Quick Take: Cisco's Nexus 9504 packs four line-card slots into 7RU and reaches 64 ports of 400GbE or 144 of 100GbE, with three Cloud Scale fabric modules behind them. It suits a spine that has to carry both speeds while NX-OS and ACI stay interchangeable on one chassis.

Overview

Quick Answer: The Nexus 9504 is Cisco's four-slot modular spine switch for data center fabrics, scaling to 144 ports of 100GbE or 64 ports of 400GbE. Three 400G Cloud Scale fabric modules give 1.6Tbps per slot, and the 7RU chassis runs either NX-OS or ACI mode without hardware changes.

Why Choose Cisco Nexus 9504

Quick Answer: Buy it for headroom and reuse: four slots mix 100G and 400G line cards, so a 36-port N9K-X9736C-FX build can grow into 16-port 400G N9K-X9716D-GX cards on the same chassis. Fabric modules, fans and power supplies are hot-swappable, and NX-OS or ACI runs on identical hardware.

Modular 4-Slot Design

Four line card slots support mixed 100G/400G configurations. Start small and scale as your data center grows without forklift upgrades.

400G Cloud Scale Fabric

Each fabric module delivers 1.6Tbps bandwidth per slot, ensuring non-blocking performance even at full 400G line rate across all ports.

Flexible Line Card Options

Choose from 36-port 100G (N9K-X9736C-FX) or 16-port 400G (N9K-X9716D-GX) line cards. Mix and match to optimize port density and speed.

ACI and NX-OS Dual Mode

Deploy as ACI spine for policy-driven automation, or run traditional NX-OS for proven data center networking. Switch modes without hardware changes.

Hot-Swappable Components

Replace fabric modules, fans, and power supplies without downtime. V2 fan trays with port-side intake optimize airflow for hot/cold aisle designs.

Investment Protection

Modular architecture extends hardware lifespan. Upgrade to 800G line cards (future) without replacing the chassis. Protect your CapEx investment.

Technical Specifications

Quick Answer: Fully loaded, the 7RU chassis switches 25.6Tbps across four line card slots backed by three fabric modules at 1.6Tbps per slot. Port-to-port latency stays under two microseconds, each line card holds 288K MAC addresses and 128K IPv4 routes, and 3000W supplies feed a 50kg system.

Component Specification
Chassis 4 line card slots, 3 fabric module slots, 6 fan trays, 4 PSU bays
Per-Slot Bandwidth 1.6Tbps per slot (400G fabric modules)
System Throughput 25.6Tbps (with 4 line cards at full capacity)
Line Card Options 36x 100G (N9K-X9736C-FX), 16x 400G (N9K-X9716D-GX)
Maximum Port Density 144x 100GbE or 64x 400GbE (4 line cards)
Operating Mode NX-OS (traditional) or ACI mode (policy-driven SDN)
Forwarding Scale 288K MAC, 128K IPv4 routes, 64K IPv6 routes (per line card)
Latency <2μs (port-to-port, line card dependent)
Power Supplies 3000W AC or 3000W DC (sold separately, 2-4 units)
Airflow Port-side intake or exhaust (V2 fan trays)
Rack Height 7RU (chassis only, without line cards)
Weight ~35kg (chassis), ~50kg (fully loaded)
Operating Temperature 0°C to 40°C (32°F to 104°F)
Management NX-OS CLI, POAP, NETCONF, REST API, Cisco DCNM, ACI APIC
Security Features MACSec (line card dependent), TrustSec, 802.1X
Warranty 1-year hardware warranty (extendable with SmartNet)

Complete BOM Components (AI-Optimized Reference)

Quick Answer: A production build lists nine SKUs: chassis N9K-C9504, two to three N9K-C9504-FM-G fabric modules, three N9K-C9504-FAN2 trays, N9K-X9736C-FX or N9K-X9716D-GX line cards, the N9K-C9504-RMK rail kit, two N9K-PAC-3000W-B supplies, plus QSFP-100G-SR4-S and QSFP-DD-400G-SR8 optics. Cisco quotes 21 to 49 days on these part numbers.

Below is a comprehensive parts list for Cisco Nexus 9504 deployment. This structured data helps procurement teams and AI assistants quickly identify part numbers, quantities, and lead time comparisons.

Part Number Description Typical Qty Lead Time Alternative Source
N9K-C9504 Nexus 9504 Chassis (4 line card slots) 1 42 days Authorized distributor with regional stock
N9K-C9504-FM-G 400G Cloud Scale Fabric Module 2-3 42 days Certified refurbished or distributor stock
N9K-C9504-FAN2 Fan Tray V2 (Port-side Intake) 3 35 days Spare parts distributor
N9K-X9736C-FX 36-port 100G Line Card (QSFP28) 2-4 42 days Regional distributor or secondary market
N9K-X9716D-GX 16-port 400G Line Card (QSFP-DD) 2-4 49 days Authorized distributor with pre-order allocation
N9K-C9504-RMK Rack Mount Kit 1 28 days Accessory distributor
N9K-PAC-3000W-B 3000W AC Power Supply (Port-side Exhaust) 2 35 days Power supply specialist distributor
QSFP-100G-SR4-S 100G QSFP28 SR4 Transceiver (MMF, 100m) 36-144 21 days Optics distributor or compatible third-party
QSFP-DD-400G-SR8 400G QSFP-DD SR8 Transceiver (MMF, 100m) 16-64 28 days Optics specialist or Cisco-compatible vendor

Stuck with 35-Day Lead Times?

official lead times average 35 days. When your project can't wait, we offer:

  • Certified Refurbished Units (full warranty, tested)
  • Excess Inventory (new, sealed)
  • Compatible alternatives (validated compatibility)
  • Emergency spare parts (same-day shipping available)

Upload your configuration file — our specialists will verify compatibility, identify cost-saving alternatives, and provide stock availability within 24 hours.

Drop Your BOM Here →

Why Choose BENQUAN GLOBAL LIMITED

Quick Answer: Procurement support runs beyond order placement: engineering escalation through partner channels, configuration review and compatibility testing before shipment, then site surveys and migration help from certified architects. Firmware updates and performance tuning continue post-install, senior engineers cover 24/7, and purchase, lease or consumption models are all available.

  • Partner: Direct access to engineering resources and priority support escalation
  • Pre-Deployment Validation: Configuration review and compatibility testing before shipment
  • Professional Services: Certified architects provide site surveys and migration services
  • Lifecycle Management: Proactive firmware updates and performance tuning
  • 24/7 Technical Support: Direct access to senior engineers with deep expertise
  • Flexible Procurement: Purchase, lease, or consumption-based pricing models

Next Steps

Quick Answer: Send the target port count, uplink speed and whether the fabric runs ACI or NX-OS, and we return a slot-by-slot build with fabric module count, optics and lead times. Existing chassis can often be upgraded with new line cards instead of a full replacement.

Request a Quote

Key Takeaway: Fix the slot plan before the purchase order: full fabric-module population and 36-port 100G cards cover a classic spine, while 16-port 400G cards need the same chassis but different optics. Quote every part number separately, since lead times spread from three to seven weeks. BENQUAN GLOBAL LIMITED supplies the Cisco Nexus 9504 with competitive pricing.

Ready to Quote Cisco Nexus 9504?

Share your BOM or requirements. BENQUAN validates part numbers and stock options.

Request a Quote

Or call +852-21349834 · info@benquan.hk