Quick Take
Quick Take: A public letter from Pure's CEO put average price rises near 70% since the start of 2026, with some component inputs up several hundred percent since mid-2025. That reprices every open cart, so the practical questions are how much usable capacity you actually need and whether Evergreen still beats CapEx.
What Moved on Pricing
Quick Answer: A public CEO letter to customers described average Pure prices up around 70% since the start of 2026, after input costs for high-volume semiconductors rose sharply — cited in the hundreds of percent for some components since mid-2025, with step-ups through early 2026.
This is the storage twin of the server memory trilogy (Dell · HPE · Lenovo). If your SAN/NAS CapEx still assumes 2024 flash learning curves, rewrite the model.
Send your storage brief via Request a Quote. Related: PowerStore vs Pure vs NetApp, DRAM/NAND BOM risk, FlashArray //X & //C specs.
*From Pure/Everpure public customer communications and industry coverage — revalidate per SKU on a dated quote.
- In scope — FlashArray / FlashBlade class systems that burn DRAM, CPUs, and NAND.
- Quote culture — Same letter called out competitor quote durations of about one week or less.
- Buyer implication — Evergreen consumption and CapEx arrays both need fresh commercial math.
Three-way shortlist: PowerStore vs Pure vs NetApp.
Why Storage Feels the Same Memory Pain as Servers
Quick Answer: AI HBM demand reallocated wafer capacity away from conventional DRAM and NAND. Arrays are not immune — controllers need DRAM, media needs NAND, and lead times from some suppliers have stretched years in vendor remarks. NetApp has described a different merchant-component posture; still dual-quote rather than assume immunity.
- Shared inputs — Same DRAM/NAND curve hitting PowerEdge and ProLiant (see DRAM/NAND risk).
- Lead-time risk — Customer letters referenced supplier lead times stretching far beyond typical enterprise planning horizons.
- Peer moves — Dell, NetApp, and HPE Alletra-class platforms also pass through component inflation.
- Planning base — Right-size data + early RFQ + dual path + short-quote discipline.
Buyer Decision Matrix
Quick Answer: Stay on Pure when Evergreen ops and data-reduction economics still clear TCO after a fresh quote. Dual-quote PowerStore or NetApp when ATP or commercial lock is better. Prefer consumption only when burn schedules and uplift caps are written. Never expand capacity to bury ROT data at 2026 flash prices.
| Situation | Prefer | Why |
|---|---|---|
| Pure ops locked; fresh quote still clears budget + ATP | Pure (repriced BOM) | Avoid mid-project array migration tax |
| Need alternate ATP or CapEx path | Dual-path PowerStore / NetApp | Same KPI brief, compare landed weeks and TCO |
| Unpredictable growth, hate forklift refreshes | Evergreen-style consumption | Only with term, uplift, and exit language written |
| Large cold/ROT estate | Tier first, then buy | Buying flash for cold data is the expensive mistake |
Specs: FlashArray //X & //C · FlashBlade //S · PowerStore T · NetApp AFF.
Actions Before You PO
Quick Answer: Reprice every open Pure cart, freeze usable capacity from measured data, score CapEx vs Evergreen on one sheet, dual-RFQ PowerStore and NetApp, and diary quote expiry in days. Run pre-PO validation before signature so SKU and license lines match the design.
1. Kill stale PDFs
Any storage quote from before the 2026 input-cost spike is a planning artifact, not a PO source.
2. Measure before you buy
Usable TB, growth rate, and cold-data share first — then media class.
3. Dual brief
Same IOPS/latency/capacity target to Pure, PowerStore, and NetApp in one RFQ week.
4. Validate before PO
Wrong shelf SKU plus short quote is a double failure — use pre-PO validation.
RFQ Checklist — Pure Under Memory Inflation
Quick Answer: Send usable capacity, performance KPIs, protocol (block/file/object), HA needs, quantity, and go-live. Ask for quote expiry, dated ATP, and CapEx versus Evergreen options on the same sheet. Attach the design BOM. Request PowerStore and NetApp dual-path quotes on the identical brief.
- Workload KPIs — Usable TB, IOPS/latency, protocols, replication.
- Data honesty — Hot vs cold share; growth assumptions.
- Commercial model — CapEx array vs Evergreen-style consumption.
- Quote clock — Printed expiry (assume days, not months).
- Lead time — Dated ATP by controller/shelf SKU.
- Support / Evergreen terms — Uplift caps and exit language if consumption.
- Alternate path — PowerStore and/or NetApp peer BOM.
Frequently Asked Questions
Quick Answer: Treat ~70% as a vendor-average signal, not your line item. Reprice every open cart, right-size usable capacity, dual-quote peer arrays, and lock short quote windows before PO. RFQ with global stock for Pure and peers with competitive pricing and a free BOM risk assessment.
No. That figure was described as an average move. Your uplift depends on media, DRAM, and configuration — only a fresh quote settles it.
NetApp has publicly described price increases plus a merchant-component model with different shortage posture. Still dual-quote — immunity claims are not a substitute for dated ATP.
Industry views often frame elevated DRAM/NAND as multi-year, not a one-quarter blip. Waiting without a dual-path plan is usually calendar risk, not savings.
Send the storage brief via RFQ.
Key Takeaway
Key Takeaway: Do not treat 70% as your line item. Reprice open carts against measured usable TB, put CapEx and Evergreen on one sheet, and send the identical brief to PowerStore and NetApp before the quote window closes. BENQUAN GLOBAL LIMITED supplies Pure Storage FlashArray and peer platforms with competitive pricing and worldwide shipping.