Quick Take: The 400G Ethernet Back-End for HGX
This page turns one number — your HGX node count — into a quote-ready Ethernet back-end fabric BOM. Every quantity below is field-validated on multi-phase 2026-2027 GPU cluster deployments and scales linearly from a pilot pod to thousands of nodes. If you are still choosing between vendors, start with Nexus vs Arista for GPU fabrics.
Not this page:
- QM9700 + ConnectX-7 InfiniBand fabric BOM — the NDR InfiniBand alternative for the same HGX node counts
- ConnectX-7 vs Broadcom NIC guide — the server NIC side of every link on this page
Architecture & Wiring: Rail-Optimized Two-Tier Leaf-Spine
The fabric is one repeated pattern. GPU i of every server lands on the same leaf group ("rail"), so NCCL collectives stay a single hop inside their rail and only cross the spine for inter-rail traffic.
| Layer | Component | Detail |
|---|---|---|
| Node NIC | 8x 400G per HGX node | One rail per GPU; OSFP cage on the NIC side |
| Node-to-leaf link | OSFP-400G-VSR4 + QDD-400G-VSR4 | 400GBASE-VSR4 both ends, MPO-12 APC, parallel OM4, up to 50 m |
| Leaf | DCS-7060DX5-64S-F | 32 ports down to nodes, 32 up to spine — 1:1 non-blocking |
| Leaf-to-spine link | AOC-D-D-400G-5M | 400G active optical cable, QSFP-DD to QSFP-DD, 5 m in-row |
| Spine | DCS-7060DX5-64S-F | All 64 ports face leaves; ECMP across the spine plane |
| Routing stack | LIC-FIX-4-FLX-L | EVPN, VXLAN, SR, base MPLS LSR, up to 256K routes per switch |
Platform Peers: Who Else Plays in the 64x400G Tier
| Platform | 400G ports | Where it wins | Deep dive |
|---|---|---|---|
| Arista DCS-7060DX5-64S-F | 64x QSFP-DD | EOS consistency, merchant silicon, multivendor BOM freedom | This page |
| NVIDIA Spectrum / Spectrum-X | 32-64x | Tightest NVIDIA stack co-engineering, adaptive routing | Arista vs Spectrum leaf |
| Cisco Nexus 9364D-GX2A | 64x QSFP-DD | NX-OS / ACI estates, Cisco support gravity | Nexus vs Arista GPU fabric |
| Juniper QFX5230-64CD | 64x QSFP-DD | Junos + Apstra intent-based ops | Arista vs QFX (25.6T tier) |
| NVIDIA Quantum-2 QM9700 (InfiniBand) | 64x NDR | Latency-first estates already standardized on IB | QM9700 + CX-7 IB BOM |
Ethernet with RoCEv2 has closed most of the NCCL performance gap to InfiniBand at this scale, and it keeps the fabric multivendor. If your organization is IB-committed, size the same node counts on the QM9700 BOM instead — the optics math changes completely.
Fabric Sizing Math: From Node Count to Line-Item Quantities
The derivation for one 512-node scalable unit, with each leaf split 32 ports down / 32 ports up:
- Node ports: 512 nodes x 8 NICs = 4,096 x 400G ports facing servers
- Leaves: 8 rails x (512 ports per rail / 32 down-ports per leaf) = 8 x 16 = 128 leaves
- Spines: 128 leaves x 32 uplinks = 4,096 uplinks / 64 ports = 64 spines
- Per-node ratio: 0.375 switch, 8 node optics, 8 leaf optics, 8 AOCs per HGX node
| Fabric size | HGX nodes | GPUs | Leaf | Spine | DCS-7060DX5-64S-F | OSFP-400G-VSR4 | QDD-400G-VSR4 | AOC-D-D-400G-5M | LIC-FIX-4-FLX-L |
|---|---|---|---|---|---|---|---|---|---|
| Pilot pod | 64 | 512 | 16 | 8 | 24 | 512 | 512 | 512 | 24 |
| 1x scalable unit | 512 | 4,096 | 128 | 64 | 192 | 4,096 | 4,096 | 4,096 | 192 |
| 1.5x scalable unit | 768 | 6,144 | 192 | 96 | 288 | 6,144 | 6,144 | 6,144 | 288 |
| 3x scalable unit | 1,536 | 12,288 | 384 | 192 | 576 | 12,288 | 12,288 | 12,288 | 576 |
BOM Line Items: The Five Part Numbers That Build Everything
| Part number | Description | Role | Qty per 512 nodes |
|---|---|---|---|
| DCS-7060DX5-64S-F | Arista 7060X5, 64x 400GbE QSFP-DD, front-to-rear air, 2x AC PSU | Leaf + spine | 192 |
| LIC-FIX-4-FLX-L | FLX-Lite license, Fixed Group 4 — 256K routes, EVPN, VXLAN, SR, base MPLS LSR | One per switch | 192 |
| OSFP-400G-VSR4 | 400GBASE-VSR4 transceiver, OSFP, MPO-12 APC, up to 50 m over parallel OM4 | Node / NIC side | 4,096 |
| QDD-400G-VSR4 | 400GBASE-VSR4 transceiver, QSFP-DD, MPO-12 APC, up to 50 m over parallel OM4 | Leaf / switch side | 4,096 |
| AOC-D-D-400G-5M | 400G active optical cable, QSFP-DD to QSFP-DD, 5 m | Leaf to spine | 4,096 |
Ordering gotchas that surface after the PO
- Airflow suffix: the -F variant is front-to-rear — confirm it matches your cold-aisle intake before mixing in -R chassis
- APC polish: VSR4 uses MPO-12 APC (angled) connectors — standard UPC MMF trunks will not mate; order APC patch cords and cassettes (full detail: OSFP vs QDD VSR4 optics guide)
- 50 m budget: VSR4 tops out at 50 m over OM4 — node rows further from the leaf rack need a DR4 single-mode redesign, not longer MMF
- 5 m AOC limit: AOC-D-D-400G-5M assumes leaf and spine in-row; cross-row spine runs move to transceivers plus structured fiber
- Breakout reserve: QSFP-DD ports split 4x100G for storage and management edges — reserve ports before the fabric is fully populated
Licensing & Ops: What FLX-Lite Covers and What Gates Delivery
License scope
- Included: full routing up to 256K routes, EVPN, VXLAN, Segment Routing, base MPLS LSR — everything a leaf-spine GPU fabric actually uses
- Excluded: MPLS traffic engineering and link/node protection — irrelevant here; do not pay for full FLX unless another workload needs it
- Attach rule: one license per chassis, leaf and spine alike — 192 per scalable unit, quoted with the hardware, never retrofitted
Running RoCEv2 at GPU scale
- Enable PFC and ECN end-to-end for NCCL traffic; an unlossy fabric shows up as mysterious training slowdowns, not clean errors
- Pin one EOS release across all switches and qualify upgrades on the pilot pod first
- Dual AC supplies want true A/B feeds — 192 switches per unit is a real power-distribution line item, not an afterthought
Delivery risk is optics risk
Switch silicon is rarely the long pole; 8,192 VSR4 optics per scalable unit is. Stage orders by quarter, lock dated availability on every optics line, and read the 2026 optics shortage playbook before committing a cutover date to your GPU vendor.
RFQ Checklist: One Brief, Every Line Item, Dated Availability
- HGX node count per phase, confirming eight 400G NICs per node
- Topology: rail-optimized vs standard Clos; oversubscription target (1:1 default)
- Switch line: DCS-7060DX5-64S-F quantity from the sizing table; -F airflow and AC vs DC confirmed
- License line: LIC-FIX-4-FLX-L one per switch; state whether any workload needs full FLX instead
- Node optics: OSFP-400G-VSR4 = nodes x 8, plus 2-3% spares
- Leaf optics: QDD-400G-VSR4 matching node-port count, plus spares
- Leaf-spine: AOC-D-D-400G-5M for in-row runs; DR4 over SMF priced for anything beyond 5 m
- Structured cabling: MPO-12 APC polarity plan, OM4 trunks under 50 m
- Breakout plan: 4x100G reservations for storage and management edges
- EOS release pinning and support term quoted per chassis
- Dated availability per quarter for switches and optics — staged delivery in writing
- Peer column: Spectrum-X or Nexus 9364D quoted on identical assumptions
BENQUAN GLOBAL LIMITED supplies the Arista 7060X5 platform, VSR4 optics, and 400G AOCs with competitive pricing and configuration support. Verify part numbers on SKU Lookup, then submit the brief on rfq.html.
Frequently Asked Questions
What is DCS-7060DX5-64S-F?
It is the Arista 7060X5 fixed data-center switch: 64x 400GbE QSFP-DD ports, 25.6 Tbps of merchant-silicon capacity, front-to-rear airflow, dual AC supplies. In HGX clusters it serves as both leaf and spine, licensed with LIC-FIX-4-FLX-L for EVPN, VXLAN, and Segment Routing.
How many switches does a 512-node HGX cluster need?
192x DCS-7060DX5-64S-F: 128 rail-optimized leaves plus 64 spines at 1:1 subscription for 4,096 GPUs. Scaling stays linear, so 768 nodes take 288 switches and 1,536 nodes take 576, each switch carrying its own license and optics set.
What is the difference between OSFP-400G-VSR4 and QDD-400G-VSR4?
They are the same 400GBASE-VSR4 optic in two form factors. OSFP-400G-VSR4 fits the OSFP cages on HGX node NICs; QDD-400G-VSR4 fits the QSFP-DD ports on the 7060X5 leaf. The pair interoperates over MPO-12 APC parallel OM4 fiber up to 50 meters.
What does the LIC-FIX-4-FLX-L license include?
FLX-Lite for Arista Fixed Group 4: full routing up to 256K routes, EVPN, VXLAN, Segment Routing, and base MPLS LSR. Traffic engineering and link or node protection are excluded. Order one license per switch, so 192 per 512-node scalable unit.
Where can I source this Arista HGX fabric BOM in 2026-2027?
BENQUAN GLOBAL LIMITED supplies DCS-7060DX5-64S-F, VSR4 optics, and 400G AOCs with competitive pricing, worldwide shipping, and staged quarterly delivery. Submit your node count and sizing table through the RFQ desk for a free compatibility and lead-time review.