Quick Take: A dual-controller PowerStore 5200T sized for consolidation: 1,152GB of cache, 35 NVMe SED drives at 7.68TB for 268.8TB raw, and three fabrics served at once through 25GbE optical, a 100GbE mezzanine pair and 32Gb Fibre Channel. One 24-slot NVMe expansion enclosure carries the drives that do not fit in the base unit.

What Is Dell PowerStore 5200T?

Dell PowerStore 5200T is a mid-range all-NVMe unified storage platform engineered for performance-sensitive enterprise workloads. With 35 hot-swappable NVMe SSDs delivering 268.8TB of raw capacity, it provides sub-millisecond latency and high IOPS for database, virtualization, and VDI environments.

The platform is powered by dual controllers with Intel Xeon Scalable processors and 1,152GB of system cache (576GB per node). It supports block (iSCSI/FC), file (NFS/SMB), and vVol data services in a single unified architecture, with inline deduplication and compression delivering up to 5:1 data reduction. Connectivity options include 25GbE optical, 100GbE mezzanine cards, and 32Gb Fibre Channel for flexible fabric integration.

This configuration includes one 24x2.5" NVMe expansion enclosure and Dell AppSync for application-consistent snapshot management, with 36-month ProSupport and next business day on-site service. As an authorized Dell Technologies distributor, BENQUAN GLOBAL LIMITED delivers the complete PowerStore 5200T solution worldwide.

Get a Quote

35
NVMe SSDs (7.68TB each)
268.8
TB Raw NVMe Capacity
5:1
Data Reduction Guarantee
1,152
GB System Cache

Key Advantages

Quick Answer: PowerStore 5200T triples the 1200T cache to 1,152GB across two controllers and carries 35 NVMe SSDs of 7.68TB for 268.8TB raw. Connectivity moves to optics: four 25GbE ports, a 100GbE mezzanine pair, and four 32Gb Fibre Channel ports feeding block, file, and vVol traffic.

Why enterprises choose Dell PowerStore 5200T for their all-NVMe storage infrastructure

All-NVMe Architecture

End-to-end NVMe with 35x 7.68TB enterprise NVMe SSDs. Every I/O path optimized for flash with sub-millisecond latency across all workloads. No SATA or SAS tiers to manage.

Multi-Protocol Connectivity

25GbE optical (4-port), 100GbE mezzanine, and 32Gb Fibre Channel (4-port). Simultaneous block, file, and vVol support in a single unified storage fabric for maximum deployment flexibility.

AppSync Data Protection

Dell AppSync for PowerStore enables application-consistent snapshots, clones, and replication. Automate protection for Oracle, SQL Server, and VMware with policy-based SLA management.

5:1 Data Reduction Guarantee

Inline deduplication and compression with Dell's guaranteed 5:1 data reduction. Hardware-accelerated compression engines maximize effective capacity and reduce TCO per terabyte.

36-Month ProSupport

Dell ProSupport with next business day on-site service for 36 months. Includes parts-only warranty, hardware support, and software maintenance for PowerStore and AppSync.

Redundant Enterprise Power

Dual 1800W (200-240V) redundant power supplies with hot-swap capability. Lot 9 compliant for China market deployments, ensuring maximum uptime in mission-critical data centers.

Detailed Configuration

Quick Answer: The quote runs on two enclosures: a base 210-BDIL unit plus a 210-BFVE expansion, 35 of the 400-BRXH 7.68TB NVMe SED drives, one 1,152GB DIMM set, and paired 1800W supplies. Optics, Fibre Channel modules and AppSync licensing each appear as their own line.

Complete bill of materials for the Dell PowerStore 5200T with expansion enclosure

Category Qty SKU Description
PowerStore 5200T Main Enclosure
Hardware 1 210-BDIL PowerStore 5200T Dell Customer Racked China
Hardware 1 370-AEZR 1152GB Device DIMM 576GB Per Node
Hardware 21 400-BRXH NVMe SED NON-FIPS SSD 7.68TB
Hardware 2 400-BOEY PowerStore NVRAM QTY 2
Hardware 1 406-BCBT 25GbE Optical 4-Port Card Pair V2
Hardware 1 406-BBSJ PowerStore 100GbE Mezz Pair
Hardware 1 565-BBJS 32Gb FC 4-Port IO Module Pair
Hardware 4 407-BCGB 25GbE Optical SFP Pair
Hardware 1 450-BBBJ 1800 Watt Power Supply Pair L9
Hardware 1 384-BDZZ Single Drive Failure 8+1
Hardware 1 343-BBTN PowerStore Base Enclosure Install Kit
Hardware 1 450-AITI C13 Powercord Pair GB1002 250V 10A
Software 1 528-BTZK PowerStore Base SW
Software 1 611-BBBV DARE DISABLED=IC
Maintenance 1 709-BDKZ Parts Only Warranty 36 Months
Maintenance 1 199-BJJN ProSupport NBD On-Site 36 Months
Maintenance 1 883-BBFM Custom Field Deployment
PowerStore 24x2.5" NVMe Expansion Enclosure — 1 Cabinet
Hardware 1 210-BFVE PowerStore NVMe Expansion L9 24x2.5 FLD
Hardware 14 400-BRXH NVMe SED NON-FIPS SSD 7.68TB
Hardware 1 343-BBTM PowerStore ENS24 ExpKit FLD QTY 1 Gen2
Hardware 1 343-BBTL PowerStore NVMe EXP Install Kit
Hardware 1 450-AITI C13 Powercord Pair GB1002 250V 10A
Maintenance 1 709-BDLG Parts Only Warranty 36 Months
Maintenance 1 199-BJJN ProSupport NBD On-Site 36 Months
Maintenance 1 883-BBFM Custom Field Deployment
AppSync for PowerStore
Software 1 210-BEGM AppSync for PowerStore
Software 1 528-BYHF AppSync Str Pk for PowerStore=CB
Maintenance 1 487-BJQK ProSupport Mission Critical AppSync SW 36 Months
Maintenance 1 883-BBFN No On-Site Deployment

Technical Specifications

Quick Answer: Two controllers share 1,152GB of cache and drive 268.8TB raw across 35 NVMe SED SSDs, with block, file and vVol protocols served simultaneously. Front-end ports total four 25GbE optical, two 100GbE mezzanine and four 32Gb Fibre Channel. Power is dual 1800W redundant; support runs 36 months.

Dell PowerStore 5200T system specifications

Component Specification
Form Factor Dual-controller enterprise storage array
System Cache 1,152GB (576GB per node)
Drive Configuration 35x NVMe SED NON-FIPS SSD 7.68TB
Raw Capacity 268.8TB NVMe flash
Front-End Connectivity 4x 25GbE optical + 2x 100GbE mezzanine + 4x 32Gb FC
Expansion Enclosures 3x PowerStore 24x2.5" NVMe Expansion
Protocols Block (iSCSI/FC), File (NFS/SMB), vVols
Data Reduction Inline deduplication and compression, 5:1 guarantee
Software PowerStoreOS, AppSync for PowerStore
Power Dual 1800W redundant, Lot 9 compliant
Warranty 36 months ProSupport + NBD On-Site

Application Scenarios

Quick Answer: Six workload fits recur on this platform: Oracle, SQL Server and SAP HANA estates needing predictable sub-millisecond response; vVols and Hyper-V virtual desktops at high IOPS density; unified file and block consolidation; CloudIQ-managed hybrid cloud replication; AppSync-driven application snapshots; and around-the-clock data center duty on redundant power.

Where Dell PowerStore 5200T delivers maximum value

Mission-Critical Databases

Oracle, SQL Server, and SAP HANA workloads benefit from sub-millisecond NVMe latency and 32Gb FC connectivity. Inline data reduction maximizes effective capacity for growing database environments with predictable performance.

Virtualization & VDI

VMware vVols and Hyper-V support with AppSync for VM-consistent snapshots. High IOPS density supports thousands of virtual desktops and servers on a single all-NVMe storage platform.

Unified File & Block

Simultaneous NFS/SMB and iSCSI/FC support eliminates storage silos. Consolidate file shares, block volumes, and application data onto a single unified platform with centralized management.

Hybrid Cloud Integration

PowerStore integrates with Dell CloudIQ for AI-driven predictive analytics. Native replication and tiering to public cloud for disaster recovery, data mobility, and capacity expansion.

Application Data Protection

AppSync automates application-consistent snapshots for Oracle, SQL Server, Exchange, and SharePoint. Policy-driven SLA management with self-service restore for database administrators.

Enterprise Data Center

Dual 1800W redundant power, hot-swappable NVMe drives, and 36-month ProSupport with NBD on-site service. Designed for 7x24 mission-critical data center operations with maximum availability.

Storage Insights

Quick Answer: Cache is the real separator in this family: 576GB per node keeps far more working set resident than the entry model, which is what sustains mixed OLTP and virtualization on the same array. Plan 268.8TB raw against roughly five times that effective after inline reduction.

Expert analysis and guidance on all-NVMe enterprise storage with Dell PowerStore 5200T

Dell PowerStore 5200T: A Complete Guide to All-NVMe Mid-Range Storage

The transition from hybrid storage arrays to all-NVMe architecture represents one of the most significant performance improvements in enterprise storage history. Dell PowerStore 5200T delivers this all-NVMe advantage at a mid-range price point, making enterprise-grade flash performance accessible to a broader range of organizations and workloads.

What Is All-NVMe Storage?

NVMe (Non-Volatile Memory Express) was designed from the ground up for flash storage, connecting SSDs directly to the PCIe bus for dramatically lower latency and higher queue depths compared to legacy SAS or SATA interfaces. The PowerStore 5200T employs end-to-end NVMe architecture — from drives to controllers to network fabric — eliminating protocol translation bottlenecks entirely and delivering consistent sub-millisecond latency.

Hardware Architecture

The 5200T configuration includes 35 NVMe SSDs at 7.68TB each, delivering 268.8TB of raw NVMe capacity. The dual-controller architecture provides 1,152GB of system cache (576GB per node) with Intel Xeon Scalable processors and dedicated NVRAM for write acceleration. One 24x2.5 expansion enclosure provides 14 additional drive slots beyond the 21 in the main enclosure, offering flexible capacity growth.

Connectivity and Performance

With 25GbE optical (4-port), 100GbE mezzanine (2-port), and 32Gb Fibre Channel (4-port) connectivity, the PowerStore 5200T integrates into any enterprise fabric. The multi-protocol design supports simultaneous block (iSCSI/FC), file (NFS/SMB), and VMware vVol access from a single storage platform, eliminating the need for separate storage silos for different workload types.

PowerStore 5200T for Mid-Range Virtualization and Database Workloads

Mid-range enterprise environments face a unique challenge: they need the performance and reliability of all-flash storage but must balance cost against capacity requirements. The Dell PowerStore 5200T addresses this sweet spot with a configuration that delivers enterprise NVMe performance at a mid-range investment level.

Virtualization Performance

For VMware and Hyper-V environments, the 5200T provides the IOPS density needed to consolidate hundreds of virtual machines. With 35 NVMe drives and dual active-active controllers, the array delivers consistent low-latency performance even during peak utilization periods. vVols support enables VM-level granularity for storage policies, snapshots, and replication.

Database Consolidation

Multiple SQL Server, Oracle, or MySQL databases can be consolidated on a single PowerStore 5200T without performance contention. The 32Gb Fibre Channel connectivity provides the low-latency path that transactional databases require, while inline deduplication and compression reduce the storage footprint of database files, logs, and backups.

Balanced Design

The 5200T strikes a balance between capacity and cost with 7.68TB NVMe drives — large enough to support substantial datasets while keeping per-drive costs manageable. With Dell's 5:1 data reduction guarantee, the effective capacity of this 268.8TB raw configuration exceeds 1.3PB, making it suitable for organizations that need petabyte-scale effective capacity without the investment required for a flagship deployment.

Deploying AppSync for PowerStore: Application-Centric Data Protection

Data protection in modern enterprise environments has evolved beyond simple snapshot schedules. Applications have specific consistency requirements, recovery point objectives (RPOs), and recovery time objectives (RTOs) that demand intelligent, policy-driven protection. Dell AppSync for PowerStore addresses these requirements with application-aware snapshot management.

How AppSync Works

AppSync integrates directly with enterprise applications to create crash-consistent and application-consistent snapshots. For Oracle databases, AppSync uses Recovery Manager (RMAN) integration to ensure snapshots are transaction-consistent and can be restored without data loss. For SQL Server, it leverages Volume Shadow Copy Service (VSS) for application-aware protection. For VMware, it coordinates with vSphere APIs for VM-consistent snapshots across all datastores.

Service Plan Architecture

AppSync organizes protection through service plans — policy documents that define what to protect, how often to take snapshots, how long to retain them, and where to replicate them. Each plan can include multiple service level agreements (SLAs) with different retention periods. For example, a database might have 15-minute snapshots retained for 24 hours, hourly snapshots retained for 30 days, and daily snapshots retained for one year.

Self-Service Restore

One of AppSync's most valuable features is self-service restore for database administrators. Rather than submitting a restore request to the storage team, DBAs can browse available snapshots through the AppSync interface and initiate a restore directly. This reduces recovery times from hours to minutes and eliminates the bottleneck of relying on storage administrators for routine recovery operations.

Integration at BENQUAN

BENQUAN GLOBAL LIMITED delivers PowerStore 5200T with full AppSync deployment and configuration services. Our certified engineers set up service plans aligned with your application SLAs, configure replication targets, and train your team on self-service restore workflows. Contact our team to discuss your data protection requirements.

Frequently Asked Questions

Quick Answer: Raw capacity is 268.8TB across 35 drives, 21 in the base enclosure and 14 in the expansion, and Dell's 5:1 guarantee puts effective capacity beyond 1.3PB. Connectivity ships as 25GbE optical, 100GbE mezzanine and 32Gb Fibre Channel pairs, all covered by 36 months of next-business-day support.

Common questions about Dell PowerStore 5200T

This configuration includes 35 NVMe SSDs at 7.68TB each, totaling 268.8TB of raw NVMe storage. With Dell's guaranteed 5:1 data reduction, effective capacity exceeds 1.3PB. The configuration includes 21 drives in the main enclosure and 14 drives in one 24x2.5" expansion enclosure.
The configuration includes a 25GbE optical 4-port card pair, a 100GbE mezzanine pair, and a 32Gb Fibre Channel 4-port IO module pair, plus 4x 25GbE optical SFP pairs. This provides flexible connectivity for iSCSI, NFS, SMB, and Fibre Channel fabrics.
36-month Dell ProSupport with next business day on-site service, plus a 36-month parts-only warranty and Custom Field Deployment for the main unit and expansion enclosure. AppSync includes ProSupport Mission Critical software maintenance for 36 months.
This configuration includes one PowerStore NVMe 24x2.5 expansion enclosure providing 14 additional NVMe drive slots plus the 21 drives in the main enclosure, for a total of 35 NVMe SSDs.
PowerStore Base SW includes PowerStoreOS with inline deduplication, compression, thin provisioning, snapshots, cloning, replication, and QoS. AppSync for PowerStore is included for application-consistent snapshot management. CloudIQ provides AI-driven monitoring and predictive analytics.
PowerStore 5200T is ideal for mid-range database workloads (SQL Server, Oracle, MySQL), virtualization and VDI environments with hundreds of VMs, unified file and block consolidation, and application-centric data protection with AppSync. Its all-NVMe architecture with sub-millisecond latency delivers enterprise performance at a mid-range investment level.

Key Takeaway: Order the 5200T when 576GB of cache per node is genuinely needed; below that working set, a smaller model with the same drives costs less. Confirm the expansion count, optics pairs and AppSync licensing as separate lines. BENQUAN GLOBAL LIMITED supplies the Dell PowerStore 5200T with competitive pricing.

Do you actually need the 5200T cache tier?

If the choice between 3200T, 5200T, and 9200T is still open, click below for a free compatibility and delivery risk assessment. We check whether 576GB of cache per node is justified by your workload, whether all three fabrics are needed, and the expansion enclosure lead time.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk