Quick Take: The TS4300 is where a 3-2-1 backup plan gets its offline copy. A 3555-L3A base module accepts 3555-E3A expansion frames and carries six LTO-9 Fibre Channel drives, so 18TB cartridges and 400MB/s streams scale together as retention grows instead of forcing a forklift replacement.

Overview

Quick Answer: The TS4300 is IBM's modular LTO-9 tape library for backup, archive and compliance retention. A 3555-L3A base module scales with 3555-E3A expansion frames and up to six half-height Fibre Channel drives, so capacity and streaming bandwidth grow together as retention requirements expand.

The IBM TS4300 Tape Library delivers cost-effective, scalable data protection for enterprise backup, archive, and long-term retention requirements. Built on proven LTO-9 technology, the TS4300 combines high capacity, reliability, and energy efficiency in a compact, modular design that grows with your data.

This configuration features a base module with expansion capability, supporting up to 6 LTO-9 Fibre Channel drives for high-performance parallel data transfer. The modular architecture allows organizations to start small and scale capacity and performance as needs evolve, making it ideal for mid-sized enterprises and departmental deployments.

Why Tape Storage Matters

Quick Answer: Tape is the only tier that leaves the network entirely: a cartridge on a shelf cannot be encrypted by ransomware or deleted by a compromised account. LTO-9 media holds data for 30 years, draws zero power offline, and costs less per terabyte than disk or cloud retention.

In an era of ransomware, data breaches, and exponential data growth, tape storage provides a critical air-gapped layer of protection. Unlike disk or cloud storage, tape cartridges can be physically removed from the network, creating an immutable backup that cannot be encrypted or deleted by malicious actors. The TS4300 offers:

  • Ransomware Protection: Air-gapped offline storage prevents unauthorized access and encryption attacks
  • Long-Term Retention: 30-year cartridge lifespan meets compliance and archival requirements
  • Cost Efficiency: Lowest cost per TB for long-term data retention compared to disk or cloud
  • Energy Savings: Tape consumes zero power when stored offline, reducing operational costs
  • Data Portability: Physical cartridges enable secure offsite storage and disaster recovery

Key Features

Quick Answer: Each LTO-9 cartridge stores 18TB native, 45TB compressed, and every drive streams 400MB/s with AES 256-bit encryption handled in hardware. Six drives, 16Gb Fibre Channel attachment and path failover keep parallel backup jobs moving, while redundant power and hot-swap parts hold the library in production.

LTO-9 Technology

Native 18TB capacity per cartridge (45TB compressed), 400MB/s native transfer rate. Hardware-based AES 256-bit encryption protects data at rest.

Modular Scalability

Start with base module and expand capacity with additional frames. Support for up to 6 drives enables parallel backup streams and faster restore operations.

Fibre Channel Connectivity

16Gb/s Fibre Channel drives deliver high-speed data transfer with low CPU overhead. Includes path failover for enhanced availability.

Enterprise Reliability

Redundant power supplies, hot-swappable components, and proven IBM engineering ensure continuous operation and minimal downtime.

Compact Footprint

Rack-mount design optimizes data center space. Modular expansion allows capacity growth without replacing existing infrastructure.

Broad Platform Support

Compatible with Windows, Linux, and other enterprise operating systems. Works with leading backup software including Veeam, Veritas, IBM Spectrum Protect.

Configuration Highlights

Quick Answer: This build combines a 3555-L3A base module with a 3555-E3A expansion frame and six AGLA LTO-9 half-height Fibre Channel drives. Six 25-meter OM3 LC patch cables, redundant power supplies with PDU cords, a 19-inch rack kit, path failover, drive wrap tool and cleaning cartridge are included.

Component Specification
Base Module IBM TS4300 Tape Base Module (3555-L3A) with GEN-3 architecture
Expansion Module TS4300 Tape Expansion Module (3555-E3A) for additional capacity
Tape Drives 6x LTO-9 Half-Height Fibre Channel drives (AGLA)
Connectivity 6x 25-meter OM3 fiber cables (LC connectors)
Power Redundant power supplies with rack-to-PDU line cords
Mounting Rack mount kit included for standard 19-inch racks
Features Path failover, drive wrap tool, cleaning cartridge

Use Cases

Quick Answer: Typical roles are the offsite copy in a 3-2-1 backup design, multi-year compliance archives in healthcare, finance and legal, master and raw footage retention for broadcast facilities, and research datasets kept for reproducibility. WORM cartridges make each of those archives tamper-evident, and six drives let several servers stream simultaneously.

Backup and Disaster Recovery

The TS4300 serves as the final tier in a 3-2-1 backup strategy: three copies of data, on two different media types, with one copy offsite. For enterprise server environments, pair the TS4300 with IBM Power S1024 for a complete data protection solution. Tape provides the air-gapped offsite copy that protects against ransomware, site disasters, and cloud outages. The TS4300 complements primary storage arrays like Huawei Dorado 8000 V6 by providing cost-effective air-gapped backup. With 6 LTO-9 drives, the system can back up multiple servers simultaneously, reducing backup windows and meeting aggressive recovery time objectives (RTOs).

Long-Term Archive and Compliance

Organizations in healthcare, finance, government, and legal sectors face strict data retention mandates. Security logs from Palo Alto PA-5400 firewalls can be archived to tape for compliance and forensic analysis. The TS4300 provides cost-effective storage for records that must be retained for years or decades. Organizations using Lenovo ThinkSystem DE6600F can leverage the TS4300 for long-term retention at a fraction of the cost of disk arrays. LTO-9 cartridges offer 30-year shelf life and WORM (Write Once Read Many) capability for tamper-proof compliance archives. The system's capacity scales to petabytes, accommodating growing archive requirements without forklift upgrades.

Media and Entertainment Workflows

Video production, broadcast, and post-production facilities generate massive volumes of high-resolution content. The TS4300 archives completed projects, raw footage, and master files at a fraction of the cost of disk arrays. Fast Fibre Channel connectivity enables efficient ingest and restore of large media files. Physical cartridges can be shipped to remote facilities or stored in vaults for long-term preservation.

Research and Scientific Data

Universities, laboratories, and research institutions accumulate terabytes of experimental data, simulations, and imaging files. The TS4300 provides affordable long-term storage for datasets that are infrequently accessed but must be retained for reproducibility and future analysis. Tape's energy-free offline storage reduces the environmental footprint of large-scale data retention. Network configurations from Huawei CloudEngine switches should also be backed up regularly to the TS4300 for disaster recovery.

Technical Specifications

Quick Answer: LTO-9 Ultrium half-height drives write 18TB native per cartridge (45TB at 2.5:1) at 400MB/s each, or 2.4GB/s across six drives over 16Gb Fibre Channel. Encryption is AES 256-bit in hardware, media life reaches 30 years, and each 5U module fits standard racks at 10-35°C.

Specification Details
Drive Technology LTO-9 Ultrium Half-Height Fibre Channel
Native Capacity per Cartridge 18TB (45TB compressed at 2.5:1 ratio)
Native Transfer Rate 400MB/s per drive (up to 2.4GB/s with 6 drives)
Interface 16Gb/s Fibre Channel (FC-16)
Encryption Hardware-based AES 256-bit encryption
Cartridge Lifespan 30 years (when stored properly)
MTBF (Mean Time Between Failures) 250,000 hours (drive), 500,000 hours (library)
Power Supply Redundant hot-swappable power supplies
Operating Temperature 10°C to 35°C (50°F to 95°F)
Humidity 20% to 80% non-condensing
Rack Space Base module: 5U, Expansion module: 5U
Supported Operating Systems Windows Server, Red Hat Enterprise Linux, SUSE Linux, AIX, IBM i

Deployment Considerations

Quick Answer: Size drives from the backup window, not the capacity: 10TB in eight hours needs two drives at 400MB/s, plus headroom for growth. Path failover wants dual Fibre Channel connections per drive, OM3 runs stay inside 300 meters at 16Gb, and cartridge rotation needs an offsite schedule.

Pre-Sales Engineering Perspective

When designing a TS4300 solution, assess the customer's backup window, data change rate, and retention policies. Calculate required capacity by multiplying daily full backup size by retention period, then add incremental backup storage. Size the number of drives based on backup window: if 10TB must be backed up in 8 hours, you need at least 2 drives (10TB ÷ 8 hours ÷ 400MB/s ≈ 1.8 drives). Always include headroom for growth and performance spikes.

Evaluate the existing SAN infrastructure to ensure sufficient Fibre Channel switch ports and bandwidth. The TS4300's path failover feature requires dual FC connections per drive for high availability. Plan cable routing and verify OM3 fiber length limits (300 meters at 16Gb/s). For multi-site deployments, consider cartridge rotation schedules and offsite storage logistics.

End-User Perspective

Operators will appreciate the TS4300's straightforward management interface and automated cartridge handling. The system's barcode reader tracks cartridge inventory and usage, reducing manual record-keeping. Cleaning cartridges are included to maintain drive performance; the library prompts for cleaning based on usage thresholds.

Plan for regular cartridge rotation to offsite storage. Establish a labeling convention and tracking system to locate specific backups quickly during restores. Test restore procedures quarterly to verify data integrity and operator proficiency. Budget for annual maintenance contracts to ensure firmware updates and hardware support.

Integration with Backup Software

The TS4300 integrates seamlessly with enterprise backup applications. Configure the backup software to recognize the library's media changer and drive inventory. Enable hardware encryption in the backup software to leverage the drives' AES acceleration. Set up media pools and retention policies to automate cartridge lifecycle management.

For Veeam environments, configure the TS4300 as a tape library in the Backup Infrastructure. Create tape jobs that write to the library after disk-based backups complete. For IBM Spectrum Protect, define device classes and storage pools that map to the library's drives and cartridge slots. Consult the backup software's tape library compatibility matrix to verify supported firmware versions.

Why Choose BENQUAN GLOBAL

Quick Answer: Delivery covers the whole lifecycle: right-sizing from your backup windows and retention policy, SAN and workflow design, factory-trained installation and cabling, backup software integration with end-to-end restore validation, operator training with runbooks, then maintenance contracts and firmware updates once the library is live.

As an authorized solutions provider, BENQUAN GLOBAL delivers end-to-end IBM TS4300 implementations tailored to your data protection requirements. Our team provides:

  • Needs Assessment: We analyze your backup windows, retention policies, and growth projections to right-size the configuration
  • Design and Integration: Our engineers design the SAN connectivity, backup workflows, and disaster recovery procedures
  • Professional Installation: Factory-trained technicians rack, cable, and configure the library for immediate production use
  • Software Configuration: We integrate the TS4300 with your backup software and validate end-to-end data protection
  • Training and Documentation: Comprehensive operator training and runbooks ensure your team can manage daily operations
  • Ongoing Support: Maintenance contracts, firmware updates, and technical support keep your system running optimally

Our experience spans diverse industries and use cases, from small departmental backups to multi-petabyte archives. We understand the nuances of tape technology and can guide you through media management, offsite rotation, and long-term data preservation best practices.

Next Steps

Quick Answer: Bring the daily backup volume, retention period and backup software, and we return a drive count, cartridge quantity and expansion plan sized to the window. Configuration, installation and software integration can be quoted together so the library reaches production without a separate services engagement.

Protect your organization's data with the proven reliability and cost efficiency of IBM TS4300 tape storage. Contact BENQUAN GLOBAL today to discuss your backup and archive requirements. Our team will work with you to design a solution that meets your capacity, performance, and budget objectives.

Request a Detailed Quote

For technical questions or to schedule a consultation, reach out to our solutions team. We're here to help you build a resilient data protection strategy that safeguards your critical information for years to come.

Frequently Asked Questions

Quick Answer: Buy TS4300 from the datasheet by freezing 3555-L3A / 3555-E3A frames, up to six LTO-9 Fibre Channel drives, 18 TB native cartridges, and Hardware Maintenance years. Size drives from the backup window — 10 TB in 8 hours needs about two streams. Request worldwide shipping on every frame and media line.

Freeze the 3555-L3A base module, 3555-E3A expansion frames, LTO-9 drive count, media, and Hardware Maintenance years, then request worldwide shipping. Cite 18 TB native per LTO-9 cartridge and drive count from the backup window, not a slot sticker.

This configuration path supports up to six half-height Fibre Channel LTO-9 drives. Size drive count from the backup window — 10 TB in 8 hours needs about two 400 MB/s streams plus headroom.

IBM publishes TS4300 on ibm.com. This page is the RFQ table for 3555-L3A / 3555-E3A and LTO-9. Confirm firmware and WORM media on the quote.

Key Takeaway: Buy tape for the copy that lives off the network, then size drive count by backup window rather than capacity — six drives keep several servers streaming in parallel. Specify WORM media where the archive must be tamper-evident. BENQUAN GLOBAL LIMITED supplies IBM TS4300 tape libraries with competitive pricing.

Ready to Quote IBM TS4300 Tape Library?

Share your BOM or requirements. BENQUAN validates part numbers and stock options.

Request a Quote

Or call +852-21349834 · info@benquan.hk