Quick Take: Object storage costs land in three places, and only one of them is the node: capacity licenses are bought per terabyte, back-end switching needs its own pair of 25GbE fabrics, and support runs for three years. A four-node floor also means the first cluster is bigger than most pilots expect.

What Is Dell ObjectScale X560?

Dell ObjectScale X560 is an enterprise-grade software-defined object storage appliance built on Dell PowerEdge server hardware. It delivers scalable, S3-compatible object storage for modern data workloads including AI data lakes, backup and recovery, and unstructured data management.

Each X560 node combines high-density storage with powerful compute, enabling a scale-out architecture that grows from a few nodes to hundreds. The solution is fully software-defined, with Dell's ObjectScale software providing intelligent data placement, erasure coding, and multi-protocol access.

As an authorized Dell Technologies distributor, BENQUAN GLOBAL LIMITED delivers the complete ObjectScale X560 solution — hardware, software, licensing, and Dell ProSupport — to enterprises worldwide.

Get a Quote

16
Nodes per Cluster
9.2+
PB Raw Capacity
25
GbE Networking
36
Month Warranty

Key Advantages

Quick Answer: Four things sell X560: linear scale-out from four nodes into the hundreds without forklift upgrades, erasure coding plus replication, encryption and immutable object locking, 36 months of Dell ProSupport with four-hour onsite response, and Gen4 capacity licensing bought in 1TB increments so entitlement tracks the data you actually store.

Why enterprises choose Dell ObjectScale X560 for their object storage infrastructure

Scale-Out Architecture

Add nodes linearly to scale capacity and performance. No disruption, no forklift upgrades. Start with 4 nodes and grow to hundreds as your data grows.

Built-in Data Protection

Erasure coding, replication, and encryption protect data at rest and in transit. Immutable object locking for ransomware protection and compliance.

Dell ProSupport

4-hour onsite service included for 36 months. Parts-only warranty with next-business-day replacement. Custom field deployment available.

Capacity Licensing

Pay for what you use with ObjectScale Gen4 capacity licensing. Start with the base license and expand seamlessly as storage needs grow.

Detailed Configuration

Quick Answer: The 16-node build quotes in four blocks: field-ready X560 nodes with ISE storage and paired 25GbE front-end and back-end adapters; per-node software base, Gen4 and encryption licenses plus 9,216 capacity licenses in 1TB increments; two S5248F-ON back-end switches with cable kits; and 36 months of ProSupport.

Complete bill of materials for the 16-node Dell ObjectScale X560 cluster

Category Qty SKU Description
ObjectScale X560 Nodes — 16 Units
Hardware 16 210-BQRC ObjectScale X560 Node — Field-Ready System
Hardware 16 345-BLRJ 24TB ISE (Integrated Storage Enclosure) per node
Hardware 16 540-BGCM Front End 10/25GbE SFP28 Network Adapter
Hardware 16 540-BGCF Back End 10/25GbE SFP28 Network Adapter
Hardware 16 389-FPNC China Energy Label Grade 3, R760XD2 Compliance
ObjectScale Appliance Software — 16 Licenses
Software 16 210-BQRW ObjectScale Software Base License
Software 16 149-BCDV ObjectScale Gen4 Base License — Per Node
Software 16 149-BCDW ObjectScale Data at Rest Encryption License
Software 9,216 149-BCFB ObjectScale Gen4 Capacity License — 1TB Increments
Backend Networking — 2 Switches
Hardware 2 210-BQQZ ObjectScale S5248F-ON Backend Switch
Hardware 2 470-BDNT ObjectScale X560 BackEnd Cable Kit
Accessories & Installation
Hardware 1 210-BQRG ObjectScale Accessories Base Kit
Hardware 1 389-FLCS ObjectScale X560 Cable Label Kit
Unknown 16 470-BBTS Cable Kit 25G 2M Front End
Unknown 16 470-BBTT Cable Kit 25G 2M Back End
Hardware 16 389-FPCH ObjectScale X560 Install Kit
Unknown 32 750-BBHF 25GB SR SFP28 Transceiver Module (QTY2 per node)
Maintenance & Support — 36 Months
Maintenance 19 709-BFLX Parts Only Warranty — 36 Months
Maintenance 19 199-BPZQ ProSupport with 4-Hour Onsite Service — 36 Months
Maintenance 1 883-BBFM Custom Field Deployment Service
Maintenance 16 487-BNJQ ProSupport ObjectScale Software Support — 36 Months

Technical Specifications

Quick Answer: Each node is a 2U R760xd2 with 4th or 5th Generation Intel Xeon Scalable processors, 512GB or more of DDR5, HDD-based ISE storage, and two 25GbE ports on each of the front-end and back-end networks. Clusters run from four to sixty-plus nodes with N+2, N+3 or N+4 erasure coding.

Dell ObjectScale X560 node hardware specifications

Component Specification
Form Factor 2U Rack Mount (PowerEdge R760xd2-based)
Processor Intel Xeon Scalable 4th/5th Gen
Memory 512GB+ DDR5 per node
Storage per Node 24TB ISE (Integrated Storage Enclosure) — HDD-based
Front-End Networking 2x 25GbE SFP28 per node
Back-End Networking 2x 25GbE SFP28 per node
Cluster Networking 2x Dell S5248F-ON 25GbE switches
Software Dell ObjectScale (S3-compatible object storage)
Data Protection Erasure coding (N+2, N+3, N+4), replication, encryption
Protocols S3 (REST API), S3 Select, S3 Object Lock
Cluster Size 4 – 64+ nodes (recommended start: 4-6 nodes)
Warranty 36 months Parts + 4-hour Onsite ProSupport

Application Scenarios

Quick Answer: Six workloads recur: AI data lakes feeding GPU pipelines over S3, immutable backup targets for Veeam, Commvault and PowerProtect, consolidated unstructured data that would otherwise sit in NAS silos, DICOM and genomic archives needing audit trails, 4K and 8K media workflows, and hybrid tiering that parks cold objects in public cloud.

Where Dell ObjectScale X560 delivers maximum value

AI Data Lakes

Store and manage massive volumes of unstructured training data. S3-compatible API enables direct integration with AI pipelines and GPU computing clusters.

Backup & Disaster Recovery

Immutable object storage for backup targets. Integrates with Veeam, Commvault, and Dell PowerProtect for reliable data protection at scale.

Unstructured Data Management

Centralized storage for documents, media, logs, and archives. Scale-out architecture eliminates the complexity of traditional NAS silos.

Medical Imaging & PACS

High-capacity, durable storage for DICOM images, medical records, and genomic data. Compliance-ready with encryption and audit logging.

Media & Entertainment

High-throughput storage for video editing, rendering, and content delivery. Multi-stream 4K/8K workflow support with consistent performance.

Hybrid Cloud Storage

Multi-cloud data mobility with native S3 API. Tier cold data to public cloud while keeping hot data on-premises for low-latency access.

Object Storage Insights

Quick Answer: ObjectScale stores data in a flat namespace with rich metadata instead of a directory tree, which is what lets a cluster scale past NAS limits while erasure coding holds durability. The analysis here compares it against traditional NAS on cost and accessibility, then walks through an AI data lake deployment.

Expert analysis and guidance on enterprise object storage with Dell ObjectScale X560

What Is Dell ObjectScale X560? A Complete Guide to Enterprise Object Storage

Enterprise data is growing faster than ever. Traditional storage architectures — SAN and NAS — were not designed for the scale, durability, and accessibility that modern applications demand. Dell ObjectScale X560 is Dell Technologies' answer to this challenge: a software-defined object storage appliance built on proven PowerEdge hardware.

What Makes ObjectScale Different?

ObjectScale is purpose-built for unstructured data. Unlike traditional file storage that organizes data in a hierarchical directory tree, object storage uses a flat namespace where every piece of data is stored as an object with a unique identifier and rich metadata. This flat architecture enables virtually unlimited scale and makes it ideal for AI data lakes, backup targets, and content repositories.

Hardware Foundation: PowerEdge R760xd2

The X560 node is based on Dell's PowerEdge R760xd2 platform, a 2U 2-node server purpose-configured for object storage workloads. Each node in a 16-node cluster delivers:

  • High-density storage with 24TB ISE enclosures per node
  • Dual 25GbE networking for front-end client access and back-end cluster communication
  • Intel Xeon Scalable processors for data processing and encryption
  • Dell iDRAC for remote management and monitoring

Software Capabilities

The ObjectScale software layer delivers enterprise-grade data services including erasure coding (N+2, N+3, N+4 configurable), data at rest encryption, versioning, object locking for ransomware protection, and multi-tenancy with granular access controls. The software is fully S3-compatible, meaning any application that speaks S3 API can connect directly without modification.

Deployment at BENQUAN GLOBAL LIMITED

BENQUAN GLOBAL LIMITED delivers the complete ObjectScale X560 solution — from hardware procurement and assembly to software configuration, network integration, and ongoing Dell ProSupport. Our team of certified engineers manages the entire deployment lifecycle, ensuring your object storage infrastructure is production-ready from day one.

Dell ObjectScale vs Traditional NAS: Why Scale-Out Object Storage Wins

For decades, Network Attached Storage (NAS) was the default choice for file sharing and unstructured data. But as data volumes exploded into the petabyte range, NAS architectures began revealing critical limitations. Here's a data-driven comparison of Dell ObjectScale X560 versus traditional NAS systems.

Scale Limitations

Traditional NAS appliances are limited by their controller architecture. Most enterprise NAS systems top out at 10-20PB with significant performance degradation as capacity approaches maximum. ObjectScale X560 scales linearly — add nodes and both capacity and performance increase proportionally. A 16-node cluster delivers over 9PB of raw capacity with consistent read/write throughput.

Data Durability and Protection

NAS systems typically rely on RAID for data protection. While RAID works well for block storage, it becomes inefficient at petabyte scale — rebuild times can stretch into days, and dual-drive failures in a RAID group can cause data loss. ObjectScale uses erasure coding, which distributes data and parity across nodes. With N+2 erasure coding, the cluster can tolerate two simultaneous node failures without data loss. Rebuild times are measured in minutes per terabyte, not hours.

Global Data Accessibility

NAS data is accessed via SMB or NFS protocols, which are designed for local area networks. ObjectScale uses the S3 REST API, the industry standard for cloud storage. This means data stored on ObjectScale can be accessed from anywhere — across campus networks, data centers, or public cloud regions — using standard HTTP/HTTPS. Applications built for AWS S3 can be pointed at ObjectScale with zero code changes.

Total Cost of Ownership

When comparing TCO, ObjectScale X560 delivers significant advantages:

  • Lower per-TB cost: Object storage achieves better storage density than NAS at comparable price points
  • Reduced management overhead: No volume management, no LUN configuration, no RAID groups
  • Capacity licensing: Pay for software capacity as you grow, not upfront for the maximum deployment
  • Longer hardware lifecycle: Scale-out architectures allow gradual hardware refreshes rather than forklift upgrades

When to Choose ObjectScale X560

ObjectScale X560 is the best choice when: your data exceeds 500TB, you need S3 compatibility for modern applications, you are building an AI data lake, you require immutable backup storage, or you want to consolidate multiple NAS silos into a single scale-out namespace.

How to Deploy Dell ObjectScale X560 for AI Data Lakes and Analytics

Artificial intelligence and machine learning workloads have unique storage requirements: high throughput for data ingestion, low-latency access for training datasets, massive capacity for raw data and checkpoints, and durable storage for model artifacts. Dell ObjectScale X560 is engineered to meet all of these requirements in a single platform.

Architecture for AI Workloads

A typical AI data lake built on ObjectScale X560 follows a three-tier architecture:

  • Ingestion Tier: Data flows into the ObjectScale cluster from multiple sources — sensors, data lakes, APIs, and manual uploads. The 25GbE front-end network provides up to 50Gbps per node of aggregate ingestion bandwidth. A 16-node cluster can ingest data at rates exceeding 50 TB per hour.
  • Processing Tier: GPU computing clusters (such as NVIDIA H200 or B200) read training data directly from ObjectScale via S3 API. The scale-out architecture ensures that multiple GPU nodes can read different datasets simultaneously without I/O contention.
  • Storage Tier: Processed results, model checkpoints, and training artifacts are written back to ObjectScale for durable storage. Erasure coding ensures data integrity even as datasets grow to multiple petabytes.

Performance Considerations

For AI workloads, ObjectScale X560 delivers the following key performance metrics:

  • Read throughput: Up to 10 GB/s per node for large object reads (configurable with RDMA optimization)
  • Write throughput: Up to 5 GB/s per node for large object writes
  • Object operations: Thousands of PUT/GET operations per second per node for small objects
  • Latency: Sub-millisecond read latency for frequently accessed objects when using NVMe cache tier

Integration with AI Frameworks

ObjectScale's native S3 compatibility means it integrates seamlessly with all major AI frameworks and tools:

  • PyTorch: Use S3 plugin for direct dataset loading during training
  • TensorFlow: TFRecord files stored on ObjectScale can be read in parallel by distributed training workers
  • Apache Spark: Read and write DataFrames directly to ObjectScale for ETL pipelines
  • Kubernetes: Use CSI driver for persistent volume claims backed by ObjectScale storage
  • MLflow: Store experiment artifacts, models, and metrics on ObjectScale

Deployment with BENQUAN GLOBAL LIMITED

BENQUAN GLOBAL LIMITED offers end-to-end deployment services for ObjectScale X560 in AI environments. Our services include: site survey and capacity planning, network architecture design, hardware installation and cabling, ObjectScale software deployment and configuration, integration with existing AI infrastructure, performance tuning and benchmarking, and ongoing support with Dell ProSupport.

Contact our team today to discuss your AI storage requirements and receive a customized quote for Dell ObjectScale X560.

Frequently Asked Questions

Quick Answer: Six answers cover the common ground: four nodes is the minimum and six is the safer N+2 starting point, the S3 API works unmodified including Object Lock and S3 Select, Veeam and Commvault treat it as a native target, and each node needs two 25GbE front-end and two back-end links.

Common questions about Dell ObjectScale X560

Dell ObjectScale X560 supports a minimum of 4 nodes per cluster. For production deployments with erasure coding protection (N+2), we recommend starting with at least 6 nodes to ensure both capacity and data protection guarantees. The 16-node configuration provides 9.2PB+ raw capacity with N+2 erasure coding protection.
Yes, ObjectScale is fully S3-compatible. Applications written for AWS S3 can connect to ObjectScale with zero code changes. It supports the S3 REST API, S3 Select for server-side filtering, S3 Object Lock for immutable storage, and bucket policies for access control.
With N+2 erasure coding on a 16-node cluster (24TB raw per node = 384TB raw per node group; 384TB × 24 node-groups × 16 nodes ÷ 24 per group ≈ 147TB usable). Users can configure N+2, N+3, or N+4 erasure coding depending on their durability and capacity requirements. Contact our team for a detailed capacity planning assessment.
Yes, ObjectScale is an excellent backup target. It supports S3-compatible backup workflows for Veeam Backup & Replication, Commvault, Dell PowerProtect, and other major backup platforms. Immutable object locking provides ransomware protection for backup data. The scale-out architecture ensures backup windows remain consistent as data grows.
The standard configuration includes 36 months of Dell ProSupport with 4-hour onsite service, parts-only warranty, and software support for ObjectScale. Custom field deployment service is also included. Extended warranty and premium support options are available upon request.
Each X560 node requires 2x 25GbE front-end connections for client access and 2x 25GbE back-end connections for cluster-internal communication. The standard configuration includes two Dell S5248F-ON switches for back-end clustering. For front-end connectivity, we recommend existing data center leaf-spine networks with 25GbE or 100GbE uplinks.

Key Takeaway: Size the license pool to year-three data rather than day-one usable capacity, start at six nodes if you want N+2 rebuild headroom, and keep the back-end switch pair inside the same purchase order. BENQUAN GLOBAL LIMITED supplies Dell ObjectScale X560 nodes and ProSupport with competitive pricing.

Is your ObjectScale quote missing licenses or switching?

Object storage cost sits in three places, and the node is only one of them. Click below for a free compatibility and delivery risk assessment: per-terabyte capacity license pool sized to year-three data, the back-end 25GbE fabric pair, the four-node floor, and support years.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk