Dell PowerStore 1200T: A Complete Guide to All-NVMe Entry-Level Storage
The transition from hybrid storage arrays to all-NVMe architecture represents one of the most significant performance improvements in enterprise storage history. Dell PowerStore 1200T delivers this all-NVMe advantage at a entry-level price point, making enterprise-grade flash performance accessible to a broader range of organizations and workloads.
What Is All-NVMe Storage?
NVMe (Non-Volatile Memory Express) was designed from the ground up for flash storage, connecting SSDs directly to the PCIe bus for dramatically lower latency and higher queue depths compared to legacy SAS or SATA interfaces. The PowerStore 1200T employs end-to-end NVMe architecture — from drives to controllers to network fabric — eliminating protocol translation bottlenecks entirely and delivering consistent sub-millisecond latency.
Hardware Architecture
The 1200T configuration includes 21 NVMe SSDs at 7.68TB each, delivering 161.28TB of raw NVMe capacity. The dual-controller architecture provides 384GB of system cache (192GB per node) with Intel Xeon Scalable processors and dedicated NVRAM for write acceleration. One 24x2.5 expansion enclosure provides 15 additional drive slots beyond the 21 in the main enclosure, offering flexible capacity growth.
Connectivity and Performance
With 10GbE optical (4-port), 100GbE mezzanine (2-port), and 32Gb Fibre Channel (4-port) connectivity, the PowerStore 1200T integrates into any enterprise fabric. The multi-protocol design supports simultaneous block (iSCSI/FC), file (NFS/SMB), and VMware vVol access from a single storage platform, eliminating the need for separate storage silos for different workload types.
PowerStore 1200T for Entry-Level Virtualization and Database Workloads
Mid-range enterprise environments face a unique challenge: they need the performance and reliability of all-flash storage but must balance cost against capacity requirements. The Dell PowerStore 1200T addresses this sweet spot with a configuration that delivers enterprise NVMe performance at a entry-level investment level.
Virtualization Performance
For VMware and Hyper-V environments, the 1200T provides the IOPS density needed to consolidate hundreds of virtual machines. With 21 NVMe drives and dual active-active controllers, the array delivers consistent low-latency performance even during peak utilization periods. vVols support enables VM-level granularity for storage policies, snapshots, and replication.
Database Consolidation
Multiple SQL Server, Oracle, or MySQL databases can be consolidated on a single PowerStore 1200T without performance contention. The 32Gb Fibre Channel connectivity provides the low-latency path that transactional databases require, while inline deduplication and compression reduce the storage footprint of database files, logs, and backups.
Balanced Design
The 1200T strikes a balance between capacity and cost with 7.68TB NVMe drives — large enough to support substantial datasets while keeping per-drive costs manageable. With Dell's 5:1 data reduction guarantee, the effective capacity of this 161.28TB raw configuration exceeds 1.3PB, making it suitable for organizations that need petabyte-scale effective capacity without the investment required for a flagship deployment.
Deploying AppSync for PowerStore: Application-Centric Data Protection
Data protection in modern enterprise environments has evolved beyond simple snapshot schedules. Applications have specific consistency requirements, recovery point objectives (RPOs), and recovery time objectives (RTOs) that demand intelligent, policy-driven protection. Dell AppSync for PowerStore addresses these requirements with application-aware snapshot management.
How AppSync Works
AppSync integrates directly with enterprise applications to create crash-consistent and application-consistent snapshots. For Oracle databases, AppSync uses Recovery Manager (RMAN) integration to ensure snapshots are transaction-consistent and can be restored without data loss. For SQL Server, it leverages Volume Shadow Copy Service (VSS) for application-aware protection. For VMware, it coordinates with vSphere APIs for VM-consistent snapshots across all datastores.
Service Plan Architecture
AppSync organizes protection through service plans — policy documents that define what to protect, how often to take snapshots, how long to retain them, and where to replicate them. Each plan can include multiple service level agreements (SLAs) with different retention periods. For example, a database might have 15-minute snapshots retained for 24 hours, hourly snapshots retained for 30 days, and daily snapshots retained for one year.
Self-Service Restore
One of AppSync's most valuable features is self-service restore for database administrators. Rather than submitting a restore request to the storage team, DBAs can browse available snapshots through the AppSync interface and initiate a restore directly. This reduces recovery times from hours to minutes and eliminates the bottleneck of relying on storage administrators for routine recovery operations.
Integration at BENQUAN
BENQUAN GLOBAL LIMITED delivers PowerStore 1200T with full AppSync deployment and configuration services. Our certified engineers set up service plans aligned with your application SLAs, configure replication targets, and train your team on self-service restore workflows. Contact our team to discuss your data protection requirements.