Quick Take
Quick Take: Pure Storage is now Everpure as of February 2026 (everpuredata.com, NYSE ticker P since April 2026, formerly PSTG). FlashArray, FlashBlade, Evergreen, and SafeMode remain the buying objects. Rebrand alone is not a re-quote trigger — freeze BOM, cash path, ATP, and the PO legal-entity name. RFQ with exact SKUs for pricing.
What Changed for Buyers
Quick Answer: The company name and primary web properties moved to Everpure at everpuredata.com in February 2026, with messaging emphasizing an Enterprise Data Cloud narrative and Fusion control-plane storytelling. Procurement still buys arrays, blades and Evergreen terms rather than a logo, and the stock ticker changed from PSTG to P in April 2026.
Pair with Evergreen cash-path RFQ, //E vs //X vs //C, and 2026 price-surge notes.
- Corporate brand: Pure Storage → Everpure
- Site: everpuredata.com (phased email / systems updates)
- Narrative: storage platform → broader data management / EDC
- Adjacency: 1touch acquisition for the data intelligence roadmap (completed 11 May 2026)
What Did Not Change on the BOM
Quick Answer: FlashArray in its E, X, C and XL variants, FlashBlade, Evergreen One and Forever subscriptions, SafeMode retention and Portworx-class Kubernetes storage all remain the technical columns on the tender. The rebrand does not erase NAND quote expiry windows or availability-to-promise risk in a volatile media market.
| Still on the RFQ | Why it matters |
|---|---|
| Model peers (//X vs //XL, FlashBlade) | Latency and throughput decide CapEx |
| Evergreen cash path | Ownership vs STaaS — see dedicated guide |
| SafeMode posture | Timer, approvers, retention capacity |
| Quote expiry / ATP | 2026 media volatility still real |
RFQ Wording That Wins Search Clicks
Quick Answer: Put both Pure Storage and Everpure into titles and briefs so brand searches under either name and channel tenders land on the same page. Lead with the SKU problem, naming the FlashArray model, Evergreen path and SafeMode posture, rather than opening with company credentials.
Cover-line pattern
“Pure Storage (Everpure) FlashArray //X + Evergreen//Forever — usable TiB, SafeMode timer, ATP date.” Buyers searching either brand name see their terms; engineering sees the BOM.
Buyer Checklist After Rebrand
Quick Answer: Confirm the legal entity name on the purchase order matches vendor paperwork, keep both Pure Storage and Everpure in search-facing copy, freeze the technical peer models, equalize the Evergreen cash path, and date SafeMode posture and availability commitments. Do not re-bid a healthy configuration purely because the logo changed.
- PO / contract legal name aligned with vendor paperwork
- Technical BOM uses FlashArray / FlashBlade SKUs
- Search copy includes Pure Storage and Everpure
- Evergreen CapEx / Forever / One equalized
- SafeMode and ATP dated
- No re-quote solely for logo change
Dated Timeline of the Rename and Ticker Change
Quick Answer: Pure Storage announced the name Everpure on 23 February 2026 and began trading as Everpure on the NYSE on 5 March 2026 under the ticker PSTG. The ticker then changed to P, with trading under P expected from 17 April 2026, and the 1touch acquisition completed on 11 May 2026. The CUSIP number is unchanged.
| Date | Event | What it means for a buyer |
|---|---|---|
| 23 Feb 2026 | Name Everpure announced; definitive agreement to acquire 1touch | New brand; products such as FlashArray, FlashBlade and Evergreen keep their names |
| 5 Mar 2026 | Trading as Everpure on the NYSE begins, ticker PSTG unchanged at that point | Company name on documents may show either name |
| 7 Apr 2026 | Ticker change from PSTG to P announced | No shareholder action; CUSIP number unchanged |
| 17 Apr 2026 | Trading under ticker P expected to begin | Older PSTG references in quotes and filings are legacy |
| 11 May 2026 | 1touch acquisition completed (editorial update on the press release) | Data discovery roadmap item, not a hardware BOM change |
Sources: Everpure rename press release (23 Feb 2026) and Everpure ticker change press release (7 Apr 2026). Dates are taken from the company press releases. Checked 2026-10-15.
Counted from the 23 February 2026 announcement, trading as Everpure began 10 days later, the ticker change followed 53 days after the announcement, and the 1touch acquisition closed 77 days after it. Treat any quote or contract dated before those days as possibly carrying the older name or ticker.
How to Update a Purchase Order After the Rename in Five Steps
- Step 1: Ask your Everpure or reseller contact which legal entity name belongs on the purchase order.
- Step 2: Keep the technical BOM on the FlashArray, FlashBlade and Evergreen model names you already validated.
- Step 3: Replace any stored ticker PSTG with P only where your finance or compliance records need the ticker.
- Step 4: Confirm quote expiry and availability-to-promise dates in writing, because the rename does not change them.
- Step 5: Re-quote only when the configuration, capacity, Evergreen path or delivery date changed.
Frequently Asked Questions
Quick Answer: Everpure is the renamed Pure Storage, adopted in February 2026, and FlashArray, FlashBlade, Evergreen and SafeMode all continue unchanged. Re-quote only when the configuration, Evergreen path, capacity or delivery date changed, not for the brand alone. Update paperwork language and keep both names in search-facing copy.
The NYSE ticker changed from PSTG to P, with trading under P expected to begin on 17 April 2026, and the CUSIP number is unchanged. Older documents may still show PSTG. Checked 2026-10-15.
Yes. Pure Storage rebranded to Everpure in February 2026. Products such as FlashArray, FlashBlade, Evergreen, and SafeMode continue; the corporate brand and everpuredata.com site reflect the new name. The NYSE ticker changed from PSTG to P in April 2026; the CUSIP number is unchanged.
Not for brand-name alone. Re-quote when BOM, Evergreen path, capacity, or ATP changed — not because logos say Everpure. Confirm legal entity and PO name match your vendor paperwork.
Use both search terms buyers type: Pure Storage and Everpure. Freeze FlashArray / FlashBlade peers, Evergreen cash path, SafeMode posture, and ATP. Treat Fusion / EDC language as control-plane features unless separately scoped.
Commercial Evergreen constructs remain the cash-path decision. Rebrand does not replace CapEx vs Forever vs One equalization — see the Evergreen RFQ guide.
Submit the BOM via Free Compatibility & Delivery Risk Assessment or email info@benquan.hk.
Key Takeaway
Key Takeaway: Treat the February 2026 rename as paperwork, not a re-quote trigger: the ticker moved from PSTG to P and FlashArray //E through //XL, FlashBlade, Evergreen and SafeMode are unchanged. Align the PO legal entity, keep both brand names, and re-bid only when capacity, cash path or ATP moves. BENQUAN supplies Pure Storage (Everpure) FlashArray and FlashBlade with competitive pricing.