Quick Take: Size Palo Alto on Threat Prevention (appmix) and concurrent sessions — not firewall-only Gbps. PA-400 covers branch (~0.8–3 Gbps TP), PA-1400 multigig campus, PA-3400 1U gateways to ~20 Gbps TP, PA-5400 dense 25/100G edges to ~76 Gbps TP. Complete the questionnaire below to prefill an RFQ.

NGFW Sizing Questionnaire

Eight fields. Partial answers are fine — blank items become follow-up questions on the quote.

Quick Answer: The Palo Alto Networks next-generation firewall sizing questionnaire asks for Threat Prevention throughput in gigabits per second, concurrent sessions, interface count, deployment role, subscription bundle, and support term. It suggests a PA series match immediately and prefills the quote request form, so your request for quotation already carries the sizing brief instead of a bare model name.

With App-ID, IPS, AV, WildFire, and logging on — not firewall-only.

Browse SKU list instead

Answers prefill rfq.html?intent=ngfw-sizing. No list prices are shown — we quote after validating the BOM.

PA Series Map (Threat Prevention first)

PAN-OS 12.1 datasheet ballparks — confirm against your software train and traffic mix.

Quick Answer: Use Threat Prevention Gbps and session headroom to pick the series, then lock the exact chassis inside that series. Branch and quiet sites land on PA-400; multigig campus branches on PA-1400; 1U internet gateways on PA-3400 up to ~20 Gbps TP; dense 25/100G edges on PA-5400 from ~32–76 Gbps TP.

PA-400

~0.8–3.0 Gbps TP · up to ~400K sessions

Desktop / fanless branch and retail. PoE and 5G on selected SKUs.

PA-400 specs

PA-1400

~4.5–6.2 Gbps TP · 1U multigig

Campus branch with multigig and higher port density than PA-400.

PA-1400 specs

PA-3400

~7.5–20 Gbps TP · 25G / 100G options

1U internet-gateway class. Step up when PA-1400 TP or I/O runs out.

PA-3400 specs

PA-5400

~32–76 Gbps TP · up to 48M sessions

2U data-center / large gateway with shared dense 25/100G I/O.

PA-5400 specs
Series Threat Prevention (appmix) Typical fit Watch-outs
PA-400 ~0.8–3.0 Gbps Branch, retail, quiet closets Skip if you need multigig or 10G SFP+ density
PA-1400 ~4.5–6.2 Gbps Campus branch, PoE / multigig Gateway TP above ~6 Gbps → PA-3400
PA-3400 ~7.5–20 Gbps 1U internet gateway Session or 100G density needs may force PA-5400
PA-5400 ~32–76 Gbps DC edge, large campus, SP edge Model choice often driven by sessions (5M→48M)

Why Threat Prevention — not firewall Gbps

Most RFQs that fail sizing used the wrong number from the datasheet.

Quick Answer: Firewall (appmix) is the ceiling with App-ID only. Threat Prevention turns on IPS, AV, antispyware, WildFire, file blocking, and logging — the mix real estates run. Quote and size against that column, then derate further if you need heavy TLS decryption.

  • Firewall throughput — useful for marketing comparisons; too optimistic for BOM lock.
  • Threat Prevention — the default sizing column for security-on estates.
  • Sessions — decide PA-5430 vs PA-5440/5445 long before raw Gbps does.
  • Decrypt load — call out expected SSL/TLS inspection volume in the notes field.

Related: Palo Alto SKU list · PA vs Fortinet · SKU Lookup.

Frequently Asked Questions

Quick Answer: Size on Threat Prevention and sessions; move PA-3400 → PA-5400 when TP, 100G density, or session scale exceeds the 1U gateway class. This questionnaire prefills an RFQ — it does not replace optics, HA, and subscription validation on the final BOM.

Threat Prevention (appmix) with security services enabled. Firewall-only Gbps overstates capacity once IPS, AV, WildFire, and logging are on.

When Threat Prevention needs exceed roughly 20 Gbps, when you need dense 25/100G I/O on every chassis, or when concurrent sessions push past the PA-3400 class.

No. It recommends a series and prefills the RFQ. Final SKUs still confirm optics, HA mode, virtual systems, and subscription bundles against your traffic mix.

Submit this questionnaire to open a prefilled RFQ, or browse the Palo Alto SKU list and send a part list.

Already know your Threat Prevention target?

Run the questionnaire above, or skip straight to a sizing RFQ. We return a platform recommendation, subscriptions, support term, competitive pricing, and a delivery window we can hold.

Open NGFW Sizing RFQ

Or call +852-21349834