Quick Take: A quoted PowerStore 9200T is rarely a single box. This configuration spans a base chassis plus three NVMe expansion shelves, 1,136TB of raw flash before reduction, and three front-end fabrics at once. Rack space, 200-240V circuits, and fabric choice therefore matter as much as the capacity headline.

What Is Dell PowerStore 9200T?

Dell PowerStore 9200T is a high-end all-NVMe unified storage platform engineered for performance-intensive enterprise workloads. With 74 hot-swappable NVMe SSDs delivering over 1.1PB of raw capacity, it provides sub-millisecond latency and massive IOPS for the most demanding database, virtualization, and VDI environments.

The platform is powered by dual controllers with Intel Xeon Scalable processors and 2.56TB of system cache. It supports block (iSCSI/FC), file (NFS/SMB), and vVol data services in a single unified architecture, with inline deduplication and compression delivering up to 5:1 data reduction. Connectivity options include 25GbE optical, 100GbE mezzanine cards, and 32Gb Fibre Channel for flexible fabric integration.

This configuration includes three 24x2.5" NVMe expansion enclosures and Dell AppSync for application-consistent snapshot management, with 36-month ProSupport and next business day on-site service. As an authorized Dell Technologies distributor, BENQUAN GLOBAL LIMITED delivers the complete PowerStore 9200T solution worldwide.

Get a Quote

74
NVMe SSDs (15.36TB each)
1.1+
PB Raw NVMe Capacity
5:1
Data Reduction Guarantee
36
Month ProSupport Warranty

Key Advantages

Quick Answer: PowerStore 9200T is the capacity flagship: 74 NVMe SSDs at 15.36TB each reach 1,136TB raw, backed by 2,560GB of cache and redundant 2100W power modules. Reaching 74 drives takes three expansion enclosures beyond the base chassis, so plan four rack positions and matching circuits.

Why enterprises choose Dell PowerStore 9200T for their all-NVMe storage infrastructure

All-NVMe Architecture

End-to-end NVMe with 74x 15.36TB enterprise NVMe SSDs. Every I/O path optimized for flash with sub-millisecond latency across all workloads. No SATA or SAS tiers to manage.

Multi-Protocol Connectivity

25GbE optical (4-port), 100GbE mezzanine, and 32Gb Fibre Channel (4-port). Simultaneous block, file, and vVol support in a single unified storage fabric for maximum deployment flexibility.

AppSync Data Protection

Dell AppSync for PowerStore enables application-consistent snapshots, clones, and replication. Automate protection for Oracle, SQL Server, and VMware with policy-based SLA management.

5:1 Data Reduction Guarantee

Inline deduplication and compression with Dell's guaranteed 5:1 data reduction. Hardware-accelerated compression engines maximize effective capacity and reduce TCO per terabyte.

36-Month ProSupport

Dell ProSupport with next business day on-site service for 36 months. Includes parts-only warranty, hardware support, and software maintenance for PowerStore and AppSync.

Redundant Enterprise Power

Dual 2100W (200-240V) redundant power supplies with hot-swap capability. Lot 9 compliant for China market deployments, ensuring maximum uptime in mission-critical data centers.

Detailed Configuration

Quick Answer: Complete bill of materials for the Dell PowerStore 9200T with expansion enclosures. Complete bill of materials for the Dell PowerStore 9200T with expansion enclosures PowerStore 9200T Dell Customer Racked China 2560GB Device DIMM 1280GB Per Node 25GbE Optical 4-Port Card Pair V2 32Gb FC 4-Port IO Module Pair Dual 2100W (200-240V) Lot 9 Power Supply C13.

Complete bill of materials for the Dell PowerStore 9200T with expansion enclosures

Category Qty SKU Description
PowerStore 9200T Main Enclosure
Hardware 1 210-BDJC PowerStore 9200T Dell Customer Racked China
Hardware 1 370-AHFI 2560GB Device DIMM 1280GB Per Node
Hardware 21 400-BRXM NVMe SED NON-FIPS SSD 15.36TB
Hardware 2 400-BOEY PowerStore NVRAM QTY 2
Hardware 1 406-BCBT 25GbE Optical 4-Port Card Pair V2
Hardware 1 406-BBSJ PowerStore 100GbE Mezz Pair
Hardware 1 565-BBJS 32Gb FC 4-Port IO Module Pair
Hardware 4 407-BCGB 25GbE Optical SFP Pair
Hardware 1 450-BBBH Dual 2100W (200-240V) Lot 9 Power Supply
Hardware 1 384-BDZZ Single Drive Failure 8+1
Hardware 1 343-BBTN PowerStore Base Enclosure Install Kit
Hardware 1 450-AITI C13 Powercord Pair GB1002 250V 10A
Software 1 528-BTZK PowerStore Base SW
Software 1 611-BBBV DARE DISABLED=IC
Maintenance 1 709-BDKZ Parts Only Warranty 36 Months
Maintenance 1 199-BJJN ProSupport NBD On-Site 36 Months
Maintenance 1 883-BBFM Custom Field Deployment
PowerStore 24x2.5" NVMe Expansion Enclosure — 3 Cabinets
Hardware 3 210-BFVE PowerStore NVMe Expansion L9 24x2.5 FLD
Hardware 53 400-BRXM NVMe SED NON-FIPS SSD 15.36TB
Hardware 1 343-BBTM PowerStore ENS24 ExpKit FLD QTY 1 Gen2
Hardware 2 343-BBTK PowerStore ENS24 ExpKit FLD QTY 2-3 Gen2
Hardware 3 343-BBTL PowerStore NVMe EXP Install Kit
Hardware 3 450-AITI C13 Powercord Pair GB1002 250V 10A
Maintenance 3 709-BDLG Parts Only Warranty 36 Months
Maintenance 3 199-BJJN ProSupport NBD On-Site 36 Months
Maintenance 3 883-BBFM Custom Field Deployment
AppSync for PowerStore
Software 1 210-BEGM AppSync for PowerStore
Software 1 528-BYHF AppSync Str Pk for PowerStore=CB
Maintenance 1 487-BJQK ProSupport Mission Critical AppSync SW 36 Months
Maintenance 1 883-BBFN No On-Site Deployment

Technical Specifications

Quick Answer: The dual-controller array carries 2,560GB of cache split evenly across two nodes and 74 SED non-FIPS drives at 15.36TB, giving 1,136TB raw. Front-end ports cover iSCSI, Fibre Channel, NFS, SMB and vVols simultaneously, and the 36-month warranty is ProSupport with next business day on-site cover.

Dell PowerStore 9200T system specifications

Component Specification
Form Factor Dual-controller enterprise storage array
System Cache 2,560GB (1,280GB per node)
Drive Configuration 74x NVMe SED NON-FIPS SSD 15.36TB
Raw Capacity 1,136TB (1.1PB+) NVMe flash
Front-End Connectivity 4x 25GbE optical + 2x 100GbE mezzanine + 4x 32Gb FC
Expansion Enclosures 3x PowerStore 24x2.5" NVMe Expansion
Protocols Block (iSCSI/FC), File (NFS/SMB), vVols
Data Reduction Inline deduplication and compression, 5:1 guarantee
Software PowerStoreOS, AppSync for PowerStore
Power Dual 2100W (200-240V) redundant, Lot 9 compliant
Warranty 36 months ProSupport + NBD On-Site

Application Scenarios

Quick Answer: Oracle, SQL Server and SAP HANA databases needing sub-millisecond response are the primary fit, followed by VDI at thousands of desktops and unified file-plus-block consolidation. AppSync handles application-consistent protection, CloudIQ adds predictive monitoring, and hot-swap drives with redundant feeds cover 7x24 data center operation.

Where Dell PowerStore 9200T delivers maximum value

Mission-Critical Databases

Oracle, SQL Server, and SAP HANA workloads benefit from sub-millisecond NVMe latency and 32Gb FC connectivity. Inline data reduction maximizes effective capacity for growing database environments with predictable performance.

Virtualization & VDI

VMware vVols and Hyper-V support with AppSync for VM-consistent snapshots. High IOPS density supports thousands of virtual desktops and servers on a single all-NVMe storage platform.

Unified File & Block

Simultaneous NFS/SMB and iSCSI/FC support eliminates storage silos. Consolidate file shares, block volumes, and application data onto a single unified platform with centralized management.

Hybrid Cloud Integration

PowerStore integrates with Dell CloudIQ for AI-driven predictive analytics. Native replication and tiering to public cloud for disaster recovery, data mobility, and capacity expansion.

Application Data Protection

AppSync automates application-consistent snapshots for Oracle, SQL Server, Exchange, and SharePoint. Policy-driven SLA management with self-service restore for database administrators.

Enterprise Data Center

Dual 2100W redundant power, hot-swappable NVMe drives, and 36-month ProSupport with NBD on-site service. Designed for 7x24 mission-critical data center operations with maximum availability.

Storage Insights

Quick Answer: Choosing between 9200T and 5200T is a capacity and cache decision, not a protocol one: both expose the same 25GbE, 100GbE, and 32Gb Fibre Channel front end. The 9200T doubles cache to 1,280GB per node and quadruples usable footprint using 15.36TB drives.

Expert analysis and guidance on all-NVMe enterprise storage with Dell PowerStore 9200T

Dell PowerStore 9200T: A Complete Guide to All-NVMe Enterprise Storage

Enterprise storage has undergone a fundamental transformation over the past decade. The shift from spinning disks to flash memory was the first wave; the second wave is all-NVMe architecture, where every drive in the array connects directly via the NVMe protocol rather than through legacy SAS or SATA controllers. Dell PowerStore 9200T represents the leading edge of this transformation.

What Is All-NVMe Storage?

Traditional all-flash arrays (AFAs) use SSDs with a SAS or SATA interface, which introduces protocol overhead and latency. NVMe (Non-Volatile Memory Express) was designed from the ground up for flash storage, connecting directly to the PCIe bus for dramatically lower latency and higher queue depths. The PowerStore 9200T takes this further with an end-to-end NVMe architecture — from the drives to the controllers to the network fabric — eliminating protocol translation bottlenecks entirely.

Hardware Architecture

The 9200T configuration includes 74 NVMe SSDs at 15.36TB each, delivering over 1.1PB of raw NVMe capacity. The dual-controller architecture provides 2.56TB of system cache (1.28TB per node) with Intel Xeon Scalable processors and dedicated NVRAM for write acceleration. Three 24x2.5 expansion enclosures provide the additional 53 drive slots beyond the 21 in the main enclosure.

Connectivity and Performance

With 25GbE optical (4-port), 100GbE mezzanine (2-port), and 32Gb Fibre Channel (4-port) connectivity, the PowerStore 9200T can integrate into any enterprise fabric. The multi-protocol design supports simultaneous block (iSCSI/FC), file (NFS/SMB), and VMware vVol access from a single storage platform, eliminating the need for separate silos for different workload types.

PowerStore 9200T vs PowerStore 5200T: Choosing the Right All-NVMe Platform

Dell PowerStore 9000 series spans from the mid-range 5200T to the flagship 9200T, each designed for different capacity and performance tiers. Understanding the differences is critical for selecting the right platform for your enterprise workloads.

Scale and Capacity

The PowerStore 9200T supports up to 74 NVMe drives with expansion enclosures, while the 5200T supports fewer drive slots and limited expansion options. For organizations with multi-petabyte flash requirements, the 9200T provides the headroom to scale within a single system without migrating to a new platform.

Connectivity Options

Both models support 25GbE and 32Gb FC, but the 9200T adds 100GbE mezzanine connectivity for environments requiring maximum throughput. The 100GbE mezzanine cards provide direct PCIe connectivity to the storage controllers, enabling high-bandwidth data paths for demanding workloads like real-time analytics and large-scale virtualization.

Data Services

All PowerStore models share the same PowerStoreOS data services — inline deduplication and compression, thin provisioning, snapshots, cloning, replication, and QoS. The 9200T's additional hardware resources (more CPU cores, larger cache) allow these services to run concurrently at higher performance levels without impacting production workloads.

When to Choose PowerStore 9200T

Choose the 9200T when: you need more than 500TB of raw NVMe capacity, you require 100GbE connectivity, you are consolidating multiple storage arrays into a single platform, or you need the highest possible IOPS for latency-sensitive workloads like OLTP databases and real-time analytics.

Deploying AppSync for PowerStore: Application-Centric Data Protection

Data protection in modern enterprise environments has evolved beyond simple snapshot schedules. Applications have specific consistency requirements, recovery point objectives (RPOs), and recovery time objectives (RTOs) that demand intelligent, policy-driven protection. Dell AppSync for PowerStore addresses these requirements with application-aware snapshot management.

How AppSync Works

AppSync integrates directly with enterprise applications to create crash-consistent and application-consistent snapshots. For Oracle databases, AppSync uses Recovery Manager (RMAN) integration to ensure snapshots are transaction-consistent and can be restored without data loss. For SQL Server, it leverages Volume Shadow Copy Service (VSS) for application-aware protection. For VMware, it coordinates with vSphere APIs for VM-consistent snapshots across all datastores.

Service Plan Architecture

AppSync organizes protection through service plans — policy documents that define what to protect, how often to take snapshots, how long to retain them, and where to replicate them. Each plan can include multiple service level agreements (SLAs) with different retention periods. For example, a database might have 15-minute snapshots retained for 24 hours, hourly snapshots retained for 30 days, and daily snapshots retained for one year.

Self-Service Restore

One of AppSync's most valuable features is self-service restore for database administrators. Rather than submitting a restore request to the storage team, DBAs can browse available snapshots through the AppSync interface and initiate a restore directly. This reduces recovery times from hours to minutes and eliminates the bottleneck of relying on storage administrators for routine recovery operations.

Integration at BENQUAN

BENQUAN GLOBAL LIMITED delivers PowerStore 9200T with full AppSync deployment and configuration services. Our certified engineers set up service plans aligned with your application SLAs, configure replication targets, and train your team on self-service restore workflows. Contact our team to discuss your data protection requirements.

Frequently Asked Questions

Quick Answer: Buyers most often ask how 74 drives are distributed, what the 5:1 guarantee means for usable terabytes, and which ports come standard. The short answers: 21 slots sit in the base chassis and 53 across three shelves, effective capacity passes 5.6PB, and every fabric option ships in this build.

Common questions about Dell PowerStore 9200T

This configuration includes 74 NVMe SSDs at 15.36TB each, totaling approximately 1,136TB (1.1PB+) of raw NVMe storage. With Dell's guaranteed 5:1 data reduction, effective capacity exceeds 5.6PB. The configuration includes 21 drives in the main enclosure and 53 drives across three 24x2.5" expansion enclosures.
The configuration includes a 25GbE optical 4-port card pair, a 100GbE mezzanine pair, and a 32Gb Fibre Channel 4-port IO module pair, plus 4x 25GbE optical SFP pairs. This provides flexible connectivity for iSCSI, NFS, SMB, and Fibre Channel fabrics.
36-month Dell ProSupport with next business day on-site service, plus a 36-month parts-only warranty and Custom Field Deployment for both the main unit and expansion enclosures. AppSync includes ProSupport Mission Critical software maintenance for 36 months.
This configuration includes three PowerStore NVMe 24x2.5" expansion enclosures. The first enclosure uses a QTY 1 Gen2 ExpKit, and the second and third use QTY 2-3 Gen2 ExpKits, providing a total of 72 additional NVMe drive slots plus the 21 slots in the main enclosure.
PowerStore Base SW includes PowerStoreOS with inline deduplication, compression, thin provisioning, snapshots, cloning, replication, and QoS. AppSync for PowerStore is included for application-consistent snapshot management. CloudIQ provides AI-driven monitoring and predictive analytics.
PowerStore 9200T excels at mission-critical database workloads (Oracle, SQL Server, SAP HANA), large-scale virtualization and VDI environments, unified file and block consolidation, and application-centric data protection with AppSync. Its all-NVMe architecture with sub-millisecond latency is ideal for any latency-sensitive enterprise workload.

Key Takeaway: Decide the fabric before the drive count: 32Gb Fibre Channel and 25GbE optical ship as separate 4-port module pairs, and the 100GbE mezzanine is ordered per node. Check that four rack positions and dual 200-240V feeds are free, then confirm whether 5:1 reduction holds for your workload mix.

Will the 9200T fit your rack and power envelope?

A base chassis plus three expansion shelves changes the site requirements, not just the capacity line. Click below for a free compatibility and delivery risk assessment: rack units, 200-240V circuit count, fabric choice, and shelf lead time. BENQUAN GLOBAL LIMITED supplies Dell PowerStore 9200T with competitive pricing.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk