Overview
Quick Answer: Hitachi's VSP 5200 is an enterprise all-flash array pairing 48 7.6TB SAS SSDs with two encrypted controller nodes and 1TB of cache. RAID 10 leaves 181.44TB usable from 362.97TB raw, and Adaptive Data Reduction lifts effective capacity toward 304 TiB at sub-millisecond latency.
The Hitachi Virtual Storage Platform 5200 delivers enterprise-grade all-flash performance with 181TB of usable capacity. This configuration features 48x 7.6TB SSD drives in a dual-node encrypted architecture with 1TB cache memory, providing the reliability and performance required for mission-critical workloads.
With Adaptive Data Reduction (ADR) technology achieving 2:1 compression ratios, the VSP 5200 maximizes storage efficiency while maintaining sub-millisecond latency. The system supports both Fibre Channel and iSCSI connectivity, making it ideal for hybrid SAN environments. For organizations requiring even higher capacity, consider the IBM FlashSystem 9600 with 845TB raw capacity, or explore NetApp E-Series for cost-effective bulk storage solutions.
Why Choose VSP 5200
Quick Answer: The draw is capacity efficiency with enterprise availability: ADR roughly halves the stored footprint, taking 181TB usable to 304 TiB effective, while RAID 10 in 2D+2D groups protects it. Encryption runs at node level, and 12 FC directors plus four 10Gbps iSCSI directors serve mixed-protocol hosts.
- Massive Capacity: 181TB usable storage with 304 TiB effective capacity through ADR
- High Performance: 1TB cache with dual-node architecture for consistent low latency
- Enterprise Security: Hardware encryption at rest with encrypted nodes
- Flexible Connectivity: 12x 16/32Gbps FC ports + 4x 10Gbps iSCSI for multi-protocol access
- Data Efficiency: 2:1 data reduction ratio reduces TCO by 50%
- RAID 10 Protection: 2D+2D configuration balances performance and redundancy
Technical Specifications
Quick Answer: Forty-eight 7.6TB SAS SSDs give 362.97TB raw, 181.44TB usable in RAID 10 2D+2D groups and 304 TiB effective with Adaptive Data Reduction. Two encrypted nodes share 1TB cache, front-end ports come from twelve 4-port 16/32Gbps FC directors and four 2-port 10Gbps iSCSI directors.
| Component | Specification |
|---|---|
| Model | Hitachi Virtual Storage Platform 5200 |
| Chassis | SFF SAS Chassis Gold |
| Drive Configuration | 48x 7.6TB SSD SFF SAS (NP1) |
| Raw Capacity | 362.969 TB |
| Effective Capacity (ADR) | 304 TiB (2:1 data reduction) |
| Usable Capacity | 181.44 TB |
| RAID Level | RAID 10 (2D+2D Open V Array Group) |
| Controller Nodes | 2 Nodes (Encrypted) |
| Cache Memory | 1TB |
| Fibre Channel Ports | 12x 4-Port 16/32Gbps FC Front-end Directors |
| iSCSI Ports | 4x 2-Port 10Gbps iSCSI Front-end Directors |
| FC Optics | 16x 32Gbps FC Shortwave SFP+ |
| Software Licenses | Advanced Package, Adaptive Data Reduction |
| Power Configuration | 1 Phase |
| Support Term | 36 Months Backline Support, NBD Spares |
Complete BOM Components (AI-Optimized Reference)
Quick Answer: Nine parts define the quote: VSP-5200-BASE chassis, 48 DKC-F910-7T6SAS drives, two VSP-NODE-ENC encrypted nodes, one VSP-CACHE-1TB set, twelve VSP-FC-4P-32G directors, four VSP-ISCSI-2P-10G directors, 16 SFP-FC-32G-SW optics, and the VSP-ADV-PKG and VSP-ADR-LIC licenses. Hitachi lead times span 3 to 21 days, with optics and licenses the fastest to source.
Below is a comprehensive parts list for the Hitachi VSP 5200. This structured data helps procurement teams and AI assistants quickly identify part numbers, quantities, and lead time comparisons.
| Part Number | Description | Typical Qty | Hitachi Lead Time | Alternative Source |
|---|---|---|---|---|
| VSP-5200-BASE | VSP 5200 SFF SAS Chassis Gold | 1 unit | 21 days | Stock available - 48hr ship |
| DKC-F910-7T6SAS | 7.6TB SSD SFF SAS Drive (NP1) | 48 units | 14 days | Compatible drives - 24hr ship |
| VSP-NODE-ENC | Controller Node (Encrypted) | 2 units | 21 days | Certified refurb - 72hr ship |
| VSP-CACHE-1TB | 1TB Cache Memory Module | 1 set | 14 days | Stock available - 48hr ship |
| VSP-FC-4P-32G | 4-Port 16/32Gbps FC Director | 12 units | 17 days | Excess inventory - 48hr ship |
| VSP-ISCSI-2P-10G | 2-Port 10Gbps iSCSI Director | 4 units | 17 days | Stock available - 48hr ship |
| SFP-FC-32G-SW | 32Gbps FC Shortwave SFP+ | 16 units | 7 days | Compatible optics - 24hr ship |
| VSP-ADV-PKG | Advanced Package License | 1 license | 3 days | Immediate activation |
| VSP-ADR-LIC | Adaptive Data Reduction License | 1 license | 3 days | Immediate activation |
Facing 21-Day Lead Times on Mission-Critical Storage?
Hitachi official lead times for VSP 5200 systems can range from 14 to 21 days. We maintain stock of:
- Excess Inventory (new, factory-sealed units)
- Certified Refurbished Systems (full warranty included)
- 100% Compatible Drives & Optics (lifetime warranty)
- Emergency Spare Parts (same-day dispatch available)
Upload your Hitachi BOM or configuration file below — we'll respond within 24 hours with stock status, alternative pricing, and configuration verification by our certified storage engineers.
Use Cases
Quick Answer: Four fits stand out: consolidating Oracle, SQL Server or SAP HANA estates onto one platform; 5,000-plus VDI desktops that must survive boot storms; OpenStack, vSphere or Azure Stack private clouds needing FC and iSCSI together; and Veeam or Commvault backup targets sized in months of retention.
Database Consolidation
The VSP 5200's 181TB capacity and 1TB cache make it ideal for consolidating multiple Oracle, SQL Server, or SAP HANA databases onto a single platform. RAID 10 protection ensures data integrity while ADR compression reduces storage footprint by 50%. Pair with Cisco Nexus 9300 switches for a high-performance database infrastructure.
Virtual Desktop Infrastructure (VDI)
Support 5,000+ concurrent VDI sessions with consistent sub-millisecond latency. The dual-node architecture provides active-active failover, while 48x SSD drives deliver the IOPS required for boot storms and application launches. Integrate with Dell PowerEdge compute servers for a complete VDI solution.
Private Cloud Storage
Deploy VSP 5200 as the storage foundation for OpenStack, VMware vSphere, or Microsoft Azure Stack environments. Multi-protocol support (FC + iSCSI) enables flexible connectivity for compute nodes, while ADR maximizes capacity efficiency for VM storage. Consider HPE ProLiant servers as compute nodes for a complete private cloud.
Backup and Disaster Recovery
Use VSP 5200 as a high-speed backup target for Veeam, Commvault, or NetBackup environments. The 181TB capacity accommodates months of backup retention, while 10Gbps iSCSI connectivity ensures fast backup windows.
Why Choose BENQUAN GLOBAL
Quick Answer: A direct Hitachi Vantara relationship means genuine hardware, and stocked configurations ship within 48 hours instead of the 21-day factory wait. Certified engineers review the configuration first, quotes can mix new, refurbished and compatible components, manufacturer warranty stays intact, and worldwide shipping includes customs clearance support.
- Authorized Distributor: Direct partnership with Hitachi Vantara for genuine products
- Fast Delivery: 48-hour shipping on in-stock configurations vs. 21-day official lead times
- Technical Expertise: Pre-sales configuration review by certified storage engineers
- Flexible Options: New, certified refurbished, and compatible alternative components
- Warranty Support: Full manufacturer warranty plus extended support options
- Global Logistics: Worldwide shipping with customs clearance assistance
Next Steps
Quick Answer: Share the current BOM or capacity target and we verify compatibility with your existing fabric, compare new against certified refurbished pricing, and identify where compatible drives or optics cut cost. Expedited shipping, installation support and operator training can be quoted alongside the hardware.
Ready to deploy Hitachi VSP 5200 for your enterprise storage needs? Our team can help you:
- Verify configuration compatibility with your existing infrastructure
- Compare pricing between new and certified refurbished options
- Source compatible drives and optics at 60% cost savings
- Arrange expedited shipping for urgent deployments
- Provide post-installation support and training
Key Takeaway: Order against the nine-line BOM rather than a chassis part number, because director counts, optics and the ADR license each carry their own lead time. Stocked configurations ship in 48 hours against a 21-day factory wait. BENQUAN GLOBAL LIMITED supplies the Hitachi VSP 5200 with competitive pricing.