Quick Take: The Cisco Firepower 4200 Series (4215, 4225, 4245, 4255) is a 1RU next-generation firewall line spanning 35 to 50 Gbps firewall throughput and 20 to 30 Gbps IPS. All models share one interface layout, so pick the tier by inspected throughput and growth headroom. BENQUAN supplies the series.

The Cisco Firepower 4200 Series (Secure Firewall 4200) delivers next-generation firewall capability for mid-size enterprises, distributed campuses, and data-center segments. All four models run Firepower Threat Defense (FTD) or ASA software on a shared interface layout, differing only in throughput and capacity. Related: FPR4245 detailed specs, SKU Lookup, request a quote.

Firepower 4200 Series Overview

Quick Answer: Firepower 4215, 4225, 4245, and 4255 cover the enterprise perimeter, internet edge, and data-center segmentation from one platform. Each appliance loads either FTD or classic ASA images and carries identical services, including AMP, IPS, URL filtering, TLS decryption, Talos intelligence, and FMC management, so tiers differ purely in processing power and session capacity.

The series targets the enterprise perimeter, internet edge, and data-center segmentation. Every model shares the same feature set and interface layout, so the decision reduces to inspected throughput, connection capacity, and growth headroom rather than a different operating model per tier.

Common features across all models

  • Firepower Threat Defense (FTD) or ASA software
  • Advanced Malware Protection (AMP)
  • Intrusion Prevention System (IPS)
  • URL filtering and application visibility
  • SSL/TLS decryption and inspection
  • High availability (Active/Standby or Active/Active)
  • Centralized management via Firepower Management Center (FMC)
  • Cisco Talos threat intelligence integration

Model Comparison

Quick Answer: Match the model to your throughput and deployment scale, not list price alone. The 4215 suits branch and small-campus edges, the 4225 balances most enterprise cores, the 4245 adds SSL-inspection headroom for internet edges, and the 4255 targets service-provider and carrier-grade traffic volumes.

Positioning and lead times at a glance — full performance numbers follow in the next table.

ModelSKUBest forOfficial lead timeOur lead time
Secure Firewall 4215FPR4215Branch / small campus, 10-25G uplinks35 days10 days
Secure Firewall 4225FPR4225Balanced enterprise core38 days12 days
Secure Firewall 4245FPR4245Internet edge with SSL inspection42 days14 days
Secure Firewall 4255FPR4255Service provider / carrier-grade45 days17 days

Need part-level detail? See the FPR4245 ASA specs and part numbers.

Performance Comparison

Quick Answer: All four appliances share a 1RU chassis with eight 10GbE SFP+ and two 25GbE SFP28 ports; they differ in firewall throughput from 35 to 50 Gbps, IPS from 20 to 30 Gbps, and connection capacity. Real-world throughput with full inspection runs near half the firewall figure.

Choose on throughput and budget. All models share the same interface layout but differ in processing power.

SpecificationFPR4215FPR4225FPR4245FPR4255
Firewall throughput35 Gbps40 Gbps45 Gbps50 Gbps
IPS throughput20 Gbps25 Gbps25 Gbps30 Gbps
VPN throughput10 Gbps12 Gbps15 Gbps18 Gbps
Max connections10 million12 million15 million18 million
New conn/sec150,000180,000200,000250,000
10GbE ports8x SFP+ (all models)
25GbE ports2x SFP28 (all models)
Form factor1RU (all models)
Lead time (official)35 days38 days42 days45 days
Lead time (our channels)10 days12 days14 days17 days

Which Model Should You Choose?

Quick Answer: Select on peak traffic, inspection depth, and growth headroom. Size firewall throughput to roughly twice your expected inspected load so SSL decryption and IPS never saturate the box. Standardize on one management model — Firepower Management Center — across sites, then scale the appliance tier per location.

ScenarioRecommendedWhyTypical configEst. cost (USD/pair, 3yr)
Branch / small campus (100-500 users)FPR421535 Gbps handles branch traffic with growth headroom; 10GbE uplinks fit sub-10G WANActive/Standby HA, basic IPS, URL filtering$25K-35K
Mid-size data center (500-2000 users)FPR422540 Gbps balances performance and cost; SSL inspection for most enterprise workloadsActive/Active HA, full IPS, AMP, SSL decryption$35K-50K
Large enterprise / internet edge (2000+ users)FPR424545 Gbps with 25 Gbps IPS holds up under heavy SSL; 25GbE uplinks for multi-gig circuitsActive/Active HA, full threat stack, Talos$50K-70K
Service provider / hyperscale (10K+ users)FPR425550 Gbps carrier-grade volume; 30 Gbps IPS holds during spikes and DDoSMultiple HA pairs, geo-redundancy, advanced analytics$70K-100K

Estimated ranges are indicative for planning only — confirm current pricing and licensing on the quote.

Key Features

Quick Answer: Every model unifies firewall, IPS, Advanced Malware Protection, URL filtering, and application control on one platform, managed centrally through Firepower Management Center. Flexible FTD or ASA software modes, Cisco Talos threat intelligence, and Active/Standby or Active/Active high availability let one interface layout standardize security across every site.

FeatureWhat it does
Unified threat managementFirewall, IPS, AMP, URL filtering, and application control on one platform — less complexity than a multi-vendor stack
Flexible software modesRun FTD for next-gen features or ASA for traditional policies; switch by software reimage with no hardware change
Scalable performance35 to 50 Gbps firewall throughput across the series on one interface layout, simplifying standardization
Advanced threat protectionCisco Talos intelligence, sandboxing via Threat Grid, and retrospective security catch threats signatures miss
High availabilityActive/Standby or Active/Active with sub-second, stateful failover that preserves connections
Centralized managementFirepower Management Center manages thousands of firewalls with consistent policy across sites

Frequently Asked Questions

Quick Answer: Common questions cover the difference between FTD and ASA modes, whether models can be mixed in a high-availability pair, the need for Firepower Management Center, and how firewall throughput differs from IPS throughput. Confirm software mode, licensing, and matched models on every quote before ordering.

Firepower Threat Defense (FTD) is the next-generation platform with integrated IPS, AMP, and URL filtering managed via FMC. ASA mode runs traditional firewall software with an optional IPS module, managed via ASDM. FTD is recommended for new deployments; ASA mode suits customers with existing ASA policies.

No. These are different hardware platforms. However, all models share the same management (FMC) and policy structure, so migrating configurations is straightforward. Plan for your 3-5 year throughput needs upfront and standardize the tier per site.

FMC is required for FTD mode and recommended for managing multiple firewalls. Single ASA-mode firewalls can use local management (ASDM), but you lose centralized policy and reporting. FMC is available as a hardware appliance, virtual appliance, or cloud-delivered (FMCv).

Firewall throughput is stateful inspection without deep packet inspection. IPS throughput includes full threat detection (signatures, anomaly detection, protocol analysis). Real-world performance with all features enabled is typically 50-60 percent of the firewall throughput figure.

No. HA pairs must be identical models with matching software versions and licenses. You can, however, run different models at different sites, all managed by the same Firepower Management Center for consistent policy.

Key Takeaway: One 1RU interface layout spans the 35 Gbps 4215 through the 50 Gbps 4255, so you standardise management and change only the appliance tier per site. Size to roughly twice your inspected throughput, confirm FTD or ASA mode, and match HA pairs before freezing the BOM. BENQUAN GLOBAL LIMITED supplies the Cisco Firepower 4200 Series with competitive pricing.

Not sure which Firepower 4200 model fits?

Share your throughput target, SSL-inspection needs, and HA design for a free compatibility and delivery risk assessment. BENQUAN validates part numbers and stock options.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk