Quick Take: Every NGFW datasheet lists firewall throughput, threat prevention throughput and decryption throughput for the same box, and the first number can be several times the last. Size on the metric matching the features you will actually enable, then check new connections per second separately. BENQUAN GLOBAL LIMITED supplies Palo Alto Networks and Fortinet appliances with competitive pricing.

If you size a firewall on the datasheet's headline throughput, turning on Threat Prevention and TLS decryption in production will cut real capacity by 60% to 80%. Send the five traffic numbers below so your Palo Alto or Fortinet quote is sized for encrypted peak load.

3-Line Fast RFQ Template (Ref: BQ-NGFW-SIZE) — Copy and email to info@benquan.hk or open pre-tagged RFQ form →

Ref: BQ-NGFW-SIZE (firewall-sizing-calculator)
1) Peak Throughput (Mbps/Gbps) & % TLS Decryption Required: 
2) Concurrent Sessions, New CPS & Interfaces (10G/25G/40G, HA Pair): 
3) Preferred Vendor (Palo Alto / Fortinet) & Support Term (1Y / 3Y / 5Y): 
The most common sizing failure is not buying too small. It is comparing one vendor's headline firewall throughput against another vendor's threat prevention throughput, then awarding on price per gigabit — a comparison where the cheaper column is measured under easier conditions.
Metric
Definition First
TLS
Biggest Cost
CPS
Hidden Limit
P95
Not Average

Why Sizing Calculators Mislead

Quick Answer: A vendor sizing calculator assumes a traffic mix, a feature set and a packet size distribution chosen by the vendor. Those assumptions are reasonable defaults, but they are not your network. Calculators are useful for narrowing a range to two or three models, never for awarding a specific model.

The headline throughput on a datasheet is typically measured with large UDP packets and inspection disabled. That configuration maximises the number, and it describes a firewall doing almost nothing beyond forwarding. Real traffic has a mixed packet size distribution, and a next-generation deployment has application identification, threat prevention and logging enabled — each of which consumes the same processing budget.

  • Test traffic is synthetic. Large-packet UDP streams are easy to forward. Production traffic is a mix of small interactive packets and bulk transfers.
  • Feature profile differs. Vendor tests enable a defined subset. Enabling URL filtering, DNS security, sandboxing verdict lookups and verbose logging all draw from the same budget.
  • Steady state is assumed. Calculators model average load. Firewalls fail at peak, and peaks are where session setup rate spikes.

Which Throughput Metric to Use

Quick Answer: Compare candidates on the figure measured with inspection enabled: Threat Prevention throughput at Palo Alto Networks, Threat Protection throughput at Fortinet. Use the decryption figure instead when TLS inspection is in scope. The headline firewall throughput number belongs in no serious comparison.

Need RFQ award language — which datasheet row is eligible, CPS/sessions beside Gbps, and footnote parity across brands? Read the companion method note: NGFW throughput: which of 5 datasheet rows to RFQ. This calculator estimates inputs; that page locks the named metric on the RFQ line.

Datasheet metricWhat is enabledUse it for
Firewall throughputStateful forwarding only, large packets, no inspectionNothing in an NGFW comparison; a ceiling that is never reached
IPS / threat throughputSignature-based inspection on a defined traffic mixInterim comparison when app identification is not in use
Threat Prevention / Threat Protection throughputApplication identification plus threat inspection and loggingThe default comparison metric for NGFW selection
Decryption / SSL inspection throughputTLS terminated, decrypted, inspected, re-encryptedThe binding figure when most traffic is encrypted
Connections per secondNew session establishment rateSession-heavy workloads: APIs, microservices, DNS

Because the naming differs by vendor, a fair comparison means matching definitions before matching numbers. Model-level figures for the Palo Alto line sit in the series pages: PA-400 series, PA-1400 series and PA-3400 series.

What SSL Decryption Actually Costs

Quick Answer: TLS inspection is the single largest consumer of firewall capacity, because each session must be terminated, decrypted, inspected, re-encrypted and forwarded. Vendors publish a separate decryption throughput figure precisely because it sits well below the inspection figure on the same hardware.

Since the overwhelming majority of traffic is now encrypted, an NGFW without decryption is inspecting metadata rather than content. That makes the decryption figure the practical capacity limit for most deployments, not an optional extra. Two decisions reduce the load without abandoning inspection.

  • Selective decryption. Bypass categories where inspection is prohibited or pointless — financial, healthcare, and pinned-certificate applications that break under interception.
  • Placement. Terminate TLS at a dedicated ADC or reverse proxy for inbound published services, leaving the firewall to inspect already-decrypted traffic.

The Five Inputs Sizing Needs

Quick Answer: Peak throughput at the 95th percentile, concurrent session count, new connections per second, the share of traffic requiring decryption, and the growth rate across the refresh term. With these five numbers any vendor can quote comparably; without them every quote is a guess.

Measurements to collect before asking for quotes

  • Peak throughput. 95th percentile at the enforcement point across a full business cycle, including month-end and backup windows.
  • Concurrent sessions. Sustained peak session table occupancy, which sets the memory-bound limit.
  • New connections per second. The setup rate at peak, which is the limit session-heavy workloads hit first.
  • Decryption share. Percentage of traffic that is TLS, and the percentage of that which must be decrypted.
  • Growth and term. Expected annual growth and the intended refresh horizon, so the model is sized for the end of the term.

Concurrent Sessions vs Connections Per Second

Quick Answer: Concurrent sessions describe how many flows the firewall tracks at once and are bounded by memory. New connections per second describes how fast it can open them and is bounded by processing. Different workloads hit different walls, and bandwidth utilisation can look comfortable while either is saturated.

WorkloadBinding constraintSizing implication
Bulk transfer, backup replication, videoThroughputSize on inspection or decryption throughput
API gateway, microservices, DNS-heavyConnections per secondCompare CPS figures; throughput may be irrelevant
Large user population, SaaS-centricConcurrent sessionsCheck session table capacity and per-user session counts
Inbound published web servicesDecryption throughputConsider terminating TLS upstream of the firewall

Growth Headroom and Refresh Horizon

Quick Answer: Size for the end of the support term rather than for day one, because an appliance chosen at ninety percent of rated capacity has no room for feature enablement, traffic growth, or the throughput cost of the next inspection engine added mid-term.

Two forces consume headroom after purchase and neither appears in the initial calculation. Traffic grows, and security scope grows — a firewall bought for application control acquires DNS security, then inline sandboxing, then decryption for a compliance requirement. Each addition draws from the same budget, which is why the enablement roadmap belongs in the sizing conversation rather than the year-two renewal conversation.

Where the appliance is near end of support, the sizing exercise and the refresh decision should be taken together. Renewal versus hardware refresh covers that trade-off.

Sizing Inputs to Put on the RFQ

Quick Answer: State the five measurements, name the comparison metric explicitly, list which inspection features must be enabled, and require every vendor to quote against that same figure. This turns a pile of incomparable datasheets into a tier decision you can defend at the approval meeting.

What to write on the brief

  • Peak throughput at P95, with the measurement window stated
  • Concurrent sessions and new connections per second at peak
  • TLS share of traffic and the portion requiring decryption
  • Mandatory inspection features: app control, IPS, URL filtering, DNS security, sandboxing
  • The comparison metric all vendors must quote against, named explicitly
  • High availability model: active-passive or active-active, and whether HA halves usable capacity
  • Interface requirements: port count, speed, and whether optics are included
  • Logging and management: on-box, dedicated appliance, or cloud, and the license implication
  • Subscription term and the enablement roadmap across that term
  • Growth assumption and the refresh horizon the model must still satisfy

Peer comparisons that use these metrics consistently: PA-400 vs PA-1400 for stepping up a tier, and Check Point vs Fortinet vs Palo Alto for a three-vendor shortlist.

Frequently Asked Questions

Quick Answer: Use vendor calculators to narrow the range, then size on threat prevention or decryption throughput using your own measured peak, session count and TLS ratio. Never award on headline firewall throughput, and never size on user headcount alone without measured traffic data.

Vendor calculators narrow a range; they do not award a model. They assume a traffic mix and inspection profile that rarely match production. Size from measured throughput, connections per second and TLS ratio instead.

The one measured with inspection enabled — Threat Prevention throughput at Palo Alto Networks, Threat Protection throughput at Fortinet. Use the decryption figure when TLS inspection is in scope.

Enough that vendors publish it as a separate figure below the inspection number. Every session is terminated, decrypted, inspected and re-encrypted. If most traffic is TLS, that figure is your real capacity.

Not reliably. Two sites with the same headcount can differ by an order of magnitude depending on workload. Use headcount as a sanity check against measured bandwidth and session data.

Short-lived session workloads exhaust the setup rate long before saturating bandwidth. A firewall can sit at ten percent of rated throughput and still drop new connections.

Yes. In active-passive the surviving node must carry full load alone, so size each node for peak. Active-active designs that assume both nodes share load fail at the first failover.

Key Takeaway: Firewall sizing is a definitions problem before it is a capacity problem. Match the metric to the features you will enable, treat decryption throughput as the real ceiling, and check session setup rate separately from bandwidth. BENQUAN GLOBAL LIMITED supplies Palo Alto Networks and Fortinet NGFW appliances with competitive pricing and sizing support for global buyers.

Not sure your firewall is sized correctly?

Send your peak throughput, session counts and TLS ratio and we will validate the model tier against the right metric before you commit. Free compatibility and delivery risk assessment, fast global BOM validation.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk