Comprehensive security solutions to protect your infrastructure and data. Next-generation firewalls, threat protection, and security management from leading vendors.
Request a Quote →Quick Take: Next-generation firewalls, VPN, IDS/IPS, and endpoint protection from Fortinet, Palo Alto Networks, Cisco, and Check Point. The platforms below overlap heavily on paper and diverge on subscription structure, throughput under inspection, and management model — which is where the real cost difference sits. BENQUAN supplies all four with competitive pricing.
Quick Answer: Four vendor families are covered here. Fortinet FortiGate leads on ASIC price-performance and SD-WAN, Palo Alto Networks on ML-powered prevention and unified policy, Cisco on integration with an existing Cisco estate, and Check Point on centralised management. Model choice should follow throughput under inspection, not raw firewall figures.
Next-generation firewalls, threat protection, and security management from leading vendors
Next-generation firewalls with integrated threat protection, SD-WAN, and security fabric architecture.
Ideal for: Perimeter security, SD-WAN, branch offices
Advanced firewalls with ML-powered threat prevention. Prisma Cloud for cloud security.
Ideal for: Enterprise security, cloud protection, zero trust
Browse 15,000+ Palo Alto SKUs · NGFW sizing questionnaire · PA-1400 specs · PA-3400 specs · PA-5400 specs · Request NGFW sizing quote
Firepower NGFW, Umbrella DNS security, and SecureX platform for integrated security.
Ideal for: Network security, remote access, threat response
Quantum security gateways with unified threat prevention and Infinity architecture.
Ideal for: Enterprise perimeter, cloud security, endpoints
Quick Answer: Security hardware is rarely the hard part of a security purchase — the subscription term, the license dependencies, and the throughput you actually retain once inspection is enabled are. We validate those against your BOM before you commit, and quote Hong Kong lead times on hardware, subscriptions, and support as one package.
Enterprise-grade protection backed by leading vendors and certified engineers
Multi-layered security with IPS/IDS, sandboxing, and AI-powered threat intelligence to protect against zero-day attacks.
Implement zero trust security with identity-based access control, micro-segmentation, and continuous verification.
Protect hybrid and multi-cloud environments with CASB, CWPP, and cloud-native security controls.
Unified security management and visibility across your entire infrastructure with SIEM integration.
Security brand RFQ hubs (freeze model, subscription scope, and HA on the brand page, then submit one request):
Share throughput, concurrent sessions, interface needs, HA, and subscription term. Free NGFW sizing and delivery-risk check — before you lock the BOM.
Free NGFW Sizing & QuoteOr browse the Palo Alto SKU list · call +852-21349834