Quick Take: Nutanix runs storage, compute and virtualization as one software layer on x86 nodes, so a cluster can start at three nodes and expand one node at a time. Buyers face three real decisions here: appliance versus software-only, Starter against Pro or Ultimate, and AHV versus keeping vSphere.

Overview

Quick Answer: Nutanix collapses compute, storage, and virtualization into one software layer running on standard x86 nodes from Dell, HPE, Lenovo, Cisco, or Nutanix itself. Local SSDs and disks form a shared pool with deduplication, compression, snapshots, and replication built in, so clusters start at three nodes and grow one node at a time.

Nutanix pioneered hyperconverged infrastructure (HCI), transforming data center operations by collapsing compute, storage, and virtualization into a single software-defined platform. Traditional three-tier architectures—separate servers, storage arrays, and networking—create complexity, vendor lock-in, and operational overhead. Nutanix eliminates these silos, enabling IT teams to deploy applications in minutes instead of weeks, scale infrastructure incrementally, and manage everything from a unified interface.

The Nutanix platform runs on industry-standard x86 servers from Dell, HPE, Lenovo, and Cisco, or as Nutanix-branded appliances. Software-defined storage pools local SSDs and HDDs across nodes, presenting a unified storage fabric to VMs. Built-in data services—deduplication, compression, erasure coding, snapshots, and replication—eliminate the need for external storage arrays. The result: 60% lower TCO, 90% faster provisioning, and infrastructure that scales linearly from 3 nodes to thousands.

Why Hyperconverged Infrastructure

Quick Answer: The payoff is operational: one platform and one console, Prism, replace separate server, storage, and hypervisor tooling. Capacity grows a node at a time instead of through forklift refreshes, VMs come from self-service catalogs in minutes, and retiring the SAN removes rack space, power, and cooling from the budget.

  • Eliminate Silos: Unified platform for compute, storage, and virtualization reduces integration complexity and vendor sprawl
  • Simplify Operations: Single-pane-of-glass management (Prism) replaces multiple consoles for servers, storage, and hypervisors
  • Scale Incrementally: Add nodes one at a time to grow capacity and performance without forklift upgrades
  • Accelerate Deployment: Provision VMs in minutes with self-service catalogs and automation
  • Reduce Costs: Eliminate SAN hardware, reduce data center footprint, and lower power/cooling expenses

Core Components

Quick Answer: Six pieces make up the stack: AOS provides the distributed storage and data services, AHV is the included KVM hypervisor, Prism handles management and one-click upgrades, Flow enforces microsegmentation, Files and Objects deliver SMB, NFS, and S3 services, and built-in replication reaches a one-minute recovery point.

AOS (Acropolis Operating System)

Software-defined storage and data services layer. Pools local drives across nodes, provides distributed file system, and delivers enterprise features like snapshots, clones, and replication without external arrays.

AHV (Acropolis Hypervisor)

Built-in KVM-based hypervisor with no licensing costs. Supports Linux and Windows VMs with live migration, high availability, and disaster recovery. Alternative to VMware vSphere and Microsoft Hyper-V.

Prism Management

Unified management interface for infrastructure and applications. Prism Central provides multi-cluster management, capacity planning, and cost governance. One-click upgrades eliminate maintenance windows.

Flow Network Security

Microsegmentation and network visualization for VM-to-VM traffic. Define security policies based on application tiers, automatically enforce isolation, and detect anomalous traffic patterns.

Files and Objects

Scale-out file services (SMB/NFS) and S3-compatible object storage built on HCI. Eliminate dedicated NAS appliances and object storage gateways. Integrated with Active Directory and LDAP.

Disaster Recovery

Built-in replication to remote sites with RPO down to 1 minute. Automated failover orchestration and runbook execution. Supports asynchronous and near-synchronous replication modes.

Use Cases

Quick Answer: VDI is the anchor workload, where a three-node cluster serves 100 to 200 desktops on Citrix or Horizon and scales by adding nodes. Beyond that, enterprises consolidate SQL Server, Oracle, and SAP HANA, run one-node or two-node branch clusters with a witness, and give developers self-service test environments.

Virtual Desktop Infrastructure (VDI)

Nutanix is the leading HCI platform for VDI, supporting Citrix, VMware Horizon, and Windows 365. Shadow clones technology enables instant desktop provisioning from gold images. Intelligent tiering places hot data on SSDs and cold data on HDDs, optimizing cost and performance. A 3-node cluster supports 100-200 desktops; scale to thousands by adding nodes. Integration with GPU servers enables graphics-intensive workloads for CAD and video editing.

Private Cloud for Enterprise Applications

Run business-critical applications—ERP, CRM, databases—on Nutanix with the simplicity of public cloud and control of on-premises infrastructure. Self-service catalogs let developers provision VMs without IT tickets. Calm automation orchestrates multi-tier application deployments. Nutanix supports SQL Server, Oracle, SAP HANA, and containerized applications on Kubernetes.

Remote Office / Branch Office (ROBO)

Deploy 1-node or 2-node clusters at remote sites with witness VM for quorum. Centralized management from headquarters eliminates the need for local IT staff. Replication to headquarters provides disaster recovery. Ideal for retail stores, bank branches, and manufacturing plants. Pair with branch office firewalls for secure connectivity.

Database Consolidation

Consolidate SQL Server, Oracle, PostgreSQL, and MySQL databases onto Nutanix. Era database management automates provisioning, patching, and cloning. One-click database clones enable dev/test environments without storage overhead. Supports Always On Availability Groups and Oracle RAC for high availability.

Test/Dev and DevOps

Developers provision VMs and Kubernetes clusters on-demand via self-service portal. Calm blueprints automate application stack deployment (web, app, database tiers). Instant clones enable rapid environment creation for testing. CI/CD pipelines integrate with Jenkins, GitLab, and Azure DevOps. Store container images and artifacts on backup infrastructure for long-term retention.

Deployment Models

Quick Answer: Three ways to buy it. Nutanix appliances arrive pre-imaged, with NX-1365-G9 as the 1U all-flash option and NX-3060-G9 as the 2U hybrid. Software-only licenses install on validated Dell, HPE, or Lenovo servers you already source. NC2 runs the same stack inside AWS, Azure, or Google Cloud.

Nutanix Appliances

Pre-configured hardware with Nutanix software pre-installed. NX-1365-G9 (1U, all-flash) and NX-3060-G9 (2U, hybrid) are popular models. Factory integration eliminates compatibility issues. Ideal for organizations prioritizing simplicity and single-vendor support.

Software-Only on Dell, HPE, Lenovo

Install Nutanix software on existing or new servers from preferred hardware vendors. Leverage existing vendor relationships, support contracts, and financing. Validated configurations ensure compatibility. Provides flexibility to mix hardware generations in the same cluster.

Nutanix Cloud Clusters (NC2)

Run Nutanix on AWS, Azure, and Google Cloud for hybrid cloud deployments. Unified management across on-premises and cloud. Burst workloads to cloud during peak demand. Disaster recovery to cloud without maintaining secondary data center. Supports VM mobility between on-premises and cloud.

Licensing and Editions

Quick Answer: Licensing is a per-node subscription on annual or multi-year terms. Starter covers AOS, AHV, and Prism Element for branch and small clusters. Pro layers on Prism Central, microsegmentation via Flow, and stronger data protection for production. Ultimate adds Era, Files, Objects, and Kubernetes. AHV needs no separate hypervisor license.

Nutanix offers subscription-based licensing with three editions:

  • Starter: Core HCI features (AOS, AHV, Prism Element). Suitable for ROBO and small deployments.
  • Pro: Adds Prism Central, Flow microsegmentation, and advanced data protection. Recommended for production workloads.
  • Ultimate: Includes Era database management, Files/Objects, and Kubernetes (Karbon). For enterprise-wide deployments.

Licensing is per node with annual or multi-year terms. Includes software updates, upgrades, and support. No separate hypervisor licensing required when using AHV.

Migration Strategies

Quick Answer: Nutanix Move handles bulk VM transfers off vSphere, and you can keep vSphere running on the new cluster first, switching to AHV later to spread the risk. SAN-backed VMs move with storage vMotion or live migration, typically two to four weeks for 100 to 200 machines. Physical servers convert through Move or VMware Converter.

From VMware vSphere

Nutanix Move automates VM migration from vSphere to AHV. Supports bulk migration with minimal downtime. Alternatively, continue running vSphere on Nutanix HCI, then migrate to AHV over time. This phased approach reduces risk and allows gradual transition.

From Traditional SAN

Migrate VMs from SAN-backed storage to Nutanix HCI using storage vMotion (VMware) or live migration (Hyper-V). Decommission SAN arrays after migration to reclaim data center space and reduce maintenance costs. Typical migration completes in 2-4 weeks for 100-200 VMs.

Physical to Virtual (P2V)

Convert physical servers to VMs using VMware Converter or Nutanix Move. Ideal for legacy applications that cannot be re-architected. Reduces hardware footprint and simplifies disaster recovery. Test converted VMs thoroughly before decommissioning physical servers.

Best Practices

Quick Answer: Start at three or four nodes, all-flash for databases and desktops, hybrid for general workloads, and leave 20 to 30 percent headroom so a node failure does not stall the cluster. Give production 10 or 25GbE with separate VLANs for management, guests, and replication, then test failover quarterly.

Cluster Sizing

Start with 3-4 nodes for redundancy and performance. Size nodes based on workload: all-flash for databases and VDI, hybrid (SSD + HDD) for general-purpose workloads. Plan for 20-30% headroom to accommodate failures and growth. Use Nutanix Sizer tool for accurate capacity planning.

Network Design

Deploy 10GbE or 25GbE networking for production clusters. Use separate VLANs for management, VM traffic, and storage replication. Redundant switches and NIC teaming eliminate single points of failure. For large deployments, integrate with spine-leaf network architectures.

Data Protection

Configure snapshots for critical VMs with hourly or daily schedules. Replicate to remote site for disaster recovery. Test failover procedures quarterly to verify RTO/RPO targets. Use Nutanix Mine for long-term backup retention and compliance.

Why Choose BENQUAN GLOBAL

Quick Answer: Engagement runs in six stages: assessment of existing workloads to size the cluster, a pilot deployment to validate performance, migration planning and execution off legacy infrastructure, integration of networking, backup, and disaster recovery, administrator training on Prism and AHV, then ongoing capacity planning after handover.

As a Nutanix partner, BENQUAN GLOBAL delivers complete HCI solutions:

  • Assessment: Analyze existing infrastructure and workloads to design optimal Nutanix configuration
  • Proof of Concept: Deploy pilot cluster to validate performance and functionality
  • Migration Services: Plan and execute VM migration from legacy infrastructure
  • Integration: Configure networking, storage, backup, and disaster recovery
  • Training: Administrator training on Prism, AHV, and Nutanix best practices
  • Support: Ongoing support, capacity planning, and optimization

Next Steps

Quick Answer: Scope the request before pricing: node count and generation, all-flash or hybrid tiering, edition, hypervisor choice, and the workloads moving first. Add site details such as rack power, 10 or 25GbE switching, and the replication target, since those decide cluster layout more than the software line does.

Modernize your data center with Nutanix HCI. Contact BENQUAN GLOBAL to discuss your infrastructure requirements.

Request a Quote

Key Takeaway: Size the cluster at three or four nodes with 20 to 30 percent spare capacity, choose all-flash where databases and desktops live, and pick the edition by whether Flow and Files are actually needed. BENQUAN GLOBAL LIMITED supplies Nutanix NX appliances and validated Dell, HPE and Lenovo nodes with competitive pricing.

Ready to Quote Nutanix Hyperconverged Infrastructure?

Share your BOM or requirements. BENQUAN validates part numbers and stock options.

Request a Quote

Or call +852-21349834 · info@benquan.hk