Quick Take: Storage platforms here span block, file and object: PowerStore and PowerMax anchor the Dell column, Alletra and Nimble the HPE side, with ObjectScale for S3 and PowerProtect for backup. Use the category pages to shortlist, then send one capacity brief so both columns quote identical usable terabytes. BENQUAN GLOBAL LIMITED supplies Dell and HPE storage arrays with competitive pricing.

Storage & Backup Platforms

High-performance arrays for block, file and object workloads, plus backup appliances for data protection.

Dell EMC Storage

PowerStore, Unity XT and PowerMax for block, file and unified storage. ObjectScale for S3 object. PowerProtect for backup and data protection.

Key Features

  • All-flash and hybrid arrays
  • NVMe and SCM support
  • Multi-cloud integration
  • Inline deduplication and compression
  • PowerProtect backup appliances

Ideal for: Databases, virtualization, file services, backup, AI data lakes

HPE Storage

Alletra, Nimble and 3PAR for enterprise storage. StoreOnce for backup and deduplication.

Key Features

  • AI-driven operations
  • All-flash performance
  • Cloud integration
  • Predictive analytics
  • StoreOnce deduplication

Ideal for: Mission-critical apps, VDI, backup

NetApp Storage

AFF (All-Flash FAS) and FAS hybrid arrays. ONTAP data management for unified NAS and SAN.

Key Features

  • Unified NAS and SAN
  • Data Fabric architecture
  • SnapMirror replication
  • Cloud Volumes integration
  • NVMe-oF support

Ideal for: Hybrid cloud, file services, databases

Pure Storage

FlashArray for block storage, FlashBlade for file and object. Evergreen subscription model.

Key Features

  • 100% NVMe all-flash
  • Evergreen upgrades
  • ActiveCluster for HA
  • Cloud Block Store
  • Guaranteed performance

Ideal for: Modern apps, containers, analytics

Why these platforms

Reliable data protection and high-performance storage infrastructure for production workloads.

High Performance

All-flash and NVMe arrays delivering low latency and high IOPS for demanding databases and VDI.

Scalable Architecture

Scale-out and scale-up systems that grow with capacity and performance requirements.

Data Protection

Built-in backup, replication and disaster recovery features for critical data.

Hybrid / Multi-Cloud

Integration paths to AWS, Azure and Google Cloud for hybrid deployments.

Industry use cases

Enterprise data center refresh

Replace aging arrays while aligning fabric and security in one multi-vendor BOM.

Open Enterprise Data Center landing

Higher education / research storage

Petabyte-scale object and parallel storage for AI labs and research datasets.

Open Higher Education HPC landing

Storage brand RFQ hubs (freeze usable capacity, licensing, and support on the brand page, then submit one request):

  • NetApp — AFF / ASA / FAS usable-TiB and ONTAP licensing RFQ
  • Pure Storage — FlashArray / FlashBlade capacity basis and Evergreen RFQ
  • Hitachi Vantara — VSP high-end block and SAN adjacency RFQ
  • Huawei OceanStor Dorado — AFA usable-TiB and license BOM RFQ
  • Infortrend — EonStor GS / DS / CS budget-disciplined RFQ
  • Quantum — Scalar tape and DXi dedup backup-tier RFQ

Ready to modernize your storage?

Get a storage quote

Send capacity, protocol (block / file / object) and workload notes. BENQUAN returns configuration options — typically within 24 hours.

Request Quote

Or call +852-21349834 · info@benquan.hk