Quick Take
Quick Take: 2288 V8 is the xFusion FusionServer 2U two-socket Xeon 6 rack server. Datasheet: two Intel Xeon 6 6700P / 6500P / 6700E processors with TDP up to 350 W, 32 memory slots for DDR5 up to 6400 MT/s or MRDIMM up to 8000 MT/s, PCIe 5.0, 2x OCP 3.0. Public chassis code 0231YFNL is the 8x 2.5-inch SAS/SATA pass-through 2288 V8-S8AAF class — not a complete BOM. Intel 6745P 32-core on one quote is a P-core option, not every V8 build.
What 2288 V8 is
Quick Answer: There is no H in this MPN. 2288 V8 is Xeon 6. 2288H V7 is 4th/5th Gen Xeon Scalable. DIMM speed and CPU socket rules differ. Empty 8x 2.5-inch bays are not disks. Do not paste R670 (Dell 1U Xeon 6) or 2258H V8 (AMD) onto this column.
Typical scene: a 2U Xeon 6 brief already printed 2288 V8 / 0231YFNL. The trap is quoting 2288H V7 because the digits match, quoting 2258H V8 because both are V8, or ranking R670 because both say Xeon 6. 1U Dell is not 2U xFusion. 1500 W PSU, 25G OCP, and RAID are lines, not implied by S8AAF.
Public part numbers belong on the RFQ. Quote list, net, discount percent, and totals do not belong on this page. If a seller pastes a channel number into chat, treat it as industry estimate / pending confirmation until the formal brief comes back.
Family pages still matter for the ladder. This page answers one question: how to freeze 2288 V8 without mixing a different class onto the same column. Related family reading: FusionServer 2288H V7 (previous Intel 2U, not this PID).
Specifications
Quick Answer: Published 2288 V8 facts: 2U two-socket, 2x Intel Xeon 6 6700P/6500P/6700E up to 350 W, 32x DDR5 up to 6400 MT/s or MRDIMM 8000 MT/s, 8/16/24x 2.5-inch class maps, 2x OCP 3.0, PCIe 5.0, dual M.2. Chassis 0231YFNL = 8x 2.5-inch pass-through. Channel net stays pending confirmation.
- MPN
- 2288 V8
- Chassis
- 0231YFNL / V8-S8AAF class
- Form
- 2U two-socket rack
- CPU
- 2x Intel Xeon 6 6700P/6500P/6700E
- Memory
- 32x DDR5 up to 6400 MT/s
- Drive map
- 8x 2.5-inch pass-through class
- I/O
- 2x OCP 3.0 + PCIe 5.0
- Not this SKU
- 2288H V7 / 2258H V8 / R670
Ceiling numbers follow the FusionServer 2288 V8 datasheet. Write P-core vs E-core (6700P vs 6700E) on the brief. 0231YFNL is the 8-bay chassis, not the populated server.
Numbers without a unit on a seller slide are not specs. Gbps, watts, session counts, and years must travel with the MPN. If your PAN-OS, IOS XE, or firmware train differs from the cited datasheet generation, write that train on the RFQ instead of copying a screenshot.
Fit / Unfit
Quick Answer: Use 2288 V8 when the brief named the FusionServer 2U Xeon 6 (0231YFNL class). Use 2288H V7 for the previous Intel 2U. Use 2258H V8 for AMD V8. Use R670 only as an honest 1U Dell Xeon 6 column. Confirm quantity, HA, software train, and support years on the same brief before you freeze CapEx. Channel net stays pending confirmation.
Fit
- 2U Xeon 6 FusionServer RFQ that named 2288 V8 or 0231YFNL
- Need Intel Xeon 6 in 2U xFusion, not 2288H V7
- CPU series (6700P/E), DIMM, 2.5-inch fill, OCP, PSU as lines
- Honest R670 column only as a second SKU
Do not use it as
- A silent substitute for FusionServer 2288H V7
- A silent substitute for FusionServer 2258H V8 (AMD)
- A silent substitute for PowerEdge R670 (1U Dell)
- A chassis-only 0231YFNL cell counted as a full server
Fit/unfit is the decision tree for 2288 V8. If the site sits on the boundary, keep this MPN on its own line and add the step-up MPN as a second column with equal assumptions. Do not hide both in one “or equivalent” cell.
Typical RFQ scene
Quick Answer: Typical scene: a 2U Xeon 6 brief already printed 2288 V8 / 0231YFNL. The trap is quoting 2288H V7 because the digits match, quoting 2258H V8 because both are V8, or ranking R670 because both say Xeon 6. 1U Dell is not 2U xFusion. 1500 W PSU, 25G OCP, and RAID are lines, not implied by S8AAF.
Label this as a typical scene, not a named customer. The MPN is already on the sheet. The cost of leaving adjacent lines blank is a dead on-site: missing optics, missing HA peer, or a stack that will not form. Write those lines before anyone ranks a discount.
If a second brand sits on the same workbook, keep 2288 V8 on its own column with equal threat, session, or stack assumptions. “Or equivalent” cells hide the fork this page exists to freeze.
Ordering lines
Quick Answer: Hardware MPN is public. Subscriptions, support, optics, and HA peers are separate lines. This table names the rows — it does not publish prices. Confirm quantity, HA, software train, and support years on the same brief before you freeze CapEx. Channel net stays pending confirmation.
Industry estimate / pending confirmation. Public pages never show negotiated net.
| Line | SKU to freeze | Why it sits on the RFQ |
|---|---|---|
| Chassis | 0231YFNL / 2288 V8-S8AAF class | 8x 2.5-inch pass-through |
| CPU | Xeon 6 6700P/6500P/6700E x2 | 6745P is one option |
| Memory | DDR5 or MRDIMM size x count | 32 slots |
| Media | 2.5-inch fill | Empty is empty |
| NIC / RAID | OCP + PCIe PIDs | Slots are empty |
| PSU | Wattage + redundant | Write both units |
Copy 2288 V8 with the copy control in the hero if you are pasting into a spreadsheet. Adjacent lines that are support-only SKUs do not get their own article in this batch; they stay on this table.
How to RFQ 2288 V8
Quick Answer: Send one brief: MPN 2288 V8, quantity, HA, software train, adjacent optics or licenses, support years, and delivery week. Equalize a second vendor column before you rank. Confirm quantity, HA, software train, and support years on the same brief before you freeze CapEx. Channel net stays pending confirmation.
- Step 1. Copy 2288 V8 — not a family nickname.
- Step 2. Write quantity and HA. Two-node means two hardware lines.
- Step 3. Add optics, modules, and subscription years from the drawing.
- Step 4. If a peer vendor sits on the sheet, equalize threat/SSL or stack rules.
- Step 5. Submit on rfq.html?intent=bom-risk.
Do not attach a customer quote PDF to a public ticket that will be mirrored onto a website. Strip prices before any file leaves the mail thread into HTML.
Worldwide shipping and free-port staging are BQ motions. They are not a promise of stock on this page. Lead time stays on the RFQ as pending confirmation.
FAQ
Quick Answer: 2288 V8 is one hardware MPN. Family datasheets stay on the series page. This page freezes the RFQ row without publishing quote prices. Confirm quantity, HA, software train, and support years on the same brief before you freeze CapEx. Channel net stays pending confirmation.
No. 2288 V8 is Intel Xeon 6. 2288H V7 is 4th/5th Gen Xeon Scalable. The H and the generation both matter.
No. R670 is Dell 1U Xeon 6. 2288 V8 is xFusion 2U Xeon 6. Keep two columns if both sit on the sheet.
Quote list, net, and discount stay off public pages. Channel figures are industry estimate / pending confirmation on the RFQ.
References
Quick Answer: Specs on this page follow vendor datasheets and hardware references. Open those URLs for the PDF generation you are quoting. Standalone BENQUAN family articles sit under Related, not here. Confirm quantity, HA, software train, and support years on the same brief before you freeze CapEx. Channel net stays pending confirmation.
Key Takeaway
Key Takeaway: Freeze 2288 V8 as the FusionServer 2U Xeon 6 chassis (0231YFNL class), then write 6700P vs 6700E, DIMMs, 2.5-inch fill, OCP, and PSU. Do not paste 2288H V7 or R670. BENQUAN GLOBAL LIMITED supplies 2288 V8 with competitive pricing and configuration support.