Data Center / Storage / Tape Archive / Backup / Procurement / Comparison

Is Scalar i6 Gold 7x24 with a 4-hour response, or is Bronze next business day?

Same LTO-8 library BOM — different support SKUs. Gold 7x24x4 CRU vs Bronze 5x9xNBD CRU (plus optional onsite CRU install). Freeze drives, CoD slots, Active Vault, media, and support years before RFQ.

Quick Take

Quick Take: Quantum Scalar i6 Gold and Bronze quotes usually share one 6U library BOM — 75 slots, two LTO-8 FC drives, one EDLM scanner, Active Vault — and diverge only on support: Gold 7x24x4 CRU versus Bronze 5x9xNBD CRU (plus optional onsite CRU install). Equalize drives, CoD, media, and term years before you freeze.

Gold vs Bronze Support Fork

Quick Answer: Gold is 7x24x4 CRU; Bronze is 5x9xNBD CRU. Bronze peer quotes often add onsite CRU installation for libraries with up to six drives. Align annual quantities for library, drives, and CoD licenses across the same multi-year term before you compare TCO.

Threads titled "Scalar i6 Gold vs Bronze" rarely fail on LTO generation marketing — they fail on unequal drive counts, missing Active Vault or Capacity on Demand lines, and comparing multi-year Gold against single-year Bronze without stating the same support term.
6U
Control Module
LTO-8
Drive Generation
7x24
Gold SLA
5x9
Bronze SLA
DimensionGoldBronze
Coverage window7x245x9 (business hours)
Response model4-hour CRUNext Business Day CRU
Library frame support SKU (example)SSC36-RSJ0-CG12SSC36-RSJ0-CB12
Full-height drive support SKU (example)SSC36-RTDX-CG12SSC36-RTDX-CB12
25-slot CoD support SKU (example)SSC36-RLSE-CG12SSC36-RLSE-CB12
Onsite CRU install (up to six drives)Often not on Gold peer linesSSC36-VS06-CB12 commonly added
Typical term pattern5 annual lines (library / drives / CoD)Same 5-year pattern for fair TCO
Best fit24x7 restore SLAs, weekend windowsBusiness-hours ops, cost-sensitive archive

How to read the support quantities

Vendor quotes often show five annual library support lines, ten annual drive-module support lines (covering multiple drives across years), and five annual CoD license support lines. When you dual-RFQ Gold and Bronze, keep those quantity patterns identical so the only delta is tier and optional onsite CRU install — not a hidden term mismatch.

  • Pick Gold when: RTO requires after-hours drive or library CRU replacement; backup windows run nights and weekends; tape is on the critical restore path for ransomware / compliance.
  • Pick Bronze when: Archive and compliance retention dominate; ops staff are on site during business hours; you accept NBD CRU and may want onsite CRU install bundled.
  • Do not: Compare five-year Gold against one-year Bronze, or drop CoD / Active Vault from one side of the RFQ.

Shared Hardware & Software BOM

Quick Answer: Peer Gold and Bronze quotes typically share one 6U Scalar i6 control module (50 licensed slots), a 25-slot CoD upgrade, two IBM LTO-8 full-height 8Gb FC dual-port drives, one LTO-8 EDLM scanner, one extra 80 Plus PSU, and Active Vault — before support SKUs diverge.

The table below mirrors a common mid-range Scalar i6 starting configuration used in Gold and Bronze peer quotes. Part numbers are public Quantum SKUs. List prices, discounts, and extended totals are intentionally omitted — RFQ for current commercial terms.

SKUDescriptionQtyRole
LSC36-CSJ0-L00AScalar i6 Library, 6U Control Module, 50 licensed slots, no tape drives (rack depth 36.4 in / 92.5 cm)1Frame
LSC36-ATDX-L8PAIBM LTO-8 Tape Drive Module, Full Height, 8Gb Native Fibre Channel, Dual Port2Backup / restore I/O
LSC36-ATDE-L8PAIBM LTO-8 EDLM Scanning Tape Drive1Media integrity / EDLM
LSC36-APWR-001APower Supply, 80 Plus Certified Energy Efficient1Redundant / additional PSU
LSC36-ALSE-001AScalar i6 25-Slot Capacity on Demand Upgrade License1Slots 51–75
LSC36-ALAV-001AScalar i6 / AEL6 Active Vault License1In-library vaulting

What this BOM implies

  • 75 licensed slots after one 25-slot CoD upgrade on a 50-slot base — size media and vault policy against that license floor, not brochure max slots.
  • Two production LTO-8 FC drives + one EDLM scanner — do not collapse EDLM into "drive count" when comparing ingest windows; scanners serve media health, not backup streams.
  • Active Vault — vaulted cartridges stay in the library under policy; confirm backup ISV and vault workflow before cutting the license.
  • Rack depth — equipment racks must support 36.4 in (92.5 cm) product depth; call this out in site survey notes.
  • Not included by default — Quantum quotes typically exclude racks, Fibre Channel / Ethernet switches, and interface cables unless line-itemed. Budget fabric and cabling separately.

When Gold vs Bronze Actually Matters

Quick Answer: Use this bake-off when the Scalar i6 frame, drives, licenses, and media are already agreed — and the only open decision is support urgency against restore RTO. Do not use it to compare tape libraries against disk dedupe targets or backup software platforms.

  • Use this page: You have a mid-range Quantum Scalar i6 (i3 / i6 / AEL6 family) RFQ and need to choose Gold vs Bronze multi-year support on identical hardware.
  • Not this page: StoreOnce vs Quantum DXi — disk dedupe backup targets; tape is a different retention tier.
  • Not this page: PowerProtect DD vs StoreOnce — primary dedupe appliance peer; keep tape as air-gap / deep archive on a separate BOM line.
  • Not this page: ZDLRA vs RMAN vs third-party — Oracle database protection control plane; Scalar i6 may hold offline copies but is not ZDLRA.
  • Adjacency: Backup platforms shortlist 2026 — when the open question is Veeam / Commvault / Rubrik before the tape frame.

Support tier is not a capacity upgrade

Gold and Bronze do not add slots, drives, or throughput. Capacity comes from CoD licenses, expansion modules, and drive count. Support only changes how fast Quantum replaces Customer Replaceable Units (CRUs) and whether onsite CRU installation is bundled.

Media & Lead-Time Reality

Quick Answer: Peer media packs often include 80 pre-labeled LTO-8 data cartridges (order multiples of 20) and five universal cleaning cartridges (multiples of five). Media is commonly non-cancelable / non-returnable. System lead time for Scalar i6 is typically about three weeks — confirm at order.

SKUDescriptionQtyNotes
MR-L8MQN-BCLTO Ultrium 8 (LTO-8) data cartridge, pre-labeled80Order in multiples of 20; NCNR
MR-LUCQN-BCLTO Ultrium Universal cleaning cartridge, pre-labeled5Order in multiples of five; NCNR
  • Media OPEX vs CapEx: Cartridges may appear on a separate media OPEX configuration. Keep media on the same brief as the library so slot licenses and cartridge count stay aligned.
  • Shipping: Quotes may show collect-from-warehouse shipping — clarify Incoterms and destination charges before PO.
  • Lead time: Plan ~3 weeks for Scalar i6 frames after credit / deal registration steps complete; installation scheduling can add further lead time.
  • Service zone: Support SKUs are zone-sensitive. State installation country / zone on the RFQ so Gold and Bronze lines stay comparable.

Dedupe Targets, ISV Paths & Tape Adjacency

Quick Answer: Scalar i6 is the tape and vault tier. Disk deduplication appliances such as DXi, StoreOnce and PowerProtect DD, along with backup software including Veeam, Commvault and Rubrik, sit on separate lines. Win tape tenders on licensed slots, drive count honesty and support response, not brochure cartridge capacity.

Tape is air-gap economics, not ingest marketing

Win Scalar i6 RFQs on licensed slots, drive count honesty, EDLM / Active Vault necessity, and support RTO — not on brochure cartridge capacity. Keep disk ingest TB/hr on the dedupe appliance RFQ.

RFQ Checklist — Gold and Bronze on One Brief

Quick Answer: One Scalar i6 brief with equal frame, drives, CoD, Active Vault, media, and support years → Gold line → Bronze line → validate service zone, rack depth, fabric and cable exclusions, and whether onsite CRU install is required on Bronze.

What to put on the RFQ

  • Library: Scalar i6 6U control module SKU and baseline licensed slots
  • Capacity on Demand: slot upgrade quantity (e.g. +25) and matching support SKU years
  • Drives: LTO generation, full-height vs half-height, FC speed / dual-port, production drive qty
  • EDLM: scanning drive included or not — call it out separately from backup drives
  • Power: additional / redundant PSU quantity
  • Software: Active Vault and any other feature licenses
  • Media: LTO data cartridge qty (multiples of 20) + cleaning cartridges (multiples of five)
  • Support tier: Gold 7x24x4 CRU vs Bronze 5x9xNBD CRU — same term years on both
  • Onsite CRU install: required on Bronze (or not) for libraries with up to six drives
  • Service zone / install country; rack depth confirmation (36.4 in / 92.5 cm)
  • Exclusions: racks, FC/Ethernet switches, cables — budget separately
  • Lead time and installation window expectations
  • Backup ISV path writing to tape (Veeam, Commvault, etc.) — for workflow validation, not for mixing into support TCO

Submit the tape BOM brief on rfq.html.

Frequently Asked Questions

Quick Answer: Gold wins when restore recovery objectives demand round-the-clock four-hour customer-replaceable unit response. Bronze wins for business-hours archive economics with optional onsite installation. The hardware bill of materials stays identical across both quotes, so run the support tier as a dual comparison only after the shared library configuration is frozen.

Neither is universally better. Gold fits 24x7 restore SLAs. Bronze fits business-hours ops and lower support spend. Map the tier to RTO, not to capacity.

No. Peer quotes share the same frame, drives, CoD, Active Vault, and media. Only support SKUs — and often Bronze onsite CRU install — diverge.

One 6U control module (50 slots), +25 CoD (75 slots), two LTO-8 FC dual-port drives, one EDLM scanner, one extra PSU, Active Vault, LTO-8 media, cleaning cartridges, and multi-year support.

Usually not. Unless line-itemed, racks, Fibre Channel switches, Ethernet switches, and interface cables are excluded. Budget fabric and cabling on separate lines.

Submit one RFQ with the checklist above — Gold and Bronze support on the same brief.

Key Takeaway

Key Takeaway: Scalar i6 Gold vs Bronze is a support RTO decision on a shared LTO-8 library BOM — not a capacity bake-off. Freeze frame, drives, CoD, Active Vault, media, and term years first; then pick 7x24x4 CRU or 5x9xNBD CRU. BENQUAN GLOBAL LIMITED supplies Quantum Scalar i6 with competitive pricing and configuration support for global buyers.

Not sure your tape BOM is optimal?

If Scalar i6 drive count, CoD slots, Active Vault, media pack size, or Gold vs Bronze support years are unclear, click below for a free compatibility and delivery risk assessment. Fast global BOM validation and risk assessment.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk

Contents