Overview
Quick Answer: Huawei's OceanStor Dorado 8000 V6 is a four-controller, end-to-end NVMe array aimed at workloads that cannot tolerate variable latency. Active-active controllers share 2TB of cache, 36 NVMe SSDs of 30.72TB reach 1.1PB raw, and 100Gb RDMA links the controller enclosure to its disk shelf.
The Huawei OceanStor Dorado 8000 V6 represents the pinnacle of enterprise all-flash storage technology, designed for organizations requiring extreme performance, massive scalability, and carrier-grade reliability. This flagship storage system combines cutting-edge NVMe technology with intelligent data management to deliver uncompromising performance for the most demanding enterprise workloads.
Built on a robust 4-controller architecture with 2TB of cache per system, the Dorado 8000 V6 provides the foundation for digital transformation initiatives, supporting everything from large-scale database consolidation to AI/ML training workloads and real-time analytics.
Key Highlights
- 4-Controller Architecture: Active-active design with 2TB total cache for maximum performance and availability
- NVMe End-to-End: Native NVMe protocol from host to media eliminates bottlenecks
- Petabyte-Scale Capacity: Support for 36+ NVMe SSDs per enclosure with 30.72TB drives
- 100Gb RDMA Connectivity: Ultra-low latency backend interconnect for controller-to-storage communication
- 32Gb Fibre Channel: High-speed host connectivity with SmartIO modules
- Advanced Software Suite: Comprehensive data services including thin provisioning, snapshots, replication, and QoS
Architecture and Design
Quick Answer: All four controllers in the 4U D8V6-4C-2T-NEU enclosure process I/O at once with automatic failover, leaving no single point of failure. The 2TB cache pool is distributed across them, power supplies are N+N redundant, and controllers, fans and supplies swap out without downtime. SmartIO and RDMA modules split host from backend traffic.
Controller Enclosure
The Dorado 8000 V6 controller enclosure (Model: D8V6-4C-2T-NEU) occupies 4U of rack space and houses four independent controllers in an active-active configuration. This architecture ensures:
- Zero Single Point of Failure: All four controllers actively process I/O, with automatic failover
- 2TB Cache Pool: Distributed across controllers for optimal read/write acceleration
- Redundant Power: AC/240V HVDC power supplies with N+N redundancy
- Hot-Swappable Components: Controllers, power supplies, and fans can be replaced without downtime
Interface Modules
The system is equipped with high-performance I/O modules for both host connectivity and backend storage expansion:
SmartIO 32Gb FC (03050GYB)
Quantity: 2 modules (8 ports total)
4-port SFP28 modules delivering 32Gb Fibre Channel connectivity for SAN environments. Supports FC-NVMe protocol for maximum performance.
100Gb RDMA Backend (03050GYM)
Quantity: 2 modules (4 ports total)
QSFP28 modules providing 100Gb RDMA over Converged Ethernet (RoCE) for ultra-low latency backend communication between controllers and disk enclosures.
Storage Capacity
This configuration delivers massive capacity through high-density NVMe SSDs:
- 36x 30.72TB NVMe SSDs (Part Number: 02355SMB)
- Raw Capacity: 1,105.92 TB (1.1 PB)
- Form Factor: 7" Palm Disk Units optimized for density
- Usable Capacity: Approximately 700-900 TB depending on RAID configuration and data reduction
Disk Enclosure
The Smart NVMe Disk Enclosure (Model: D8-NVM36-2U-E-ACpEU, Part Number: 02355XUQ) provides:
- 2U Form Factor: 36 disk slots in a compact 2U chassis
- 100Gb RDMA Connectivity: Direct connection to controller enclosure via RDMA
- Expansion Module: Built-in intelligence for distributed data processing
- Redundant Power: AC/240V HVDC with hot-swap capability
Complete Configuration Specifications
Quick Answer: This configuration is eight part numbers: controller enclosure 02355HBH, two 03050GYB SmartIO 32Gb FC modules, two 03050GYM 100Gb RDMA backend modules, 36 02355SMB 30.72TB NVMe SSDs, one 02355XUQ 36-slot disk enclosure, eight 14130858 patch cords, two 04052182 DAC cables and the 88036XNH advanced license.
| Part Number | Model | Description | Quantity |
|---|---|---|---|
| 02355HBH | D8V6-4C-2T-NEU | Dorado 8000 V6 Controller Enclosure(4U,Four Ctrl,NVMe,AC\240V HVDC,2TB Cache,SPE74C0400) | 1 |
| 03050GYB | DV6-SMARTIO4*32FC-H | 4 ports SmartIO I/O module(SFP28,32Gb FC) | 2 |
| 03050GYM | H-RDMA-BE | 2 ports 100Gb RDMA I/O module(QSFP28,for Back-End) | 2 |
| 02355SMB | D8V6-SSD-NVMe-30.72T | 30.72TB SSD NVMe Palm Disk Unit(7") | 36 |
| 02355XUQ | D8-NVM36-2U-E-ACpEU | Smart NVMe Disk Enclosure(2U,AC\240V HVDC,Palm,Expansion Module,100Gb RDMA,36 Disk Slots,Without Disk Units,DAE73625U2) | 1 |
| 14130858 | SN2F01FCPC | Patch Cord,DLC/PC,DLC/PC,Multi-mode,3m,A1a.2,2mm,42mm DLC,OM3 bending insensitive | 8 |
| 04052182 | HSC-100G QSFP28-2M | High Speed Cable,100G QSFP28 Passive High Speed Cable,2m,QSFP28,CC8P0.4B(S),QSFP28,ETH 100GbE only for Storage,EEPROM | 2 |
| 88036XNH | D8V6-LBS-Super | Advanced License(Including DeviceManager,Thin,Migration,Snap,Replication,Clone,QoS,Erase,DME IQ,Virtualization,Metro,CDP) | 1 |
Software and Licensing
Quick Answer: The 88036XNH D8V6-LBS-Super license bundles the full data-services stack: thin provisioning, inline deduplication and compression up to 5:1, snapshots, clones, synchronous and asynchronous replication, CDP with seconds-level RPO, QoS per workload, Metro active-active clustering, migration tools, DeviceManager and DME IQ analytics. Hypervisor integration covers VMware, Hyper-V and KVM.
The system includes the Advanced License Suite (88036XNH - D8V6-LBS-Super), providing comprehensive data management capabilities:
Storage Efficiency
- Thin Provisioning: Allocate capacity on-demand
- Deduplication & Compression: Reduce storage footprint by up to 5:1
- Inline Processing: Zero performance impact
Data Protection
- Snapshots: Point-in-time copies with minimal overhead
- Replication: Synchronous and asynchronous remote replication
- CDP (Continuous Data Protection): RPO measured in seconds
Performance & Availability
- QoS (Quality of Service): Guarantee performance SLAs per workload
- Metro Cluster: Active-active stretched cluster for zero RTO/RPO
- Virtualization: VMware, Hyper-V, and KVM integration
Management & Migration
- DeviceManager: Unified management interface
- DME IQ: Intelligent analytics and predictive maintenance
- Migration Tools: Non-disruptive data migration from legacy arrays
Cabling and Connectivity
Quick Answer: Cabling ships with the system: eight 3-meter OM3 DLC patch cords (14130858) for the eight 32Gb Fibre Channel host ports, and two 2-meter passive 100G QSFP28 DAC cables (04052182) linking the controller enclosure to the NVMe disk shelf over RDMA. No extra optics are required.
The configuration includes all necessary cabling for immediate deployment:
- 8x DLC/PC Multi-mode Patch Cords (14130858): 3-meter OM3 cables for FC connectivity
- 2x 100G QSFP28 High-Speed Cables (04052182): 2-meter passive DAC cables for RDMA backend
Performance Characteristics
Quick Answer: Peak figures for this architecture are 20 million IOPS on 4KB random reads, 350GB/s sequential throughput and average latency below 100 microseconds, with 99.9999% availability when configured redundantly. Real numbers depend on block size, data reduction settings and how many hosts share the eight FC ports.
While actual performance varies by workload, the Dorado 8000 V6 architecture delivers:
- IOPS: Up to 20 million IOPS (4KB random read)
- Throughput: Up to 350 GB/s (sequential)
- Latency: Sub-100 microsecond average latency (0.1ms)
- Availability: 99.9999% (six nines) with proper configuration
Ideal Use Cases
Quick Answer: Five scenarios recur: consolidating hundreds of Oracle, SQL Server or PostgreSQL databases under QoS; feeding GPU clusters for AI training; SAP HANA and other real-time analytics; thousands of virtual desktops surviving boot storms; and ERP, CRM or core banking systems that need Metro active-active disaster recovery.
1. Large-Scale Database Consolidation
Consolidate hundreds of Oracle, SQL Server, or PostgreSQL databases onto a single high-performance platform. The 4-controller architecture and QoS capabilities ensure consistent performance for mixed workloads.
2. AI/ML Training and Inference
The massive throughput and low latency make the Dorado 8000 V6 ideal for feeding GPU clusters with training data. NVMe performance eliminates storage bottlenecks in AI pipelines.
3. Real-Time Analytics and Data Warehousing
Support high-concurrency analytical queries with consistent sub-millisecond response times. Perfect for SAP HANA, Teradata, and other in-memory databases.
4. Virtual Desktop Infrastructure (VDI)
Deliver smooth user experience for thousands of concurrent virtual desktops. The system handles boot storms and peak I/O without performance degradation.
5. Mission-Critical Applications
Run ERP, CRM, and core banking systems with confidence. Metro cluster capability provides active-active disaster recovery with zero data loss.
Deployment Considerations
Quick Answer: Plan 6U of rack space (4U controller plus 2U disk enclosure), roughly 150kg fully loaded, front-to-back airflow and redundant AC or 240V HVDC feeds. Hosts need 32Gb FC switches, management wants 1Gb or 10Gb Ethernet, and capacity grows by adding 2U enclosures without downtime.
Physical Requirements
- Rack Space: 6U total (4U controller + 2U disk enclosure)
- Power: AC 100-240V or 240V HVDC, redundant supplies
- Cooling: Front-to-back airflow, hot-aisle/cold-aisle compatible
- Weight: Approximately 150 kg fully loaded
Network Requirements
- SAN Fabric: 32Gb FC switches (Brocade, Cisco MDS)
- Management Network: 1Gb/10Gb Ethernet for out-of-band management
- Backend Network: 100Gb RDMA-capable switches (optional for multi-enclosure)
Scalability Path
The Dorado 8000 V6 supports non-disruptive expansion:
- Capacity Expansion: Add additional 2U disk enclosures up to system maximum
- Performance Expansion: Add I/O modules or upgrade to higher-speed interfaces
- Controller Upgrade: Upgrade cache or processing power without data migration
Why Choose BENQUAN GLOBAL for Your Dorado 8000 V6 Deployment?
Quick Answer: Support spans pre-sales through refresh: workload analysis and sizing, access to Huawei's global supply chain, installation, configuration and data migration by engineers, knowledge transfer for your own team, 24/7 monitoring and support, then firmware updates and capacity planning across the system's service life.
As an authorized Huawei storage solutions provider, BENQUAN GLOBAL offers:
- Expert Pre-Sales Consulting: Workload analysis and sizing recommendations
- Competitive Pricing: Direct access to Huawei's global supply chain
- Professional Services: Installation, configuration, and data migration
- Training and Knowledge Transfer: Ensure your team can manage the system effectively
- Ongoing Support: 24/7 technical support and proactive monitoring
- Lifecycle Management: Firmware updates, capacity planning, and technology refresh
Contact BENQUAN GLOBAL today for a customized Huawei OceanStor Dorado 8000 V6 proposal tailored to your specific requirements.
Request a QuoteFrequently Asked Questions
Quick Answer: Common questions cover usable capacity (about 70-75% after RAID 6 8+2, then 3-5x with data reduction), protocol support (FC-SCSI and FC-NVMe on the same SmartIO modules), deployment timeline (6-10 weeks from order to production) and warranty, which starts at three years next-business-day.
What is the effective capacity after RAID and overhead?
With RAID 6 (8+2 configuration), expect approximately 70-75% usable capacity before data reduction. With deduplication and compression enabled, effective capacity can reach 3-5x raw capacity depending on workload.
Can the system support both FC and NVMe-oF protocols?
Yes, the SmartIO modules support both traditional FC-SCSI and FC-NVMe protocols. For NVMe-oF over Ethernet, additional interface modules can be installed.
What is the typical deployment timeline?
From order to production: 4-6 weeks for hardware delivery, 1-2 weeks for installation and configuration, and 1-2 weeks for data migration and validation. Total: 6-10 weeks.
Is the system compatible with existing SAN infrastructure?
Yes, the Dorado 8000 V6 integrates seamlessly with existing FC SAN fabrics. It supports all major operating systems (Windows, Linux, AIX, HP-UX, Solaris) and hypervisors (VMware, Hyper-V, KVM).
What warranty and support options are available?
Standard warranty is 3 years with next-business-day hardware replacement. Extended warranties (5 years) and 24/7 mission-critical support are available. BENQUAN GLOBAL can provide local support augmentation.
Related Solutions
Quick Answer: Dorado 8000 V6 deployments usually sit beside GPU compute for AI pipelines, a backup and disaster recovery tier to protect the array, and wider data center modernization work. Browse the vendor portfolio to match switching, servers and protection around the storage layer.
Explore complementary solutions from BENQUAN GLOBAL:
- NVIDIA AI Compute Servers - Pair with GPU clusters for AI workloads
- Data Center Modernization - Comprehensive infrastructure transformation
- Backup and Disaster Recovery - Protect your Dorado investment
- All manufacturer Solutions - Browse our complete portfolio
Key Takeaway: Budget the site before the array: 6U, about 150kg loaded, redundant power feeds and 32Gb FC switching on the host side. Then hold the quote to all eight part numbers — the Super license, DAC and patch cords are exactly what a chassis-only PDF leaves out. BENQUAN GLOBAL LIMITED supplies the Huawei OceanStor Dorado 8000 V6 with competitive pricing.