Fibre Channel SAN / Procurement

Is the TGStor quote the whole Gen6 to Gen8 lineup?

Q4 2026 TGStor product path: G610 / G630, G710 / G720 / G730, X7-4 / X7-8, G820, and X8-4 / X8-8. Same ASIC generations as Dell Connectrix names. Commercial MPNs stay in the appendix.

Quick Take

Quick Take: TGStor is a full Fibre Channel SAN lineup, not a single G720 kit: Gen6 G610 and G630, Gen7 G710 through G730 plus X7-4 and X7-8, and Gen8 G820 plus X8-4 and X8-8. Q4 2026 has no G620, no 7850, and no X6 director. Freeze the product name first, then search TG- codes on SKU Lookup.

All port floors, ceilings, and latency claims below are attributed to TGStor / Huacun Zhigu English datasheets and the May 2025 white paper. Soft channel prices and lead times are industry estimate / pending confirmation — this page publishes no list prices.

What TGStor FC SAN Means for Buyers

Quick Answer: TGStor Fibre Channel SAN is Huacun Zhigu’s full fabric switch path: G610 and G630 at 32G, G710 through G730 plus both X7 directors at 64G, and G820 plus both X8 directors at 128G. Same ASIC generations as Dell Connectrix names. It is not Huawei SNS and not a legal Broadcom-authorization claim.

Definition: A TGStor FC SAN RFQ is a Fibre Channel fabric buy — not an Ethernet IP-SAN appliance brief, and not a one-SKU G720 essay. The Q4 2026 catalogue is three generations on one page: Gen6 fixed (G610 / G630), Gen7 fixed plus directors (G710 / G720 / G730 / X7-4 / X7-8), and Gen8 (G820 / X8-4 / X8-8). The buying fork is generation, form factor, and how many ports are licensed today versus reserved via Ports on Demand (PoD).

  • Fit this page: FC SAN refresh that must shortlist the whole TGStor catalogue against Cisco MDS or Broadcom OEM columns on one equal-BOM brief.
  • Boundary: Ethernet-only IP SAN; inventing public list prices; inventing TGStor G620 / 7850 / X6 names; asserting unauthorized “official Broadcom OEM” legal status.

Company identity on quotes should follow the seller of record. Product branding on the English datasheets is TGStor; the legal entity named on those sheets is Sichuan Huacun Zhigu Technology Co., Ltd. Use official product pages at tgstor.cn when validating model families before PO. TGStor is a peer ordering path on the Gen 7 and Gen 8 OEM maps, the same layer as Dell Connectrix product names — see the Brocade Gen 7 lineup and the Gen 8 G820 / X8 map.

Official Full-Lineup Hardware Map

Quick Answer: Ten TGStor product names cover the Q4 2026 fabric path: G610, G630, G710, G720, G730, X7-4, X7-8, G820, X8-4, and X8-8. Write those names the way Dell writes DS-7720B or ED-DCX7-4B. Do not mix a Dell SKU and a TGStor product on one purchase order.

TGStor Fibre Channel full lineup map: G610 G630 Gen6, G710 G720 G730 X7-4 X7-8 Gen7, G820 X8-4 X8-8 Gen8. No G620, no 7850, no X6.
Figure 1. TGStor Q4 2026 product names across three generations. Unique BQ composition, 2026-08-27. Commercial TG- codes sit in the appendix.

The table is TGStor-first. Dell / Broadcom columns are the same ASIC generation, not extra products and not a legal authorization stamp. DS-7720B is not TGStor G720. DS-8820B is not TGStor G820.

ClassTGStorDell alias (same ASIC)BroadcomSpeed
Entry Gen6G610—G61032G
Dense Gen6G630—G63032G
Entry Gen7G710DS-7710BG71064G
Mid Gen7G720DS-7720BG72064G
Dense Gen7G730DS-7730BG73064G
Director 8UX7-4ED-DCX7-4BX7-464G
Director 14UX7-8ED-DCX7-8BX7-864G
Fixed Gen8G820DS-8820BG820128G
Director 9UX8-4ED-DCX8-4BX8-4128G
Director 14UX8-8ED-DCX8-8BX8-8128G

Not on This Q4 2026 Line

Quick Answer: The Q4 2026 TGStor list has no G620, no 7850 extension switch, and no X6 director chassis. Gen6 fixed names stop at G610 and G630. The TGStor director product is X7, not X6. Do not invent those three names on the RFQ.

Missing nameWhy buyers askWhat to write instead
G620Huawei SNS3664 maps to G620TGStor G610 (entry) or G630 (dense)
7850Broadcom / Dell MP-7850B sits on Gen7 mapsnot listed — no TGStor 7850
X6-4 / X6-8SNS560x / 570x directors are X6 classTGStor X7-4 / X7-8, not X6

SNS remains Huawei OceanStor SNS. Do not treat a TGStor product name as an SNS commercial code, and do not paste Huawei 0235… strings onto this catalogue.

Lineup Numbers — Ports, PoD, Form Factor

Quick Answer: Gen6 floors sit at G610 8→24 and G630 48→128 at 32G. Gen7 floors sit at G710 8→24, G720 24→64, and G730 48→128 at 64G. Gen8 G820 is 24→56 with no SFP-DD. X7 and X8 directors scale by blade mix — quote blades, ICL, fans, and PSUs separately.

The table below uses English datasheet wording. Where an intro deck conflicts with a datasheet, prefer the datasheet. G720 maximum is 64 ports (not a higher marketing ceiling).

Model Gen Form PoD floor → ceiling Physical ports / media Speed class
G610 Gen 6 Entry fixed 8 → 24 Up to 24× SFP+ 4/8/16/32G
G630 Gen 6 2U fixed 48 → 128 96×32G SFP+ + 8×(4×32G) Q-Flex 32G NVMe-ready
G710 Gen 7 1U entry 8 → 24 24×64G SFP+ 64G
G720 Gen 7 1U 24 → 64 48×64G SFP+ + 8×2×64G SFP-DD 64G
G730 Gen 7 2U 48 → 128 96× SFP+ + 16× SFP-DD 64G
X7-4 Gen 7 director 8U / 4 blade slots Blade-dependent Up to 192×64G or 256×32G; 16 UltraScale ICL → 64 ICL ports 32G / 64G blades
X7-8 Gen 7 director 14U / 8 blade slots Blade-dependent Up to 384×64G (higher density with FC64-64); 32 UltraScale ICL → 128 ICL ports 32G / 64G blades
G820 Gen 8 1U 24 → 56 56×128G SFP+; no SFP-DD 128G (64G ship optics still Gen 8)
X8-4 Gen 8 director 9U / 4 blade slots Blade-dependent Up to 192×128G plus UltraScale ICL (OSFP) 64G / 128G blades
X8-8 Gen 8 director 14U / 8 blade slots Blade-dependent Up to 384×128G plus UltraScale ICL (OSFP) 64G / 128G blades
  • G610 ISL trunk (vendor): up to 8×32G SFP+ combined as a 256Gb/s-class trunk.
  • G720 SFP-DD: each SFP-DD transceiver delivers 2 ports; SFP-DD cages also accept SFP+ optics per datasheet.
  • G730 SFP-DD speeds (vendor): 2×64/32/16G or 64/32/16/8G depending on transceiver.
  • X7 blades cited: FC64-48, FC64-64, FC32-X7-48, FC32-48, SX6 Extension; AnyIO / Unified Storage Fabric on a subset of FC64-48 ports.
  • G820 scale: 24 base plus four 8-port SFP+ PoD kits to 56. That is not the Gen7 G720 24/64 SFP-DD path.
  • X8 blades cited: FC128-48 class (64G or 128G SFP+). Empty TG-X84-0002-Z / TG-X88-0002-Z kits still need fans, PSUs, and port blades.
  • Latency claim (attribute): X7 datasheet states about 50% lower latency versus the previous generation — treat as vendor performance claim, not a third-party lab result.

Q4 2026 TG-STOR MPNs — Searchable Commercial Codes

Quick Answer: The Q4 2026 TG-STOR list publishes 146 commercial MPNs with descriptions and no public net price. Search TG-G720-24-64G-R-Z, TG-X78-0002-Z, TG-G710-8-64G-0-L, or TG-G820-24-64G-R-Z on SKU Lookup, then send the matched part list to RFQ. Do not treat these strings as Dell, HPE, IBM, or Huawei codes.

These are TGStor / Huacun Zhigu channel codes from the Q4 2026 OEM list. Use them to search, freeze a BOM, and RFQ. Empty director kits still need fans, PSUs, and port blades. 24-port G720 kits still need Ports on Demand to reach 64. Soft channel prices stay industry estimate / pending confirmation.

Open TGStor on SKU Lookup to search any TG- or XTG- string on this table.

FamilyTG-STOR MPNDescription
G610
G610TG-G610-8-16G-5-LG610 Switch 8P,8x16Gb SW SFP,LIFETIME
G610TG-G610-24-16G-5-LG610 Switch 24P,24x16Gb SW SFP,ESB,LTW
G610TG-G610-8-32G-5-LG610 Switch 8P,8x32Gb SW SFP,LIFETIME
G610TG-G610-24-32G-5-LG610 Switch 24P,24x32Gb SW SFP,ESB,LTW
G610TG-SMED8PTPOD-16GS/W, 8 PORT-ON-DEMAND License with 8 X 16G SWL SFP's
G610TG-SMED8PTPOD-32GS/W, 8 PORT-ON-DEMAND License with 8 X 32G SWL SFP's
G610TG-SMEDEB4-01S/W ENT BUNDLE, G610
G610XTG-G610-8-5FRU, G610,8-PRT LICENSE,NO SFPs,1PSU
G610XTG-G610-24-5FRU, G610,24-PRT LICENSE,NO SFPs,1PSU
G630
G630TG-G630-48-32G-R-1-ZG630,48P 32G,SWL SFP,AC,PRTSD EXH
G630TG-G630-96-32G-R-1-ZG630,96P 32G,SWL SFP,AC,ENT BUN,PRTSD EX
G630TG-MENT24PTPOD-32GS/W 24 PORT ON DEMAND W/ 24 32G SWL SFP
G630TG-MENT32QFLEX-32GS/W 32 PORT ON DEMAND W/ 8 32G SWL QSFP
G630TG-MENTEB5-01S/W, ENTERPRISE BUNDLE (TRK, FV, EF)
G630TG-MENTIR-01-ZINTEGRATED ROUTING
G630XTG-G630-48-R-1FRU G630 48P,AC,PRTSD EXH
G630XTG-G630-96-R-1FRU G630 48P,AC,ENT BUN PRTSD EXH
G630XTG-ENT-FAN-80-RFRU FAN, 80MM, PRTSD EXH
G630XTG-1500WPSAC-RFRU 1500W PSAC,PRTSD EXH
G710
G710TG-G710-8-32G-0-LG710,8P,32GB SWL SFP,BR,AC
G710TG-G710-8-64G-0-LG710,8P,64GB SWL SFP,BR,AC
G710TG-SMED8G7POD-32GS/W, 8 PORT-ON-DEMAND, W/ 8 X 32G SWL
G710TG-SMED8G7POD-64GS/W, 8 PORT-ON-DEMAND, W/ 8 X 64G SWL
G710XTG-G710-8-0FRU,G710,8P,BR,AC
G720
G720TG-G720-24-32G-R-ZG720,24P,32G SWL SFP,AC,PORTSD EXH, ENT
G720TG-G720-24-64G-R-ZG720,24P,64G SWL SFP,AC,PORTSD EXH, ENT
G720TG-MIDR8PTPOD-32GS/W 8 PORT ON DMD W 8 32G SWL SECURE SFP
G720TG-MIDR8PTPOD-64GS/W 8 PORT ON DMD W 8 64G SWL SECURE SFP
G720TG-MIDR16DDG7POD-64GS/W 16 PORT-ON-DEMAND, WITH 8 BR 64G SWL SFP-DDs FOR GEN 7 MIDRANGE SWITCH
G720XTG-G720-24-RFRU G720 24P,BR,AC,PRTSD EXH
G720XTG-G350WPSAC-RFRU,350W,ACPS/FAN,PORT SIDE EXHAUST
G730
G730TG-G730-48-64G-R-ZG730,48P,64G SWL SFP,AC,PORTSD EXH, ENT
G730TG-MENT24G7POD-64GS/W, 24 PORT-ON-DEMAND, WITH 24 BR 64G SWL SFPs FOR GEN 7 ENTERPRISE SWITCH
G730TG-MENT32DDG7POD-64GS/W 32 PORT-ON-DEMAND, WITH 16 BR 64G SWL SFP-DDs FOR GEN 7 ENTERPRISE SWITCH
G730XTG-1100WPSAC-RFRU,1100W PSAC,PORTSIDE EXHAUST AF
G730XTG-ENT-FAN-80-R-2FRU FAN, 80MM, PRTSD EXH, V2
G730XTG-G730-48-RFRU G730 48P,BR,AC,PRTSD EXH
X7 Director
X7 DirectorTG-X74-0002-ZX7-4,0PSU,0FAN,2CP,2CORE,0P,0SFP,EB
X7 DirectorTG-X78-0002-ZX7-8,0PSU,0FAN,2CP,2CORE,0P,0SFP,EB
X7 DirectorTG-X764-1148PORT BLADE,FC64-48,48P,48 32G SWL SFP,BR
X7 DirectorTG-X732-2148PORT BLADE,FC32-X7-48,48P, 48 32G SFP+,BR
X7 DirectorTG-X764-2148PORT BLADE,FC64-48,48 64G SWL SFP+,BR
X7 DirectorTG-X764-3148PORT BLADE,FC64-48,48 32G LWL SFP+,BR
X7 DirectorTG-X764-5148PORT BLADE,FC64-48,48 64G LWL SFP+,BR
X7 DirectorTG-X764-2164PORT BLADE,FC64-64,32X64G SWL SFP-DDs,BR
X7 DirectorTG-SX6-0001-ZSX6,EXTBLD,16 32G SWL SFPS, 01/10/40/GBE
X7 DirectorTG-SX6-0002-ZSX6,EXTBLD,16 32G LWL SFPS, 01/10/40/GBE
X7 DirectorTG-X6-RACNPIPSU-0104UPGRADE 1 PSU,NPI,3000W,240V AC INPUT
X7 DirectorTG-X6-HVNPIPSU-0104UPG 1 HV PSU,NPI,3000W,240-380VDC,277VAC
X7 DirectorTG-X6-FANNPI-0122UPGRADE 1 FAN TRAY, NPI
X7 DirectorTG-X7ICLKIT-100M-01-ZX7 ICL POD KIT, 8 GEN 7 ICL QSFPS
X7 DirectorTG-X7GEN6ICLKIT-100M-1-ZX7 32G ICL KIT, LIC+8 4X32G QSFPS 100M
X7 DirectorTG-X7ICLKIT-2KM-01-ZX7 2KM ICL POD KIT, 8 GEN7 2KM ICL QSFPS
X7 DirectorXTG-X78-0010FRU,X7-8 CHASSIS, AIRFLOW AGNOSTIC, BR
X7 DirectorXTG-X78-0106FRU,X7-8,CR64-8,64GB CORE BLADE,BR
X7 DirectorXTG-X74-0010FRU,X7-4 CHASSIS, AIRFLOW AGNOSTIC, BR
X7 DirectorXTG-X74-0106FRU,X7-4,CR64-4,64GB CORE BLADE,BR
X7 DirectorXTG-X6-RACNPIPSU-0104FRU,1 240V AC POWER SUPPLY,3000W,NPI
X7 DirectorXTG-X6-FANNPI-0122FRU,FAN ASSEMBLY,NPI
X7 DirectorXTG-X6-HVNPIPSU-0104FRU,1 HV PSU,NPI,3000W,240-380VDC,277VAC
X7 DirectorXTG-CPX-0103FRU,CPX7,CONTROL PROCESSOR,BR
X7 DirectorXTG-SX6-0000FRU,SX6,EXTENSION, O SFPS
X7 DirectorXTG-X764-0148FRU, PORT BLADE,FC64-48,48P,0 SFP,BR
X7 DirectorXTG-X732-0148FRU, PORT BLADE,FC32-X7-48,48P,0 SFP,BR
X7 DirectorXTG-X764-0164FRU, PORT BLADE,FC64-64,64P,0 SFP-DD,BR
G820 Gen 8
G820 Gen 8TG-G820-24-64G-F-ZG820,24P,64G SWL SEC SFP, AC,NON-PRTSD EXH, Includes 36 months of -Z support.
G820 Gen 8TG-G820-24-64G-R-ZG820,24P,64G SWL SEC SFP, AC,NON-PORTSD INTK, Includes 36 months of -Z support.
G820 Gen 8TG-G820-24-128G-F-ZG820,24P,128G SWL SEC SFP, AC,NON-PRTSD EXH, Includes 36 months of -Z support.
G820 Gen 8TG-G820-24-128G-R-ZG820,24P,128G SWL SEC SFP, AC,NON-PORTSD INTK, Includes 36 months of -Z support.
G820 Gen 8XTG-G820-24-FFRU G820 24P,AC,NON-PRTSD EXH
G820 Gen 8XTG-G820-24-RFRU G820 24P,AC,NON-PRTSD INTK
G820 Gen 8XTG-MIDR8G8POD-64GS/W 8 PORT ON DMD W 8x 64G SWL SECURE SFP
G820 Gen 8XTG-MIDR8G8POD-128GS/W 8 PORT ON DMD W 8x 128G SWL SECURE SFP
G820 Gen 8XTG-G650WPSAC-FFRU,650W,1U,ACPS/FAN,NON-PORT SIDE EXHAUST
G820 Gen 8XTG-G650WPSAC-RFRU,650W,1U,ACPS/FAN,NON-PORT SIDE INTAKE
X8 Director
X8 DirectorTG-X88-0002-ZX8-8,0PSU,0FAN,2CP,2CR,0 ICL,0P (Includes 36 months of -Z) Customer to procure matching fans and PSUs
X8 DirectorTG-X84-0002-ZX8-4,0PSU,0FAN,2CP,2CR,0 ICL,0P (Includes 36 months of -Z) Customer to procure matching fans and PSUs
X8 DirectorTG-X8-1148PORT BLADE,FC128-48,48 64G SWL SFP+,BR
X8 DirectorTG-X8-2148PORT BLADE,FC128-48,48 128G SWL SFP+,BR
X8 DirectorTG-X8-3148PORT BLADE,FC128-48,48 64G LWL SFP+,BR
X8 DirectorTG-X8-5148PORT BLADE,FC128-48,48 128G LWL SFP+,BR
X8 DirectorXTG-X88-0010FRU,X8-8 CHASSIS, AIRFLOW AGNOSTIC
X8 DirectorXTG-X84-0010FRU,X8-4 CHASSIS, AIRFLOW AGNOSTIC
X8 DirectorXTG-X88-0106FRU,X8-8,CR128-8,128GB CORE BLADE
X8 DirectorXTG-X84-0106FRU,X8-4,CR128-4,128GB CORE BLADE
X8 DirectorXTG-CPX8-0103FRU,CPX8,CONTROL PROCESSOR
X8 DirectorXTG-X8-0148FRU,X8 PORT BLADE,48P,X8,0 SFP
X8 DirectorXTG-ICLX88-0108FRU,X8-8,ICL128-8,GEN 8 ICL BLADE,BR
X8 DirectorXTG-ICLX84-0108FRU,X8-4,ICL128-4,GEN 8 ICL BLADE,BR
X8 DirectorTG-X88ICLKIT-100M-01-ZX8-8 ICL KIT,2 BLADES,8 GEN8 ICL SW OSFP
X8 DirectorTG-X88ICLKIT-2KM-01-ZX8-8 ICL KIT,2 BLADES,8 GEN8 ICL LW OSFP
X8 DirectorTG-X84ICLKIT-100M-01-ZX8-4 ICL KIT,2 BLADES,4 GEN8 ICL SW OSFP
X8 DirectorTG-X84ICLKIT-2KM-01-ZX8-4 ICL KIT,2 BLADES,4 GEN8 ICL LW OSFP
X8 DirectorTG-X8ICLUPG-100M-01UPGRADE X8 ICL KIT,4 GEN8 SW OSFP
X8 DirectorTG-X8ICLUPG-2KM-01UPGRADE X8 ICL KIT,4 GEN8 LW OSFP
X8 DirectorTG-X8-RACNPIPSU-0104UPGRADE 1 X8 PSU,NPI,3000W,240V AC INPUT
X8 DirectorTG-X8-RACNPEPSU-0104UPGRADE 1 X8 PSU,NPE,3000W,240V AC INPUT
X8 DirectorTG-X88-FANNPI-0122UPGRADE 1 FAN ASSEMBLY,X8-8,NPI,BR
X8 DirectorTG-X88-FANNPE-0122UPGRADE1 FAN ASSEMBLY,X8-8,NPE,BR
X8 DirectorTG-X84-FANNPI-0122UPGRADE 1 FAN ASSEMBLY,X8-4,NPI,BR
X8 DirectorTG-X84-FANNPE-0122UPGRADE 1 FAN ASSEMBLY,X8-4,NPE,BR
X8 DirectorXTG-X8-RACNPIPSU-0104FRU,1 240V AC POWER SUPPLY,3000W,NPI,BR
X8 DirectorXTG-X8-RACNPEPSU-0104FRU,1 240V AC POWER SUPPLY,3000W,NPE,BR
X8 DirectorXTG-X88-FANNPI-0122FRU,FAN ASSEMBLY,X8-8,NPI,BR
X8 DirectorXTG-X88-FANNPE-0122FRU,FAN ASSEMBLY,X8-8,NPE,BR
X8 DirectorXTG-X84-FANNPI-0122FRU,FAN ASSEMBLY,X8-4,NPI,BR
X8 DirectorXTG-X84-FANNPE-0122FRU,FAN ASSEMBLY,X8-4,NPE,BR
X8 DirectorXTG-X88-0105FRU,X8-8, VERT CABLE MGMT COMB,BR
X8 DirectorXTG-X84-0105FRU,X8-4, VERT CABLE MGMT COMB,BR
X8 DirectorXTG-X8-0128FRU,X8 PORT CARD SLOT FILLER PNL,BR
X8 DirectorXTG-X8-0130FRU,X8 PSU SLOT FILLER PNL,BR
Optics / FRU
Optics / FRUTG-000192FRU,SFP+,SWL,16G,1-PK
Optics / FRUTG-000412FRU,SFP+,SWL,32G,1-PK, SECURE
Optics / FRUTG-000438FRU,SFP+,LWL,32G,10KM,1-PK, SECURE
Optics / FRUTG-000479FRU,SFP+,ELWL,32G,25KM,1-PK,BR,V2,SECURE
Optics / FRUTG-000475FRU,QSFP,SWL,4X32G WITH BREAKOUT,1-PK , SECURE
Optics / FRUTG-000462FRU,SFP+,SWL,64G,1-PK, ,SECURE
Optics / FRUTG-000468FRU,SFP+,LWL,64G,10KM,1-PK,BR,SECURE
Optics / FRUTG-000464FRU,SFP-DD,SWL,64G,1-PK,BR,SECURE
Optics / FRUTG-000466FRU,SFP+,ELWL,64G,25KM,1-PK,BR,SECURE
Optics / FRUTG-000476FRU,QSFP,2KM,GEN 7 ICL,1-PK, BR
Optics / FRUTG-000420FRU,QSFP,SWL,GEN 7 ICL,1-PK, SECURE
Optics / FRUTG-40G-QSFP-ER440GBASE-ER4 QSFP+ (LC),40KM SMF, 1-PK
Optics / FRUTG-E1MG-SX-OM1000BASE-SX, SFP OPTIC, MMF, LC CONN, OP
Optics / FRUTG-E1MG-LX-OM1000BASE-LX, SFP OPTIC, SMF, LC CONN, OP
Optics / FRUTG-000180FRU,SFP+,SR,10G,1-PK
Optics / FRUTG-000182FRU,SFP+,LR,10G,1-PK
Optics / FRUTG-000500FRU,SFP+,SWL,128G,1PK,BR,SECURE
Optics / FRUTG-000501FRU,SFP+,SWL,128G,8PK,BR,SECURE
Optics / FRUTG-000502FRU,OSFP,100M SWL, GEN8 ICL,1PK,BR
Optics / FRUTG-000503FRU,OSFP,2KM LWL, GEN8 ICL,1PK,BR
Optics / FRUTG-000504FRU,SFP+,LWL,128G,10KM,1-PK,BR,SECURE
Optics / FRUTG-000505FRU,SFP+,LWL,128G,10KM,8-PK,BR,SECURE
Optics / FRUTG-000506FRU,SFP+,ELWL,128G,25KM,1-PK,BR,SECURE
Optics / FRUXTG-RMK-0120FRU,4POST RACK MOUNT KIT,27-31 IN,V2,BR
Optics / FRUXTG-RMK-0152FRU,4POST RACK MOUNT KIT,22-27 IN,V2,BR
Optics / FRUXTG-MINIUSBADPT-01FRU,MINI-USB - RJ-45 CONSOLE ADAPTER
SANnav
SANnavTG-SSGV1Y-01-OSUBSANnav Global View 1YR
SANnavTG-SSGV3Y-01-OSUBSANnav Global View 3YR
SANnavTG-SSGV5Y-01-OSUBSANnav Global View 5YR
SANnavTG-SSMPB1Y-01-OSUBSANnav MP Base 1YR 600 Ports, No Dir
SANnavTG-SSMPB3Y-01-OSUBSANnav MP Base 3YR 600 Ports, No Dir
SANnavTG-SSMPB5Y-01-OSUBSANnav MP Base 5YR 600 Ports, No Dir
SANnavTG-SSMPE1Y-01-OSUBSANnav MP Ent 1YR 15K Ports, Dir+Switch
SANnavTG-SSMPE3Y-01-OSUBSANnav MP Ent 3YR 15K Ports, Dir+Switch
SANnavTG-SSMPE5Y-01-OSUBSANnav MP Ent 5YR 15K Ports, Dir+Switch

Gen6 vs Gen7 vs Gen8 — Equal-Assumption Comparison

Quick Answer: Gen6 reuses 32G optics. Gen7 is the 64G G720 / G730 / X7 path. Gen8 is G820 24/56 and X8 directors on 128G. Compare active ports, PoD, optics family, and dual-fabric copies — not stickers alone. Do not call a 64G-populated G820 “Gen7.”

Decision dimension Gen6 (G610/G630) Gen7 (G710/G720/G730/X7) Gen8 (G820/X8)
Best when 32G estate, entry or dense 2U 64G path, SFP-DD density, X7 blades 128G start, 56-port 1U, X8 core
Port ceiling (fixed) 24 / 128 24 / 64 / 128 56 on G820 (no SFP-DD)
Directors none — X6 is not a TGStor product X7-4 / X7-8, QSFP ICL X8-4 / X8-8, OSFP ICL
Optics vocabulary SFP+; Q-Flex on G630 SFP+; SFP-DD on G720/G730 SFP+ 64G or 128G; OSFP ICL
Limitation No native 64G / 128G Not 128G; 7850 not listed G820 stops at 56; empty X8 needs blades

This route’s limit: TGStor lineups do not replace a written HBA/array speed plan. Buying Gen7 or Gen8 switches without matching end-device speed leaves unused optics CapEx on the table. Forcing Gen6 into a 64G-only refresh creates an early forklift. Peer MDS and Broadcom OEM columns only after port counts and optics families match.

TruFOS, SANnav, and Fabric OS Operations

Quick Answer: Vendor Gen7 copy centers on Fabric OS with Secure Boot, Trusted FOS (TruFOS) certificates, hardened FOS (root removed), and SANnav Management Portal / Global View for dashboards and certificate distribution. RFQs must line-item support years and management seats — hardware-only quotes hide upgrade blockers.

Operational language across the English datasheets and white paper (Issue 01, dated 2025-05-30) includes:

  • Fabric OS (FOS) — switch OS; Secure Boot and TruFOS certificates validate integrity and support coverage for critical operations.
  • SANnav Management Portal / Global View — fabric visibility, topology, alerting, and SSL certificate distribution as described in TGStor documentation.
  • Fabric Vision / autonomous SAN — vendor language for analytics, self-learning / self-optimizing / self-healing workflows; D_Port ClearLink diagnostics.
  • Access Gateway (NPIV) — edge mode without consuming a fabric domain ID (default remains full-fabric switch).
  • Trunking, Virtual Fabrics, long-distance buffer-credit modes — confirm which features need licenses on the quote.

White-paper management-stack wording may reference SANnav in a Brocade context. Do not invent OEM legal status on the RFQ; phrase support and tooling exactly as the selling entity warrants. For dual-vendor peers, equalize TruFOS-class support cliffs the same way you equalize Cisco NX-OS / DCNM or MDS tooling years.

Fit / Unfit Decision Tree

Quick Answer: Fit TGStor when the brief needs the full FC catalogue — G610 through X8 — beside MDS or Broadcom OEM peers. Unfit when the buy is Ethernet-only, when buyers demand published list prices, or when the quote must invent G620 / 7850 / X6 or a legal Broadcom-authorization stamp.

Fit

  • FC SAN refresh or expansion with dual-fabric HA.
  • Flash / NVMe-over-FC backend fabrics shortlisting Gen6 32G, Gen7 64G, or Gen8 128G.
  • Dual-vendor RFQ already listing Cisco MDS or Broadcom G720 / G820 / X7 / X8 peers.
  • Need for PoD pay-as-you-grow from documented base ports.

Unfit

  • Ethernet-only IP SAN or pure iSCSI/NVMe-oF TCP briefs with no FC ports.
  • RFQs that require public list prices on this page (omit; request gated quote).
  • Claims of “Brocade rebadge” or identical SKU interchange without written vendor confirmation.
  • Single-fabric production designs that skip Fabric B duplication to “save CapEx.”

How To Build the Equal-BOM RFQ

Quick Answer: Freeze generation first — Gen6, Gen7, or Gen8 — then pick one TGStor product name. Quote PoD, optics, TruFOS/SANnav, and Fabric A/B. Confirm TG- MPNs on SKU Lookup. Peer MDS or Dell/Broadcom columns only after those lines match. Soft prices stay pending confirmation.

  1. Step 1 — Lock generation and form factor. State Gen6, Gen7, or Gen8, then pick G610, G630, G710, G720, G730, X7-4, X7-8, G820, X8-4, or X8-8. Do not invent G620, 7850, or X6.
  2. Step 2 — Itemize PoD floors and ceilings. List base active ports plus every Ports on Demand license required to reach design count. Do not assume maximum ports ship enabled.
  3. Step 3 — Equalize optics and media. Line-item SFP+, SFP-DD (G720/G730 only), Q-Flex (G630), 128G SFP+ (G820/X8), OSFP ICL on X8, and spares. Match 32G / 64G / 128G to HBA and array plans.
  4. Step 4 — Add TruFOS, SANnav, and feature licenses. Include support years, TruFOS certificate coverage, SANnav seats, trunking, Virtual Fabrics, and extension blades if used.
  5. Step 5 — Design dual-fabric HA. Duplicate chassis or directors for Fabric A and Fabric B, balance ISLs, and attach peer MDS / Brocade columns with identical assumptions before CapEx PO.
  6. Step 6 — Look up TG-STOR MPNs. Confirm each TG- or XTG- code on SKU Lookup against the Q4 2026 description, then paste the matched part list into the RFQ. Do not invent Dell, HPE, IBM, or Huawei aliases for these strings.

Common RFQ Pitfalls

Quick Answer: Most TGStor FC quotes fail on silent PoD gaps, missing SFP-DD or 128G optics, inventing G620 / 7850 / X6 names, unequal Fabric B counts, and hardware-only BOMs that omit TruFOS or SANnav. Fix those four gaps before debating chassis stickers on the CapEx sheet.

  • Ceiling without PoD: G720 “64 ports” on a slide is not a 64-port licensed ship set — base is 24 active.
  • Wrong optics family: Quoting only SFP+ when the design needs SFP-DD density or G630 Q-Flex breakouts.
  • Speed honesty: Gen7 chassis with all-32G arrays and no hybrid plan wastes CapEx; Gen6 into a 64G-only refresh creates an early replacement.
  • Invented products: G620, 7850, and X6 are not on the Q4 2026 TGStor line. Write G610/G630, not listed, or X7.
  • Director blade mix: X7 and X8 ceilings depend on blade SKUs — never quote an empty TG-X74 / TG-X78 / TG-X84 / TG-X88 kit without fans, PSUs, blades, and ICL.
  • Wrong commercial code: Searching only G720 or X7-8 without the TG-STOR MPN (TG-G720-24-64G-R-Z / TG-X78-0002-Z) leaves the buyer unable to find the kit on this site or in a channel quote.
  • Latency marketing: The ~50% lower latency claim is vendor datasheet language — put it in the appendix, not as an unverified SLA.

Frequently Asked Questions

Quick Answer: The full line is G610 / G630, G710–G730, X7-4 / X7-8, G820, and X8-4 / X8-8. G720 tops at 64; G820 tops at 56. No G620, 7850, or X6. Search TG- codes on SKU Lookup after the product name is frozen. Line-item TruFOS and SANnav.

Per the TGStor English G710/G720/G730 datasheet, the G720 scales from a 24-port base to a maximum of 64 Fibre Channel ports in 1U via SFP+ and SFP-DD Ports on Demand. Physical layout is 48×64G SFP+ plus 8×2×64G SFP-DD.

Choose Gen6 when end devices and optics stay on 32G and CapEx must reuse existing 32G SFP+. Choose Gen7 when arrays and HBAs justify 64G, or you need Gen7 security and SANnav workflows documented for that generation. Hybrid 32G/64G plans must be written into the RFQ.

Use X7-4 or X7-8 when you need blade modularity, UltraScale ICL chassis interconnect, mixed 32G/64G blades, or director-class scale beyond a single 128-port fixed box. A G730 remains the dense fixed 2U Gen7 building block up to 128 ports.

Yes. Vendor datasheets treat Trusted FOS (TruFOS) certificates and SANnav Management Portal / Global View as operational entitlements tied to support coverage. Equalize support years, TruFOS validity, and SANnav seats on every dual-vendor column before comparing stickers.

Do not invent OEM legal status beyond the PDFs. TGStor documentation describes Fabric OS, TruFOS, Fabric Vision, and SANnav-style management. Treat commercial SKUs, warranties, and support contracts as TGStor / Huacun Zhigu line items unless a quote explicitly states otherwise.

TG-G720-24-64G-R-Z is the TG-STOR commercial kit for a G720 with 24 64G short-wave SFPs, AC power, port-side exhaust, and the Enterprise bundle. It is still a 24-port licensed base; reach 64 ports with TG-MIDR8PTPOD-64G and TG-MIDR16DDG7POD-64G. Search it on SKU Lookup, then RFQ. No public net price.

TG-X78-0002-Z is the TG-STOR X7-8 director kit with two CP and two core blades, zero PSUs, zero fans, zero port blades, and the Enterprise bundle plus 36 months of -Z support. Buy matching fans, PSUs, and port blades such as TG-X764-2148 separately. Search the MPN on SKU Lookup. No public net price.

Yes. Open SKU Lookup, choose TGStor, and search any TG- or XTG- code from the Q4 2026 OEM list. The index returns the vendor description only — no list or net price. Add matched lines to a BOM and hand them to the RFQ form. Huawei OceanStor SNS codes are a different catalog.

Yes — TGStor X7-4 / X7-8, same ASIC path as Dell ED-DCX7. Also TGStor G710 / G720 / G730. No TGStor 7850 and no TGStor X6 director on the Q4 2026 line. Channel product path, not Huawei SNS, and not a legal official Broadcom authorized OEM claim.

Yes — TGStor G820 / X8-4 / X8-8, same ASIC path as Dell DS-8820B / ED-DCX8. G820 scales 24 to 56 ports with no SFP-DD. DS-8820B and TGStor G820 cannot share one PO.

No TGStor G620, no TGStor 7850, and no TGStor X6 director. Gen6 fixed names are G610 and G630. The TGStor director product is X7, not X6. Do not invent those product names on the RFQ.

Datasheets — Request PDF

Quick Answer: Five gated English PDFs cover the white paper, technical introduction, G610/G630, G710/G720/G730, and X7 Director. Submit a work email to receive the chosen file; a copy also goes to our INFO mailbox. There is no public /downloads hotlink on this page.

Prefer English datasheets for port ceilings (G720 max 64 ports). Soft channel prices remain industry estimate / pending confirmation.

References

Quick Answer: Validate model families on tgstor.cn, then peer port and optics language against Broadcom Brocade G720 and Cisco MDS 9700 public datasheets. Use TGStor English PDFs for ceilings and PoD floors; do not treat this buying guide as a published price list.

Primary numeric sources for this article: TGStor English datasheets for G610/G630, G710/G720/G730, and X7 Director, the Q4 2026 TG-STOR commercial list for G820 / X8 product names, plus TGStor Fibre Channel Switch Technical White Paper Issue 01 (2025-05-30). Channel soft prices remain pending confirmation.

Key Takeaway

Key Takeaway: Freeze the TGStor product name across the full line — G610 / G630, G710–G730, X7-4 / X7-8, G820, X8-4 / X8-8 — then match each TG- code. Empty X7 / X8 kits still need fans, PSUs, and blades. BENQUAN GLOBAL LIMITED supplies TGStor FC SAN switch configurations with competitive pricing.

Not sure your FC SAN BOM is equal across vendors?

If Gen6 vs Gen7 vs Gen8, PoD licenses, optics, or dual-fabric counts are still soft, request a free compatibility and delivery risk assessment before CapEx freeze.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk

Contents