System Configuration
Quick Answer: This build pairs the 24 Power10 cores and 1TB of DDR5 with four 800GB NVMe U.2 drives on two eight-bay backplanes, giving sixteen bays for later growth. Front-end I/O is four 25GbE RoCE ports and four 32Gb Fibre Channel ports, with an LTO-9 tape drive for retention.
Compute Platform
| Component | Specification |
|---|---|
| Server Model | IBM Power S1024 (9105-42A) |
| Processor | 2× 12-core Power10 (3.40-4.0 GHz typical/max) |
| Total Cores | 24 physical cores |
| Memory | 1024GB (8× 128GB DDR5 DIMMs, 3200 MHz) |
| Form Factor | 2U rack-mount |
Storage Subsystem
| Component | Specification |
|---|---|
| Internal Storage | 4× 800GB NVMe U.2 SSD (4K sector, AIX/Linux optimized) |
| Storage Backplane | 2× 8-bay NVMe U.2 backplanes (16 total bays) |
| System Disk | Mirrored configuration for OS resilience |
| Backup | LTO-9 SAS tape drive in 7226-1U3 enclosure |
Network Connectivity
| Component | Specification |
|---|---|
| Ethernet | 2× PCIe4 dual-port 25/10/1 GbE RoCE SFP28 adapters |
| Fibre Channel | 2× PCIe4 dual-port 32Gb optical FC adapters |
| Optical Transceivers | 4× 25GbE SFP28 modules |
Virtualization & Operating Systems
| Component | Specification |
|---|---|
| Hypervisor | PowerVM V4 with 24-core activation |
| Primary OS | AIX (1 partition) |
| Secondary OS | IBM i 7.3/7.4/7.5/7.6 (2 partitions, 7-core license) |
| Management | IBM Power HMC Virtual Appliance for x86 V11 |
Overview
Quick Answer: The Power S1024 is a 2U Power10 server, machine type 9105-42A, configured here with two 12-core processors, 24 activated cores, and 1TB of DDR5 memory across eight 128GB DIMMs. It targets AIX and IBM i estates that need partition isolation without moving to a scale-out x86 farm.
The IBM Power S1024 (model 9105-42A) represents the next generation of enterprise computing, built on the revolutionary Power10 processor architecture. This solution delivers exceptional performance, reliability, and flexibility for organizations running mission-critical AIX and IBM i workloads.
Designed for mid-sized enterprises and departmental deployments, the Power S1024 combines dual 12-core Power10 processors with 1TB of high-speed DDR5 memory and enterprise-class NVMe storage. The integrated PowerVM virtualization platform enables efficient resource utilization and workload consolidation, while maintaining the security and isolation required for production environments.
Power10 Architecture Advantages
Quick Answer: Power10 earns its place through features x86 does not match one-for-one: an on-chip Matrix Math Accelerator for inference, memory encryption that costs no measurable performance, predictive failure analysis with dynamic core deallocation, and PCIe Gen5 lanes. Peak clock reaches 4.0 GHz on these 12-core parts.
The Power10 processor represents a significant leap forward in enterprise computing technology. Each 12-core chip delivers up to 4.0 GHz maximum frequency with advanced features designed specifically for business-critical workloads:
- Matrix Math Accelerator (MMA): Hardware acceleration for AI inference workloads, delivering up to 10× faster performance for machine learning models compared to previous generations
- Transparent Memory Encryption: Zero-performance-overhead encryption of all memory contents, protecting data at rest in DRAM without application changes
- Enhanced RAS Features: Advanced reliability, availability, and serviceability capabilities including predictive failure analysis and dynamic processor deallocation
- PCIe Gen5 Support: Double the I/O bandwidth of previous generations, enabling faster storage and network connectivity
For organizations evaluating modern infrastructure, the Power10 architecture offers a compelling alternative to x86 platforms for workloads requiring maximum uptime and data integrity. Similar to how enterprise storage systems prioritize reliability over raw capacity, Power Systems prioritize application availability over benchmark scores.
PowerVM Virtualization Strategy
Quick Answer: PowerVM V4 ships with all 24 cores activated, so partitions can be sized in tenth-of-a-core increments rather than whole sockets. Live Partition Mobility moves running workloads off a frame for maintenance, and shared processor pools let development partitions borrow idle capacity without breaking production isolation.
This configuration includes PowerVM V4 with 24-core activation, enabling comprehensive virtualization across the entire system. PowerVM provides enterprise-grade features that go beyond basic hypervisor functionality:
Workload Consolidation
Run multiple AIX and IBM i environments on a single physical server, each with dedicated CPU, memory, and I/O resources. The 24-core license allows flexible partition sizing—for example, allocate 8 cores to a production IBM i ERP system, 6 cores to an AIX database server, 4 cores to a development environment, and reserve the remaining capacity for future growth.
Live Partition Mobility
Move running partitions between physical servers without downtime, enabling non-disruptive hardware maintenance and dynamic load balancing. This capability is particularly valuable for organizations with multiple Power Systems, allowing workload migration during planned maintenance windows or in response to changing business priorities.
Shared Processor Pools
Implement micro-partitioning to allocate fractional processor resources (as small as 0.1 core) to individual workloads. This granular control maximizes hardware utilization while maintaining performance isolation between partitions—critical for mixed production and development environments.
Organizations implementing virtualization strategies across their infrastructure often combine Power Systems for core business applications with shared storage platforms and high-performance network fabrics to create a fully integrated, software-defined datacenter.
AIX and IBM i: Multi-OS Flexibility
Quick Answer: One frame runs both stacks. The AIX partition carries databases and middleware with WPAR isolation and Dynamic LPAR resizing, while two IBM i partitions hold 7-core licensing across releases 7.3 through 7.6. BRMS ships on a five-year subscription and writes to the LTO-9 drive at 18TB native per cartridge.
This solution supports both AIX and IBM i operating systems, providing flexibility for organizations with diverse application portfolios:
AIX: Enterprise UNIX Platform
AIX remains the preferred platform for mission-critical UNIX workloads, offering advanced features like Workload Partitions (WPARs) for application isolation, Dynamic LPAR for resource reallocation without reboot, and integrated security frameworks. The primary AIX partition in this configuration serves as the foundation for database servers, application servers, and middleware platforms.
IBM i: Integrated Business Platform
IBM i (formerly AS/400, iSeries) provides a unique integrated platform where the operating system, database, and security are tightly coupled. This configuration includes two IBM i partitions with 7-core licensing, supporting IBM i versions 7.3 through 7.6. The included Rational Development Studio enables modern application development with ILE compilers, heritage compilers, and application development toolsets.
BRMS Backup and Recovery
The Backup, Recovery and Media Services (BRMS) software provides comprehensive data protection for IBM i environments, with 5-year subscription licensing. The integrated LTO-9 tape drive offers up to 18TB native capacity per cartridge, ensuring long-term data retention and disaster recovery capabilities.
Storage and Data Protection
Quick Answer: Four 800GB NVMe U.2 drives handle transactional latency today, and the two eight-bay backplanes leave room for sixteen drives — up to 61TB if you fill them with 3.84TB units. AIX LVM mirrors the system disk, and the LTO-9 drive writes 400MB/s for nightly offline copies.
The storage subsystem balances performance, capacity, and resilience for enterprise workloads:
NVMe Performance
Four 800GB NVMe U.2 SSDs deliver consistent low-latency access for database workloads and transactional applications. The 4K sector format optimizes performance for AIX and Linux environments, while the dual 8-bay backplanes provide expansion capacity up to 16 drives (12.8TB with 800GB drives, or up to 61TB with 3.84TB drives).
System Disk Mirroring
The mirrored system disk configuration ensures operating system availability even in the event of a drive failure. AIX Logical Volume Manager (LVM) automatically synchronizes writes across both disks, providing transparent failover without manual intervention.
Tape Backup Strategy
The LTO-9 SAS tape drive in the 7226-1U3 enclosure provides offline backup capability for compliance and disaster recovery requirements. LTO-9 offers 18TB native capacity (45TB compressed) and 400MB/s native transfer rate, making it suitable for nightly full backups of multi-terabyte databases.
For organizations requiring higher storage capacity or advanced features like snapshots and replication, this server can be paired with external storage arrays such as all-flash storage systems via the dual 32Gb Fibre Channel adapters.
Network Architecture
Quick Answer: Four adapters cover three separate paths. The 25GbE RoCE pair carries storage and backup traffic while offloading packet processing from the cores, the 32Gb Fibre Channel pair reaches the SAN with multipath I/O and supports IBM i SAN boot, and management stays on its own HMC network.
The network configuration provides multiple connectivity options for different use cases:
25GbE RoCE for Storage Traffic
The dual-port 25GbE RoCE (RDMA over Converged Ethernet) adapters enable high-throughput, low-latency connectivity to NVMe-oF storage or backup targets. RoCE offloads network processing from the CPU, reducing overhead for storage-intensive workloads.
32Gb Fibre Channel for SAN Connectivity
The dual-port 32Gb FC adapters provide connectivity to traditional Fibre Channel SANs, supporting multipath I/O for redundancy and load balancing. This is particularly important for IBM i environments where SAN boot and shared storage are common deployment patterns.
Network Redundancy
With four independent network adapters (two Ethernet, two FC), this configuration supports comprehensive redundancy strategies. Implement active-active bonding for Ethernet traffic, multipath I/O for SAN access, and separate management networks for HMC connectivity—all without requiring additional adapter cards.
Use Cases and Deployment Scenarios
Quick Answer: Four deployments dominate quotes for this configuration: consolidating several IBM i ERP frames onto one machine, hosting Oracle or Db2 on an AIX partition where NVMe latency matters for redo logs, bridging on-premises IBM i to cloud services over 25GbE, and carving lightweight development partitions from spare cores.
ERP and Business Application Consolidation
Consolidate multiple physical servers running IBM i-based ERP systems (such as JD Edwards, Infor, or custom RPG applications) onto a single Power S1024. Use PowerVM to create isolated partitions for production, test, and development environments, reducing hardware footprint and simplifying management.
AIX Database Server
Deploy Oracle Database, IBM Db2, or SAP HANA on AIX partitions, leveraging the Power10 processor's large cache hierarchy and memory bandwidth for OLTP workloads. The NVMe storage provides the low-latency access required for database redo logs and temp tablespaces.
Hybrid Cloud Gateway
Use the Power S1024 as a gateway between on-premises IBM i applications and cloud services. The 25GbE connectivity provides sufficient bandwidth for hybrid cloud scenarios, while PowerVM enables secure isolation between production workloads and cloud integration middleware.
Development and Test Infrastructure
Create multiple lightweight partitions for application development and testing, each with dedicated resources but sharing the underlying hardware. The PowerVM micro-partitioning capability allows efficient resource allocation—for example, 10 development partitions each with 0.5 cores and 16GB RAM.
Organizations building comprehensive IT infrastructure often combine Power Systems with enterprise security platforms to protect critical business applications and ensure compliance with data protection regulations.
Management and Monitoring
Quick Answer: Management runs through the HMC virtual appliance hosted on x86 rather than a dedicated hardware console, which removes one appliance from the rack. From it you create and resize partitions live, push firmware, reach partition consoles remotely, and export metrics to existing tooling over SNMP or REST.
This solution includes the IBM Power HMC (Hardware Management Console) Virtual Appliance for x86, which runs as a virtual machine on standard x86 hardware. The HMC provides comprehensive management capabilities:
- Partition Management: Create, modify, and delete logical partitions through a web-based interface
- Resource Allocation: Dynamically adjust CPU, memory, and I/O resources without downtime
- Performance Monitoring: Real-time and historical performance data for capacity planning
- Firmware Updates: Centralized firmware management and update deployment
- Remote Console Access: Virtual terminal access to partition consoles for troubleshooting
The HMC integrates with enterprise monitoring platforms through SNMP and REST APIs, enabling integration with existing IT service management workflows.
Why Choose BENQUAN GLOBAL for Your Power Systems Deployment
Quick Answer: Engagement covers the whole life of the frame: partition layout and storage allocation designed before the order, certified engineers installing hardware and PowerVM on site, migration of AIX and IBM i workloads off older Power frames, administrator training, then firmware and capacity planning after handover.
As a systems integrator specializing in enterprise IT infrastructure, BENQUAN GLOBAL brings deep expertise in Power Systems architecture, deployment, and optimization:
- Pre-Deployment Planning: We work with your team to design partition layouts, storage allocation, and network connectivity that align with your application requirements and growth projections
- Professional Installation: Our certified engineers handle hardware installation, PowerVM configuration, and operating system deployment, ensuring best practices are followed at every step
- Migration Services: Migrate existing AIX and IBM i workloads from older Power Systems or competitive platforms with minimal downtime using proven migration methodologies
- Knowledge Transfer: Comprehensive training for your IT staff on PowerVM administration, partition management, and troubleshooting techniques
- Ongoing Support: Post-deployment support including performance tuning, capacity planning, and firmware update management
Our experience spans multiple industries including financial services, manufacturing, healthcare, and government, giving us insight into industry-specific requirements and compliance considerations. We understand that Power Systems are not just servers—they are the foundation of business-critical operations that cannot afford downtime.
Frequently Asked Questions
Quick Answer: This is a 2U Power10 server (machine type 9105-42A) with 24 activated cores and 1TB of DDR5, running one AIX and two IBM i partitions. Core activations, IBM i licenses and BRMS are priced separately from the hardware, so confirm each line on the BOM before you approve the quote.
What is IBM Power S1024 machine type 9105-42A?
The Power S1024 is a 2U Power10 rack server sold as machine type 9105-42A. This quoted build has two 12-core processors (24 physical cores, all activated), 1TB of DDR5 memory and NVMe storage.
Which operating systems does this IBM Power S1024 configuration run?
It runs AIX in one partition and IBM i (7.3, 7.4, 7.5 or 7.6) in two partitions with a 7-core license, under PowerVM V4 with 24-core activation.
How much storage and I/O does this build include?
Four 800GB NVMe U.2 drives sit on two 8-bay backplanes (16 bays in total, 12 left empty), with two dual-port 25GbE RoCE adapters, two dual-port 32Gb Fibre Channel adapters and an LTO-9 SAS tape drive.
How is the Power S1024 managed?
Through the IBM Power HMC virtual appliance for x86 (V11), which runs as a virtual machine on standard x86 hardware and exposes SNMP and REST APIs.
Are core activations and IBM i licenses included in the hardware price?
No. Core activations, IBM i partition licenses and BRMS are separately priced lines, so confirm each one on the BOM before approval. Request a quote with your partition plan.
Key Takeaway: Specify this S1024 as a consolidation target rather than a like-for-like replacement: size activated cores against the IBM i partitions you actually license, leave the twelve empty NVMe bays for growth, and confirm HMC hosting before delivery. BENQUAN GLOBAL LIMITED supplies IBM Power S1024 systems with competitive pricing and worldwide shipping.