campus consistency dominate risk.
Lean Aruba when: Aruba wireless/Central, VSF ops, Smart Rate Class 6/8 customization, and AOS-CX automation dominate risk.
Ops Plane & Adjacent RFQs
- 720XP vs Catalyst 9300 — Cisco campus PoE Gold B
- CloudVision vs Catalyst Center — when Cisco is the third column
- Arista vs Juniper campus — EX campus column
- Aruba CX vs Catalyst — HPE vs Cisco access
- CX 6300 specs — Aruba-only ladder
- Mist vs Aruba Central — WLAN ops adjacency
RFQ Checklist: Dual-Vendor Campus PoE BOM
- Closet role: 1G PoE vs mGig AP vs high-watt IoT
- Exact port map and mGig / Smart Rate counts both sides
- PoE: per-port class + total budget (PSU count explicit)
- HA: VSF member count + F/M vs L domain vs MLAG/EVPN pair
- Uplinks: speed, form factor, optics + VSF DACs + 10% spares
- Arista: exact 720XP SKU + DRAM size on PDF
- Aruba: exact 6300M/F/L SKU + PSU SKUs
- CloudVision vs Aruba Central term years
- Wireless adjacency (Aruba AP / other) as a note — separate BOM if CapEx
- Support term years equalized
- Lead time / ATP dated on both quotes
BENQUAN GLOBAL LIMITED supplies Arista 720XP and HPE Aruba CX 6300 with competitive pricing and configuration support. Use SKU Lookup, then submit the dual-vendor brief on rfq.html.
Frequently Asked Questions
Is Arista 720XP better than Aruba CX 6300?
Neither is universally better. Arista often wins EOS/CloudVision consistency; Aruba often wins Central wireless adjacency, VSF, and Smart Rate Class 6/8 customization. Dual-RFQ matched PoE and uplinks.
Is CX 8325 a fair 720XP PoE peer?
No. Peer access closets to CX 6300. Put CX 8325 on a separate aggregation RFQ.
Can VSF replace MLAG on the Arista column?
No. They are different HA models. Document stack size or leaf-pair design on each vendor line — do not assume identical failure domains.
720XP vs CX 6300 for Wi-Fi 7 AP closets?
Freeze mGig / Smart Rate port counts and PoE class first. Peer mGig 720XP SKUs to CX 6300M Smart Rate — not 1G-only or 8325 aggregation switches.
Where to RFQ both platforms?
BENQUAN GLOBAL LIMITED supplies Arista 720XP and HPE Aruba CX 6300 with competitive pricing. Submit one RFQ with the checklist above.