Quick Take
Quick Take: WatchGuard ends sale of Firebox M290 on August 1, 2026; successor is M295. Support on installed M290 runs to July 1, 2031; renewals stay available. New rackmounts need separate power cords. Last-buy only for identical config — otherwise RFQ M295 with suite years matched. BENQUAN GLOBAL LIMITED supplies Firebox and peer NGFW options with worldwide shipping.
Buyer Decision Matrix
Quick Answer: Take a last buy on the M290 only when the configuration must stay identical and the delivery date clears before end of sale in writing. Otherwise standardize on the M295 with matched suite tiers and years, and run a dual path when capital cost or operations fit is genuinely disputed.
*Dates and successor from WatchGuard’s official M290 end-of-sale notice (June 29, 2026). Confirm SKUs and lead time on your dated distributor quote.
Related context: Sophos XGS July list move · firewall renewal SKU trap · FortiGate F-series migrate · 2026 vendor calendar.
| Situation | Hardware posture | License posture | RFQ ask |
|---|---|---|---|
| PO ships before Aug 1 | M290 last-buy OK | Match suite years now | Written ATP + quote expiry |
| Ship date slips past EOS | Rewrite to M295 | Remap Total/Basic/Support SKUs | Side-by-side M290 PDF vs M295 |
| New site / new install | M295 default | Equalize suite to peers | Add power cord + HA if needed |
| Installed M290 fleet | Keep running | Renewals still available | Spare policy + EOL 2031 plan |
| Ops fit disputed | Three-column shortlist | Year-match support | Fortinet / Sophos / Palo Alto dual-path |
What the Deadline Actually Means
Quick Answer: After August 1, 2026 WatchGuard removes the M290 from the price list for new purchases, with the M295 as the stated replacement. Renewals on previously purchased M290 hardware continue until the 2031 support cutoff, and new-install service SKUs tied to the M290 follow the same end-of-sale gate.
- EOS ≠ EOL — You can keep running M290 with renewals until July 1, 2031 support cutoff.
- New projects need M295 — Or a dual-path peer (Fortinet / Sophos / Palo Alto) if ops fit wins.
- Sibling models already moved — M590 / M690 left sale earlier in 2026 (M495 / M595–M695 successors). Treat mid-market Firebox refreshes as one program, not three orphan POs.
Official successor language
WatchGuard’s notice: M290 is replaced by M295. New rackmount Firebox models announced October 2025 brought higher performance — but do not ship with power cords. Country-specific cords must be ordered as separate line items or sites arrive “dead on arrival” for install day.
Who Gets Hit Hardest
Quick Answer: Branch fleets and managed service providers with open M290 carts, high availability pairs and multi-year security suite attachments feel capital and licensing rewrites in the same week once quotes age past August 1. Trade-up and detection attachments must be remapped rather than copied from old paperwork.
- Open M290 POs without ship confirmation — Risk automatic SKU swap mid-approval.
- Standardized M290 image / template — Last-buy only if cutover cost exceeds holding a small spare pool.
- Trade-up and NDR attaches — Must remap WGM290* / WGN290* to M295 peers, not copy-paste old PDFs.
SKU Map & Procurement Traps
Quick Answer: Map appliance-only, security suite, standard support, high availability, trade-up and detection lines from the M290 pattern to the M295 equivalents. Never strip a suite tier to reduce capital cost, because that is a different product. New rackmount models also need a country power cord as a separate line.
| Legacy pattern (M290) | Successor pattern (M295) | Buyer check |
|---|---|---|
| WGM290000 (appliance only) | WGM295000 | Confirm HA and cord lines |
| WGM2900080x Total Security | WGM2950080x | Match 1-yr / 3-yr term |
| WGM2900070x Basic Security | WGM2950070x | Do not mix tiers across vendors |
| WGM2900060x Standard Support | WGM2950060x | Equalize years on dual-path |
| WGM2900160x HA | WGM2950160x | Pair count = site failover plan |
| WGN2902220x NDR | WGN2952220x | Confirm attach still required |
Three traps that break cutover
- Missing power cord — New rackmounts: country cord is a separate SKU.
- Suite mismatch — Comparing Total Security M290 to Basic-only peer quotes is not a fair TCO.
- Stale Trade Up codes — Remap WGM29002* Trade Up lines to M295 equivalents before finance approves.
Actions Before August 1
Quick Answer: Freeze every open M290 cart, decide between a last buy and the M295, remap suite tiers and high availability lines, add country power cords explicitly, dual-quote peer vendors on the same throughput brief, then raise the order with acceptance criteria and a dated delivery commitment.
- Inventory open quotes — Any WGM290* line with ship risk after Aug 1 gets rewritten now.
- Pick posture — Last-buy M290 only with written ATP; else standardize M295.
- Match suites — Total / Basic / Standard years identical across columns.
- Add cords + HA — Explicit line items; no “assume in box.”
- Dual-path — FortiGate / Sophos XGS / Palo Alto on the same throughput and VPN brief — see Sophos July list and FortiGate migrate.
- Pre-PO validate — Wrong cord or license still kills install day — pre-PO checklist.
RFQ Checklist — M290 / M295 Window
Quick Answer: Send the site count, whether the preference is a last buy or the M295, suite tier and term years, high availability pair count, detection attachment needs, country power cord quantity, go-live date and a peer vendor brief. Ask for quote expiry and a dated delivery commitment on every line.
What to put on the RFQ
- Sites still needing new Firebox installs before / after Aug 1
- Preference: M290 last-buy (with ATP) vs M295 standard
- Suite: Total Security / Basic / Standard Support + term years
- HA pair count; failover test requirement
- NDR or Trade Up attaches (yes/no + years)
- Country-specific power cord quantity
- Alternate OEMs: Fortinet, Sophos XGS, Palo Alto peer BOM
- Lead time: stock vs ATP; quote validity window
Use SKU Lookup, then submit the dual-vendor brief on rfq.html.
Frequently Asked Questions
Quick Answer: The M290 leaves sale on August 1, 2026 with the M295 as successor, while renewals on installed units continue through the 2031 end of life. Distributor stock may clear earlier, so do not plan a project on informal availability. Remap SKUs, add power cords, and dual-path peers.
WatchGuard posted the M290 end-of-sale announcement. Last sale was 1 August 2026; support runs through 1 July 2031; the listed replacement is M295. This page is the refresh RFQ — M290 versus M295 plus country power-cord SKUs — so you do not order a dead chassis.
Treat August 1, 2026 as the official end-of-sale. Distributor stock may clear earlier. Do not plan a project on hallway “we can still get a few.”
Installed M290 can renew to 2031. New installs and slipped POs should standardize on M295 unless a dual-path peer wins on ops and TCO.
WatchGuard states new rackmount Firebox models do not include power cords. Missing cords create install-day failures that look like “hardware defects.”
Send the security brief via RFQ.
Key Takeaway
Key Takeaway: Firebox M290 buyers have a hard August 1, 2026 EOS. Win on last-buy ATP or clean M295 SKU maps — suites matched, cords on the PO, peers dual-quoted. BENQUAN GLOBAL LIMITED supplies Firebox and NGFW peers with competitive pricing and configuration support for global buyers.