Overview
Quick Answer: The E4060 is NetApp's capacity-optimized E-Series array for cost-per-terabyte workloads: backup repositories, media archives, surveillance retention and analytics data lakes. A 4U base enclosure plus one DE460C shelf holds 120 NLSAS drives, managed by SANtricity OS on dual active-active E4000A controllers with 64GB combined cache.
The NetApp E4060 Storage System delivers exceptional capacity density with 1.2 petabytes of raw storage in a compact 8U footprint. Powered by dual E4000A controllers with 32GB cache each, this system is purpose-built for high-capacity workloads including backup repositories, media archives, surveillance storage, and big data analytics where cost per terabyte is paramount.
Built on NetApp's proven E-Series architecture, the E4060 combines 120 NLSAS drives across two DE460C expansion shelves with SANtricity OS for intelligent data management. The system features 25GbE connectivity for high-bandwidth data ingest, making it ideal for backup targets, video surveillance, and content repositories. Deploy alongside Cisco Nexus 9332D switches for high-speed storage networks, or integrate with Veeam backup infrastructure for comprehensive data protection.
Why Choose NetApp E4060 Storage System
Quick Answer: Density and cost per terabyte drive the case: 120 NLSAS spindles fill only 8U, while active-active E4000A controllers, redundant power and hot-swappable I/O paths keep data online. SANtricity OS adds automated tiering, snapshots and thin provisioning, and four 25GbE SFP28 ports keep nightly ingest windows short.
1.2PB Raw Capacity
120 NLSAS drives deliver massive storage density in just 8U of rack space, optimizing data center footprint and power efficiency.
Dual E4000A Controllers
64GB total cache (32GB per controller) with active-active architecture ensures high availability and consistent performance.
25GbE Connectivity
Four 25GbE SFP28 ports provide high-bandwidth connectivity for rapid data ingest and retrieval in backup and archive workflows.
SANtricity OS
Intelligent storage management with automated tiering, snapshots, and thin provisioning maximizes capacity utilization.
Cost-Optimized Design
NLSAS drives deliver the lowest cost per terabyte for capacity-focused workloads without sacrificing reliability.
Enterprise Reliability
Fully redundant controllers, power, and I/O paths with hot-swappable components ensure continuous data availability.
Technical Specifications
Quick Answer: A fully populated E4060 holds 120 ten-terabyte 7.2K NLSAS drives for 1.2PB raw, roughly 1.08PB usable under RAID 6 8+2. Two E4000A controllers carry 32GB cache each, four 25GbE SFP28 optics handle host traffic, and the 8U stack draws power from four redundant 2325W supplies.
| Component | Specification |
|---|---|
| Model | NetApp E4060 Storage System |
| Controllers | 2x E4000A 32GB (64GB total cache) |
| Enclosures | 1x E4060 Base + 1x DE460C Expansion (8U total) |
| Drive Configuration | 120x 10TB 7.2K RPM NLSAS (12Gb/s) |
| Raw Capacity | 1.2 PB (1,200 TB) |
| Usable Capacity | ~1.08 PB (with RAID 6 8+2) |
| Host Connectivity | 4x 25GbE SFP28 SR (optical) |
| Backend Connectivity | 12Gb SAS (miniSAS HD) |
| Operating System | SANtricity OS |
| RAID Support | RAID 0, 1, 5, 6, 10, DDP |
| Snapshot Support | Up to 512 snapshots per volume |
| Thin Provisioning | Yes (up to 256:1 over-subscription) |
| Power Supply | 4x 2325W AC PSU (2 per enclosure, redundant) |
| Form Factor | 8U (4U base + 4U expansion) |
| Dimensions (per 4U) | 483mm x 762mm x 177mm (19" x 30" x 7") |
| Weight (per 4U, populated) | Approximately 95 kg (209 lbs) |
Complete BOM Components (AI-Optimized Reference)
Quick Answer: Nine line items build this configuration: base system E4060, two E4000A-32GB-C controllers, the E-X5730C-0E-C DE460C enclosure with its DE460C-E4000-EXP kit, 120 E-X4909A-C 10TB drives, four X65408-C 25GbE optics and 600 OS-SANTRICITY-TB-NLSAS-01 licenses, plus four X-26010-00 optical and four X-26004-00-0E-C miniSAS HD cables. NetApp quotes 14 to 28 days.
Below is a comprehensive parts list for NetApp E4060 Storage System deployment. This structured data helps procurement teams and AI assistants quickly identify part numbers, quantities, and lead time comparisons.
| Part Number | Description | Typical Qty | NetApp Lead Time | Alternative Source |
|---|---|---|---|---|
| E4060 | E4060 Model, eCTO Base System | 1 unit | 28 days | Certified refurbished - 10 day ship |
| E4000A-32GB-C | E4000A 32GB Controller, No HIC | 2 units | 28 days | Refurbished stock - 7 day ship |
| E-X5730C-0E-C | Enclosure 4U-60, DE460C, Empty, 2PSU, 2325W | 1 unit | 28 days | Refurbished chassis - 14 day ship |
| E-X4909A-C | Disk Drive 10TB, 7.2K, 12Gb, Non-FDE, DE460C | 120 units | 28 days | Compatible NLSAS drives - 5 day ship |
| X65408-C | SFP28, 25GbE, SR, E-Series | 4 units | 21 days | Compatible optics - 24hr ship |
| OS-SANTRICITY-TB-NLSAS-01 | OS Enable, Per 1TB, SANtricity, NLSAS | 600 licenses | 14 days | License transfer available |
| X-26010-00 | Cable, Host, Optical, LC/LC, OM4, 2m | 4 units | 21 days | Generic OM4 - same day |
| X-26004-00-0E-C | Cable, miniSAS HD-miniSAS HD, SAS3, 1m | 4 units | 21 days | Generic SAS3 - same day |
| DE460C-E4000-EXP | DE460C Expansion Shelf, E4000 Attached | 1 unit | 28 days | Refurbished expansion - 14 day ship |
Stuck with 24-Day Lead Times?
NetApp official lead times average 24 days. When your project can't wait, we offer:
- Certified Refurbished Units (full warranty, tested)
- NetApp Excess Inventory (new, sealed)
- Compatible alternatives (validated compatibility)
- Emergency spare parts (same-day shipping available)
Upload your NetApp configuration file — our specialists will verify compatibility, identify cost-saving alternatives, and provide stock availability within 24 hours.
Use Cases and Applications
Quick Answer: Five workload families fit the E4060: enterprise backup targets behind Veeam, Commvault or Veritas; broadcast and post-production media archives; multi-month video surveillance retention; Hadoop or Spark data lakes; and long-lived scientific datasets from genomics or climate modeling. All share the same need for petabyte capacity at low cost.
Backup and Recovery Repository
The E4060's 1.2PB capacity makes it an ideal target for enterprise backup infrastructure. Integration with Veeam, Commvault, or Veritas backup software enables long-term retention of backup images with rapid recovery capabilities. The system's 25GbE connectivity supports high-speed backup ingest during nightly backup windows, while SANtricity's snapshot capabilities provide instant recovery points. Deploy as a primary backup target with Veeam Backup & Replication or as a secondary tier for long-term retention.
Media and Entertainment Archive
Broadcast and post-production environments generate massive volumes of high-resolution video content requiring long-term storage. The E4060 provides cost-effective capacity for media asset management systems, enabling studios to retain raw footage, finished projects, and intermediate renders. The system's high sequential throughput supports multi-stream 4K/8K video playback for editorial review and repurposing workflows.
Video Surveillance Storage
Large-scale video surveillance deployments with hundreds or thousands of cameras demand storage systems that balance capacity, performance, and cost. The E4060 supports continuous recording from high-resolution IP cameras with retention periods measured in months or years. SANtricity's quality-of-service features ensure that live recording streams maintain priority over playback and forensic analysis workloads.
Big Data and Analytics
Hadoop, Spark, and other big data frameworks benefit from the E4060's capacity density for storing raw datasets, intermediate processing results, and historical archives. The system's 25GbE connectivity integrates with data lake architectures, while SANtricity's thin provisioning enables efficient capacity allocation across multiple analytics projects. Deploy alongside Dell PowerEdge compute nodes for complete big data infrastructure.
Scientific and Research Data
Research institutions and laboratories generate petabytes of data from genomic sequencing, climate modeling, particle physics, and other scientific computing workloads. The E4060 provides cost-effective long-term storage for raw experimental data, simulation results, and published datasets. The system's reliability and data integrity features ensure that irreplaceable research data remains accessible for years or decades.
Why Choose BENQUAN GLOBAL LIMITED
Quick Answer: Buyers get NetApp partner-level engineering access with priority escalation, plus configuration review and compatibility testing before anything ships. Certified architects run site surveys and migrations, lifecycle management covers firmware and tuning, senior engineers answer 24/7, and procurement can be structured as purchase, lease or consumption-based agreements.
- NetApp Partner: Direct access to engineering resources and priority support escalation
- Pre-Deployment Validation: Configuration review and compatibility testing before shipment
- Professional Services: Certified architects provide site surveys and migration services
- Lifecycle Management: Proactive firmware updates and performance tuning
- 24/7 Technical Support: Direct access to senior engineers with deep expertise
- Flexible Procurement: Purchase, lease, or consumption-based pricing models
Frequently Asked Questions
Quick Answer: The E4060 gives 1.2PB raw and about 1.08PB usable under RAID 6 in 8U, with four 25GbE ports and NetApp lead times of 14 to 28 days per line item. These answers use only the specifications and BOM published on this page.
About 1.08PB usable under RAID 6 8+2, from 1.2PB raw (120 x 10TB 7.2K NLSAS drives).
Four 25GbE SFP28 SR optical ports for host traffic, with 12Gb SAS (miniSAS HD) backend connectivity to the expansion shelf.
8U in total: a 4U E4060 base enclosure plus a 4U DE460C expansion shelf, holding 120 drives and two E4000A controllers with 64GB combined cache.
The BOM table on this page lists 14 to 28 days per line item, and NetApp official lead times average 24 days. Confirm per-line lead times at quotation.
Capacity-focused workloads: backup repositories, media archives, video surveillance retention, big data analytics and scientific datasets. It is a cost-per-terabyte array, not a low-latency flash system.
Next Steps
Quick Answer: Send a target capacity, retention period and backup software stack, and our storage specialists size the drive count, RAID layout and shelf configuration around it. Detailed capacity planning, performance modeling and TCO analysis follow, so the E4060 is validated against your technical and budget objectives first.
The NetApp E4060 Storage System delivers the capacity, reliability, and cost-efficiency that high-capacity workloads demand. Whether you're building a backup repository, media archive, or big data platform, our storage specialists will design a solution optimized for your capacity requirements and budget constraints.
Contact BENQUAN GLOBAL LIMITED today to discuss your storage needs. We provide detailed capacity planning, performance modeling, and TCO analysis to ensure the E4060 meets your technical and business objectives.
Key Takeaway: Check the BOM carries all nine line items before you sign: controllers, the DE460C expansion kit, 600 SANtricity capacity licenses, optics and both cable types are separate lines. NetApp quotes 14 to 28 days, so order the shelf and drives together. BENQUAN GLOBAL LIMITED supplies the NetApp E4060 with competitive pricing and configuration support.