What Is the Dell PowerStore 3200T?
Quick Answer: The PowerStore 3200T is an entry-level all-NVMe unified array with 36 hot-swappable 7.68TB NVMe SSDs (276.48TB raw), dual controllers with 768GB cache, and simultaneous block, file, and vVol services. Inline dedup and compression target 5:1 data reduction, with 25/100GbE and 32Gb FC connectivity for flexible fabric integration.
The 3200T runs dual controllers on Intel Xeon Scalable processors with 768GB of system cache (384GB per node). It serves block (iSCSI/FC), file (NFS/SMB), and vVols from one unified architecture, with inline deduplication and compression delivering up to 5:1 data reduction. This configuration adds one 24x2.5-inch NVMe expansion enclosure and Dell AppSync for application-consistent snapshots, with 36-month ProSupport and next-business-day on-site service. As an authorized Dell Technologies distributor, BENQUAN delivers the complete solution worldwide.
Key Advantages
Quick Answer: Choose the 3200T when you need 25 and 100 gigabit Ethernet plus 32 gigabit Fibre Channel in one box, AppSync application-consistent protection, and the 5:1 data-reduction guarantee without stepping up to midrange 5200T spending. Confirm the required protocol mix before pricing the array tier.
| Advantage | Detail |
|---|---|
| All-NVMe architecture | End-to-end NVMe with 36x 7.68TB SSDs; every I/O path optimized for flash with sub-millisecond latency and no SAS/SATA tiers |
| Multi-protocol connectivity | 25GbE optical (4-port), 100GbE mezzanine, and 32Gb FC (4-port); simultaneous block, file, and vVol in one fabric |
| AppSync data protection | Application-consistent snapshots, clones, and replication for Oracle, SQL Server, and VMware with policy-based SLAs |
| 5:1 data-reduction guarantee | Inline dedup and hardware-accelerated compression maximize effective capacity and lower cost per TB |
| 36-month ProSupport | Next-business-day on-site service, parts warranty, and software maintenance for PowerStore and AppSync |
| Redundant enterprise power | 1800W (200-240V) hot-swap PSUs, Lot 9 compliant, for mission-critical uptime |
Detailed Configuration
Quick Answer: Freeze the BOM as appliance, expansion shelf, cache, 25GbE and 32Gb FC IO modules, and power cords. Quote exact SKU suffixes and the China Lot 9 power options on every line rather than a brochure summary, or the quote will reopen when procurement checks part numbers.
| Category | Qty | SKU | Description |
|---|---|---|---|
| PowerStore 3200T main enclosure | |||
| Hardware | 1 | 210-BDHW | PowerStore 3200T Dell customer racked China |
| Hardware | 1 | 370-AEZQ | 768GB device DIMM (384GB per node) |
| Hardware | 21 | 400-BRXH | NVMe SED non-FIPS SSD 7.68TB |
| Hardware | 1 | 400-BOEY | PowerStore NVRAM (qty 2) |
| Hardware | 1 | 406-BCBT | 25GbE optical 4-port card pair V2 |
| Hardware | 1 | 406-BBSJ | PowerStore 100GbE mezzanine pair |
| Hardware | 1 | 565-BBJS | 32Gb FC 4-port IO module pair |
| Hardware | 4 | 407-BCGB | 25GbE optical SFP pair |
| Hardware | 1 | 450-BBBJ | 1800W power supply pair L9 |
| Hardware | 1 | 384-BDZZ | Single drive failure 8+1 |
| Hardware | 1 | 343-BBTN | PowerStore base enclosure install kit |
| Hardware | 1 | 450-AITI | C13 power-cord pair GB1002 250V 10A |
| Software | 1 | 528-BTZK | PowerStore base SW |
| Software | 1 | 611-BBBV | DARE disabled = IC |
| Maintenance | 1 | 709-BDKZ | Parts-only warranty 36 months |
| Maintenance | 1 | 199-BJJN | ProSupport NBD on-site 36 months |
| Maintenance | 1 | 883-BBFM | Custom field deployment |
| PowerStore 24x2.5-inch NVMe expansion enclosure | |||
| Hardware | 1 | 210-BFVE | PowerStore NVMe expansion L9 24x2.5 FLD |
| Hardware | 15 | 400-BRXH | NVMe SED non-FIPS SSD 7.68TB |
| Hardware | 1 | 384-BFBD | Dual drive failure 16+2 |
| Hardware | 1 | 343-BBTM | PowerStore ENS24 ExpKit FLD qty 1 Gen2 |
| Hardware | 1 | 343-BBTL | PowerStore NVMe EXP install kit |
| Hardware | 1 | 450-AITI | C13 power-cord pair GB1002 250V 10A |
| Maintenance | 1 | 709-BDLG | Parts-only warranty 36 months |
| Maintenance | 1 | 199-BJJN | ProSupport NBD on-site 36 months |
| Maintenance | 1 | 883-BBFM | Custom field deployment |
| AppSync for PowerStore | |||
| Software | 1 | 210-BEGM | AppSync for PowerStore |
| Software | 1 | 528-BYHF | AppSync Str Pk for PowerStore = CB |
| Maintenance | 1 | 487-BJQK | ProSupport Mission Critical AppSync SW 36 months |
| Maintenance | 1 | 883-BBFN | No on-site deployment |
Technical Specifications
Quick Answer: Size the RFQ on 36 drives of 7.68TB, 768GB cache, the multi-protocol port mix, and 36 months of ProSupport. Confirm usable capacity against your measured data-reduction profile rather than the 5:1 guarantee alone, since real ratios vary widely by workload and data type.
| Component | Specification |
|---|---|
| Form factor | Dual-controller enterprise storage array |
| System cache | 768GB (384GB per node) |
| Drive configuration | 36x NVMe SED non-FIPS SSD 7.68TB |
| Raw capacity | 276.48TB NVMe flash |
| Front-end connectivity | 4x 25GbE optical + 2x 100GbE mezzanine + 4x 32Gb FC |
| Expansion | PowerStore 24x2.5-inch NVMe expansion enclosure |
| Protocols | Block (iSCSI/FC), file (NFS/SMB), vVols |
| Data reduction | Inline deduplication and compression, 5:1 guarantee |
| Software | PowerStoreOS, AppSync for PowerStore |
| Power | 1800W redundant, Lot 9 compliant |
| Warranty | 36 months ProSupport + NBD on-site |
Application Scenarios
Quick Answer: The 3200T fits entry databases, VMware and VDI consolidation, and unified file plus block workloads where sub-millisecond latency matters. Step up to the 5200T or 9200T when VM or database density outgrows the envelope, and state the workload profile on the RFQ so sizing can be verified.
| Scenario | Why the 3200T fits |
|---|---|
| Mission-critical databases | Sub-millisecond NVMe latency and 32Gb FC for Oracle, SQL Server, and SAP HANA; inline reduction maximizes effective capacity |
| Virtualization & VDI | vVols and Hyper-V support with AppSync VM-consistent snapshots; high IOPS density for thousands of desktops |
| Unified file & block | Simultaneous NFS/SMB and iSCSI/FC eliminates storage silos on one managed platform |
| Hybrid cloud | CloudIQ predictive analytics with native replication and tiering for DR and data mobility |
| Application data protection | AppSync automates consistent snapshots for Oracle, SQL Server, Exchange, and SharePoint with self-service restore |
| Enterprise data center | 1800W redundant power, hot-swap NVMe, and 36-month NBD ProSupport for 24x7 operations |
Sizing Insights
Quick Answer: As an all-NVMe entry array, the 3200T comfortably consolidates 100-300 VMware VMs, 500-1,000 virtual desktops, or 10-20 SQL Server databases with sub-millisecond latency and 450K+ IOPS. Size against your measured data-reduction ratio, and pair the array with dual-path quotes when NAND pricing shortens quote validity.
| Workload | Recommended capacity on one 3200T |
|---|---|
| VMware vSphere (mixed) | 100-300 VMs |
| VDI (virtual desktops) | 500-1,000 desktops |
| SQL Server | 10-20 production databases |
| Oracle Database | 5-10 instances |
| Exchange Server | 2,000-5,000 mailboxes |
AppSync organizes protection through service plans that define snapshot frequency, retention, and replication per application SLA — for example 15-minute snapshots kept 24 hours, hourly kept 30 days, and daily kept a year. Self-service restore lets DBAs recover from the AppSync interface without a storage-team ticket, cutting recovery from hours to minutes. BENQUAN configures service plans and replication targets during deployment.
Frequently Asked Questions
Quick Answer: Before issuing a PO, confirm raw versus usable capacity, the connectivity mix, the number of expansion shelves, which software is included, and the support term. Submit one brief for a free compatibility and delivery risk assessment from a global logistics hub before the configuration is frozen.
This configuration includes 36 NVMe SSDs at 7.68TB each, totaling 276.48TB of raw NVMe storage. With Dell's guaranteed 5:1 data reduction, effective capacity exceeds 1.3PB. It uses 21 drives in the main enclosure and 15 in one 24x2.5-inch expansion enclosure.
The configuration includes a 25GbE optical 4-port card pair, a 100GbE mezzanine pair, and a 32Gb Fibre Channel 4-port IO module pair, plus 4x 25GbE optical SFP pairs, covering iSCSI, NFS, SMB, and Fibre Channel fabrics.
36-month Dell ProSupport with next business day on-site service, plus a 36-month parts-only warranty and Custom Field Deployment for the main unit and expansion enclosure. AppSync includes ProSupport Mission Critical software maintenance for 36 months.
This configuration includes one PowerStore NVMe 24x2.5-inch expansion enclosure providing 15 additional NVMe drive slots, plus the 21 drives in the main enclosure, for a total of 36 NVMe SSDs.
PowerStore Base SW includes PowerStoreOS with inline deduplication, compression, thin provisioning, snapshots, cloning, replication, and QoS. AppSync for PowerStore is included for application-consistent snapshots, and CloudIQ provides AI-driven monitoring.
Entry-level databases (SQL Server, Oracle, MySQL), virtualization and VDI with hundreds of VMs, unified file and block consolidation, and application-centric protection with AppSync. Its all-NVMe architecture delivers sub-millisecond latency at an entry investment level.
Key Takeaway: Lock usable TB, protocol mix and expansion shelves on one brief before CapEx, and keep the 1200T, 5200T or Alletra as a dual path if budget or scale moves. Confirm usable capacity against your own measured reduction ratio rather than the 5:1 guarantee. BENQUAN GLOBAL LIMITED supplies Dell PowerStore 3200T arrays with competitive pricing.