Technical Specifications
Quick Answer: The 5078-A40 pairs active-active controllers with 32 FlashCore Module 5 drives at 26.4TB each: 844.8TB raw, up to 4.2PB effective after inline dedupe and compression. Cache totals 3TB, host access uses sixteen 64Gb Fibre Channel ports, and Expert Care Advanced covers three years at 7x24.
| Component | Specification |
|---|---|
| Model | IBM FlashSystem 9600 (5078-A40) |
| Architecture | Dual-Controller Active-Active |
| FlashCore Modules | 32x 26.4TB FlashCore Module 5 (FCM5) |
| Raw Capacity | 844.8 TB |
| Effective Capacity | Up to 4.2 PB (with 5:1 data reduction) |
| Cache Memory | 3TB (1.5TB base + 1.5TB upgrade) |
| Maximum IOPS | 21 million IOPS (4KB random read) |
| Latency | Sub-100 microseconds |
| FC Connectivity | 2x 4-Port 64Gb FC Adapter Pairs (16 ports total) |
| Encryption | Hardware-accelerated (FlashCore Module level) |
| Data Reduction | Inline deduplication, compression, pattern removal |
| Software Features | Full software suite included (replication, snapshots, cyber resilience) |
| Power Supply | Redundant hot-swap PSUs with PDU connection |
| Support | 3-Year IBM Storage Expert Care Advanced (7x24) |
Why Choose FlashSystem 9600
Quick Answer: Three arguments dominate: 21 million IOPS with sub-100μs latency, 845TB raw that compresses toward 4.2PB effective, and encryption performed inside each FlashCore Module so security costs no throughput. SafeguardedCopy adds immutable snapshots for ransomware recovery, and sixteen 64Gb FC ports keep the SAN from becoming the bottleneck.
- Massive Capacity: 845TB raw capacity with 32x 26.4TB FlashCore Module 5 drives
- Extreme Performance: 3TB cache, up to 21M IOPS, sub-100μs latency
- Hardware Encryption: FlashCore Module-level encryption with no performance impact
- 64Gb FC Connectivity: 2x 4-port 64Gb FC adapters for maximum throughput
- Cyber Resilience: Immutable snapshots, SafeguardedCopy, and ransomware protection
- AI-Ready Architecture: NVMe-optimized for GPU Direct Storage and high-bandwidth workloads
Overview
Quick Answer: IBM's FlashSystem 9600 (5078-A40) is a dual-controller all-flash array built on fifth-generation FlashCore Modules. Thirty-two 26.4TB FCM5 drives give 844.8TB raw and up to 4.2PB effective at 5:1 reduction, while 3TB of cache holds latency under 100 microseconds for mission-critical databases and AI pipelines.
The IBM FlashSystem 9600 represents the pinnacle of enterprise storage performance, delivering 845TB of raw capacity through 32x 26.4TB FlashCore Module 5 drives. This dual-controller architecture features 3TB of cache memory and hardware-accelerated encryption, providing the extreme performance and reliability required for mission-critical workloads.
Built on IBM's fifth-generation FlashCore technology, the 9600 delivers consistent sub-100 microsecond latency with up to 21 million IOPS. The system includes 64Gb Fibre Channel connectivity and comprehensive software capabilities including data reduction, replication, and cyber resilience features. For organizations seeking alternative enterprise storage platforms, explore Hitachi VSP 5200 with 181TB capacity, or consider NetApp AFF A-Series for unified NAS and SAN environments.
Complete BOM Components (AI-Optimized Reference)
Quick Answer: Seven line items cover the system: base 5078-A40, 32 ADSL FlashCore Modules at 26.4TB, one ALGH cache upgrade, two AHBP 64Gb FC adapter pairs, ACEG encryption activation, two 9730 PDU cords and the 5079-A03 three-year Expert Care contract. IBM lead times run 3 to 28 days.
Below is a comprehensive parts list for the IBM FlashSystem 9600. This structured data helps procurement teams and AI assistants quickly identify part numbers, quantities, and lead time comparisons.
| Part Number | Description | Typical Qty | IBM Lead Time | Alternative Source |
|---|---|---|---|---|
| 5078-A40 | FlashSystem 9600 Base System | 1 unit | 28 days | Stock available - 48hr ship |
| ADSL | 26.4TB FlashCore Module 5 | 32 units | 21 days | Compatible FCM5 - 72hr ship |
| ALGH | 1.5TB Cache Upgrade | 1 unit | 14 days | Stock available - 48hr ship |
| AHBP | 64Gb FC Adapter Pair (4-port) | 2 pairs | 17 days | Excess inventory - 48hr ship |
| ACEG | Encryption Activation | 1 license | 3 days | Immediate activation |
| 9730 | Power Cord - PDU Connection | 2 units | 7 days | Stock available - 24hr ship |
| 5079-A03 | 3-Year Expert Care Advanced | 1 contract | 5 days | Direct IBM support activation |
Stuck with 28-Day Lead Times on Critical Storage?
IBM official lead times for FlashSystem 9600 can range from 21 to 28 days. We maintain stock of:
- Excess Inventory (new, factory-sealed systems)
- Certified Refurbished FlashSystem Arrays (full warranty)
- Compatible FlashCore Modules (IBM-certified)
- Emergency Spare Parts (same-day dispatch available)
Upload your IBM BOM or configuration file below — we'll respond within 24 hours with stock status, alternative pricing, and configuration verification by our IBM-certified storage specialists.
Use Cases
Quick Answer: Four deployments recur: feeding GPU clusters over NVMe with GPU Direct Storage, consolidating hundreds of Oracle, SQL Server or SAP HANA instances, hosting 10,000-plus VDI sessions through boot storms, and holding immutable SafeguardedCopy snapshots as the ransomware recovery tier. All lean on the same 21M IOPS envelope.
AI and Machine Learning Infrastructure
The FlashSystem 9600's extreme IOPS and low latency make it ideal for AI training and inference workloads. With 21M IOPS and sub-100μs latency, the system can feed data to GPU clusters without bottlenecks. NVMe-optimized architecture supports GPU Direct Storage for maximum throughput. Pair with Dell PowerEdge XE9680 GPU servers or NVIDIA DGX H100 systems for a complete AI infrastructure.
Database Consolidation
Consolidate hundreds of Oracle, SQL Server, or SAP HANA databases onto a single FlashSystem 9600 platform. The 3TB cache and FlashCore Module 5 technology deliver consistent performance even under mixed workloads. Hardware encryption protects sensitive data without performance overhead. 5:1 data reduction can reduce effective capacity requirements by 80%. Connect via Cisco Nexus 9300 switches for high-speed SAN fabric.
Virtual Desktop Infrastructure (VDI)
Support 10,000+ concurrent VDI sessions with predictable performance. The dual-controller active-active architecture provides transparent failover, while 21M IOPS handles boot storms and application launches. Integrate with VMware Horizon or Citrix Virtual Apps for enterprise desktop virtualization at scale.
Cyber Resilience and Ransomware Protection
Deploy FlashSystem 9600 with IBM SafeguardedCopy for immutable snapshots that cannot be encrypted by ransomware. Air-gapped copies provide last-resort recovery, while FlashCore Module-level encryption protects data at rest. Cyber Vault integration enables automated threat detection and recovery orchestration.
Why Choose BENQUAN GLOBAL
Quick Answer: IBM Storage partnership means genuine parts, and in-stock configurations ship in 48 hours against 28-day factory lead times. Certified specialists review the configuration before purchase, options span new, refurbished and compatible FlashCore Modules, warranty stays intact with optional Expert Care extension, and worldwide shipping includes customs clearance help.
- Authorized Distributor: Direct IBM Storage partnership for genuine products
- Fast Delivery: 48-hour shipping on in-stock configurations vs. 28-day official lead times
- Technical Expertise: IBM-certified storage specialists for pre-sales configuration
- Flexible Options: New, certified refurbished, and compatible FlashCore Modules
- Warranty Support: Full IBM warranty plus extended Expert Care options
- Global Logistics: Worldwide shipping with customs clearance assistance
Next Steps
Quick Answer: Send the existing BOM or capacity target and we check compatibility with your fabric, price new against certified refurbished, and quote compatible FlashCore Modules where they save money. Expedited shipping and Expert Care activation can be arranged with the order for urgent 9600 deployments.
Ready to deploy IBM FlashSystem 9600 for your enterprise storage needs? Our team can help you:
- Verify configuration compatibility with your existing infrastructure
- Compare pricing between new and certified refurbished options
- Source compatible FlashCore Modules at competitive pricing
- Arrange expedited shipping for urgent deployments
- Provide post-installation support and IBM Expert Care activation
Frequently Asked Questions
Quick Answer: Buyers reaching this page usually search the machine type 5078-A40 rather than the marketing name. These answers cover capacity math, the seven order lines, component lead times, encryption overhead and Fibre Channel port count, so the configuration can be frozen before the purchase order goes out.
5078-A40 is the IBM machine type and model for the FlashSystem 9600, a dual-controller active-active all-flash array. A full build carries 32 FlashCore Module 5 drives at 26.4TB each plus 3TB of cache, and delivers up to 21 million IOPS at sub-100 microsecond latency.
Thirty-two 26.4TB FlashCore Module 5 drives give 844.8TB raw. Inline deduplication, compression and pattern removal take that to roughly 4.2PB effective at a 5:1 reduction ratio. Actual effective capacity depends on how compressible your data set is.
Seven lines: the 5078-A40 base system, 32x ADSL 26.4TB FlashCore Module 5, one ALGH 1.5TB cache upgrade, two AHBP 64Gb FC adapter pairs, one ACEG encryption activation, two 9730 PDU power cords, and the 5079-A03 three-year Expert Care Advanced contract.
The 5078-A40 base system quotes at 28 days and the ADSL FlashCore Modules at 21 days, so those two set the delivery date. AHBP adapter pairs run 17 days, the ALGH cache upgrade 14 days, power cords 7 days, Expert Care 5 days and encryption activation 3 days.
No. Encryption runs inside each FlashCore Module in hardware, so the 21 million IOPS ceiling and sub-100 microsecond latency hold with data-at-rest protection enabled. The capability still needs the ACEG activation line on the purchase order before it can be switched on.
Two AHBP adapter pairs supply sixteen 64Gb Fibre Channel host ports in total, four ports per adapter across both controllers. Size the SAN fabric to match, because host-side port count becomes the bottleneck once the array itself clears 21 million IOPS.
Key Takeaway: Quote the base 5078-A40 with all 32 ADSL modules, the ALGH cache feature, both AHBP adapter pairs and ACEG encryption on one purchase order, because partial builds invite a second procurement cycle. BENQUAN GLOBAL LIMITED supplies the IBM FlashSystem 9600 with competitive pricing and configuration support.