Quick Take: The Lenovo ThinkSystem DE6600F is a 2U24 all-flash array with 24x 7.6TB NVMe SED drives (182.4 TB raw), dual 128GB active-active controllers, and 10/25GbE iSCSI plus 12Gb SAS connectivity. It targets databases, virtualization, and VDI needing sub-millisecond latency. BENQUAN supplies the DE6600F with configuration support.

This datasheet covers the ThinkSystem DE6600F all-flash array — capacity, controllers, connectivity, data services, and deployment fit. Part numbers and figures follow Lenovo's published specifications; confirm the exact RAID layout and HIC configuration on the quote. Related: Storage & Backup, request a quote.

Technical Specifications

Quick Answer: The DE6600F ships 24x 7.6TB NVMe SED drives for 182.4 TB raw (typically 120-150 TB usable by RAID), with two DE6600 controllers holding 128GB cache each (256GB total, active-active). Connectivity spans 10/25GbE iSCSI via SFP28 host interface cards plus 12Gb SAS expansion for external enclosures.

Storage capacity

ComponentSpecification
Drive type7.6TB NVMe SSD with Self-Encrypting Drive (SED)
Drive quantity24 drives
Raw capacity182.4 TB
Usable capacityVaries by RAID configuration (typically 120-150 TB)
Form factor2.5-inch NVMe

Controller architecture

ComponentSpecification
Controller modelDE6600 controller with 128GB cache per controller
Controller quantity2 (active-active configuration)
Total cache256GB (128GB per controller)
RedundancyFull redundancy with automatic failover

Connectivity options

Interface typeSpecificationQuantity
10/25GbE iSCSISFP28 optical modules2 ports
10/25GbE iSCSI HICHost interface card2 cards
12Gb SAS expansionExternal enclosure connectivity2 HIC cards
Optical cables5-meter LC-LC OM4 multimode fiber2 cables

Overview

Quick Answer: The Lenovo ThinkSystem DE6600F is a high-performance all-flash array for demanding enterprise workloads. Built on NVMe with dual 128GB active-active controllers, it delivers sub-millisecond latency, full redundancy, and multi-protocol connectivity in a dense 2U24 chassis. BENQUAN supplies the DE6600F with configuration support.

Key highlights:

  • 24x 7.6TB NVMe SSDs with Self-Encrypting Drive (SED) technology
  • Dual 128GB controllers for maximum performance and redundancy
  • Multi-protocol support: 10/25GbE iSCSI and 12Gb SAS
  • 2U24 form factor optimized for density and efficiency
  • Enterprise-grade reliability with comprehensive data protection

Architecture and Design

Quick Answer: Native NVMe removes storage bottlenecks for sub-millisecond latency and high IOPS, while active-active dual controllers with 128GB cache each ensure zero-downtime failover. Self-encrypting drives protect data at rest with no performance penalty, and dual-protocol iSCSI and SAS support integrates the array into existing infrastructure.

Design pillarWhat it delivers
NVMe performanceNative NVMe eliminates bottlenecks for sub-millisecond latency and millions of IOPS on latency-sensitive apps
Dual-controller redundancyActive-active architecture with 128GB cache per controller for zero-downtime failover
Self-encrypting drivesHardware encryption at rest with no performance impact; meets sensitive-data compliance
Multi-protocol flexibilityiSCSI (10/25GbE) and SAS (12Gb) for seamless integration into existing infrastructure

Physical specifications

  • Form factor: 2U rack-mountable chassis
  • Drive bays: 24x 2.5-inch NVMe slots
  • Power supplies: redundant hot-swappable PSUs
  • Cooling: redundant hot-swappable fans
  • Rack-mount kit: included for standard 19-inch racks

Software and Data Services

Quick Answer: The DE6600F software bundle covers four areas: data protection (snapshots, async replication, RAID 0/1/5/6/10, hot spares), storage efficiency (thin provisioning, automatic tiering, SSD optimization, capacity forecasting), management (web GUI, CLI, REST API, SNMP), and performance (QoS, cache optimization, workload balancing, analytics).

AreaCapabilities
Data protectionSnapshots for point-in-time recovery, asynchronous replication, RAID 0/1/5/6/10, hot-spare management
Storage efficiencyThin provisioning, automatic tiering, SSD optimization, capacity forecasting
ManagementWeb-based GUI, CLI for automation, REST API integration, SNMP monitoring
PerformanceQoS controls, cache optimization, workload balancing, performance analytics

Use Cases and Applications

Quick Answer: The DE6600F fits latency-sensitive, IOPS-heavy workloads: Oracle, SQL Server, MySQL, and PostgreSQL databases; VMware, Hyper-V, and KVM virtualization; VDI boot storms; business-critical ERP, CRM, and financial systems; and analytics or data-warehouse queries needing high sequential throughput. NVMe and 256GB cache absorb peak I/O without bottlenecks.

WorkloadWhy the DE6600F fits
DatabaseConsistent low latency and high IOPS for Oracle, SQL Server, MySQL, PostgreSQL
VirtualizationPredictable performance for VMware vSphere, Hyper-V, KVM; iSCSI simplifies SAN deployment
VDIAbsorbs boot storms and login-storm I/O across hundreds of concurrent desktops
Business-critical appsDual-controller redundancy and SED encryption for ERP, CRM, and financial systems
Analytics & warehousingHigh throughput for large sequential reads and writes in BI workloads

Deployment Considerations

Quick Answer: Plan a 10/25GbE iSCSI fabric with jumbo frames and a 1GbE out-of-band management network, and use multipathing (MPIO, DM-Multipath, or NMP) for availability. Hosts run Windows Server, RHEL, SLES, Ubuntu, or ESXi with iSCSI initiators. Scale by adding DE240S expansion enclosures over 12Gb SAS without disrupting production.

Network requirements

  • iSCSI network: 10GbE or 25GbE switches with jumbo-frame support
  • Management network: 1GbE for out-of-band management
  • Multipathing: recommended for high availability

Host compatibility

  • Operating systems: Windows Server, RHEL, SLES, Ubuntu, VMware ESXi
  • Protocols: iSCSI initiators required on host systems
  • Multipathing software: MPIO (Windows), DM-Multipath (Linux), NMP (VMware)

Scalability

  • Expansion: add DE240S expansion enclosures via 12Gb SAS
  • Capacity growth: add enclosures without disrupting production
  • Performance scaling: distribute workloads across multiple arrays

Why Choose BENQUAN GLOBAL?

Quick Answer: As an authorized Lenovo solutions provider, BENQUAN delivers up-front workload analysis and capacity planning, authentic products with full manufacturer warranty, professional installation, configuration, and data-migration services, plus ongoing lifecycle support that includes firmware updates, capacity reviews, and direct technical assistance across the whole deployment.

  • Expert consultation: workload analysis, capacity planning, and architecture design
  • Competitive pricing: Lenovo supply-chain access for authentic products with full warranty
  • Professional services: installation, configuration, data migration, and integration
  • Ongoing support: firmware updates, capacity planning, and technical assistance across the lifecycle

Key Takeaway: The ThinkSystem DE6600F pairs 24x 7.6TB NVMe SED drives (182.4 TB raw) with dual 128GB active-active controllers and 10/25GbE iSCSI plus 12Gb SAS, delivering sub-millisecond latency for databases, virtualization, and VDI. Size usable capacity by RAID level and plan a jumbo-frame iSCSI fabric with multipathing. BENQUAN GLOBAL LIMITED supplies the DE6600F with competitive pricing and configuration support.

Frequently Asked Questions

What is the Lenovo ThinkSystem DE6600F all-flash array?

What is the Lenovo ThinkSystem DE6600F all-flash array? Confirm the SKU, software train, and options on the quote. BENQUAN GLOBAL LIMITED supplies the listed models with BOM risk review.

Sizing a DE6600F all-flash array?

Send your capacity target, RAID preference, and iSCSI or SAS host plan for a free compatibility and delivery risk assessment. BENQUAN validates the drive, controller, and HIC configuration.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk