Enterprise Storage / Dell PowerStore / SAN Networking

Is the PowerStore front end 32Gb FC, 25GbE, or 100GbE in slot 0?

How to choose the right front-end network interface for your Dell PowerStore deployment — protocol mapping, IO module placement, and best practices.

Quick Take

Quick Take: Choose the Dell PowerStore front-end by protocol and throughput: 32Gb Fibre Channel for existing SANs and NVMe/FC latency, 25GbE optical for unified block and file, 100GbE in slot 0 for maximum throughput, and 10GBASE-T only on legacy copper. BENQUAN GLOBAL LIMITED supplies PowerStore IO modules.

PowerStore Network Interface Options Overview

Quick Answer: PowerStore 1000-9200 models take a four-port card plus two optional IO modules per node; the 500T adds onboard 10GbE ports. Four interface choices exist — 10GBASE-T copper, 25/10GbE optical, dual-port 100GbE optical, and four-port 32Gb Fibre Channel — and each fixes the protocols available to hosts.

Dell PowerStore T-series arrays expose front-end connectivity through a four-port card on each node plus two optional IO module slots, and the interface you order fixes which protocols and how much throughput your applications get. This guide maps interfaces to protocols, slot rules, and topology practice. Related: PowerStore 3200T specs, FC SAN port planning.

Dell PowerStore T-series models (3200T, 5200T, 9200T) support front-end connectivity through a four-port card (installed on the node) plus two optional IO module slots. The 500T model has onboard 10GbE ports in addition to these slots. The network interface you choose determines which protocols are available and the maximum throughput your applications will see.

Interface Ports per Module PCIe Lanes Supported Models Protocols
10GBASE-T Copper 4 8-lane Gen3 All models iSCSI, NVMe/TCP, NFS, SMB
25/10GbE Optical 4 8-lane Gen3 All models iSCSI, NVMe/TCP, NFS, SMB
100GbE Optical 2 16-lane Gen3 1000-9200 only iSCSI, NVMe/TCP, NFS, SMB
32Gb Fibre Channel 4 16-lane Gen3 All models FC, NVMe/FC

Interface Deep Dive

Quick Answer: The 25GbE optical module is the general-purpose choice, carrying iSCSI, NVMe/TCP, NFS, and SMB on the same ports with VLAN separation. 100GbE delivers maximum throughput but must sit in slot 0. 32Gb Fibre Channel gives the lowest block latency and NVMe/FC support, while 10GBASE-T serves legacy copper plants.

25/10GbE Optical — The General-Purpose Choice

The 25GbE optical module (SFP28) is the most flexible front-end interface for PowerStore. It supports block protocols (iSCSI, NVMe/TCP) and file protocols (NFS, SMB) on the same physical ports, with VLAN separation. The four-port module can be installed as either the embedded four-port card or as an optional IO module. Jumbo frames (MTU 9000) are recommended for all 25GbE connections.

Typical use: Mixed block and file workloads, unified storage deployments, VMware vVols over NVMe/TCP.

100GbE Optical — Maximum Throughput

The 100GbE module (QSFP28) is the highest-bandwidth option, offering two ports per module at 100 Gbps each. It requires IO module slot 0 because slot 0 provides 16-lane PCIe Gen3 bandwidth — the 8-lane slot 1 would bottleneck a 100GbE module. Supported only on PowerStore 1000-9200 models, not on the 500T.

Typical use: VDI boot storm environments, large database workloads, high-throughput file serving, replication-heavy deployments.

32Gb Fibre Channel — Lowest Block Latency

The 32Gb FC module provides four ports per module supporting 32/16/8/4 Gb speeds. It uses 16-lane PCIe Gen3 and is recommended for slot 0 unless a 100GbE module occupies that slot. NVMe/FC can be enabled on the same FC ports for reduced transport latency, but requires NVMe/FC-capable switches and HBAs throughout the fabric. Dual redundant FC fabrics are mandatory.

Typical use: Existing FC SAN environments, Oracle/SQL Server databases requiring NVMe/FC, environments with strict storage network segregation requirements.

10GBASE-T Copper — Legacy Infrastructure

The 10GBASE-T module uses RJ45 copper connections at up to 10 Gbps. It is the lowest-cost option but also the lowest-performing. The 8-lane PCIe Gen3 interface is shared across four ports, so throughput scales with the number of active ports. Consider deploying the first two ports of each card first for best bandwidth distribution.

Typical use: Existing 10GbE copper infrastructure, cost-sensitive deployments, lower-throughput environments.

Protocol-to-Interface Mapping

Quick Answer: Fibre Channel protocols — FCP, NVMe/FC, and FC vVols — run only on the 32Gb FC module. Every Ethernet interface (10GBASE-T, 25GbE, 100GbE) carries iSCSI, NVMe/TCP, NFSv3/v4, SMB 3.x, Ethernet vVols, and replication. Replication always rides Ethernet, so plan Ethernet ports even in FC-first designs.

Not every protocol works on every interface. This table shows which combinations are supported on PowerStore:

Protocol 10GBASE-T 25GbE 100GbE 32Gb FC
Fibre Channel (FCP) - - - Yes
NVMe/FC - - - Yes
iSCSI Yes Yes Yes -
NVMe/TCP Yes Yes Yes -
NFSv3/v4 Yes Yes Yes -
SMB 3.x Yes Yes Yes -
vVols (FC) - - - Yes
vVols (iSCSI/NVMe/TCP) Yes Yes Yes -
Replication Yes Yes Yes -

IO Module Slot Placement Best Practices

Quick Answer: Slot 0 provides 16-lane PCIe Gen3 and slot 1 only 8 lanes, so the 100GbE module must occupy slot 0 and FC modules prefer it. Cable slot 0 ports before slot 1, and populate the first two ports of each 8-lane card first for the best bandwidth distribution.

PowerStore 1000-9200 models have two IO module slots per node with different PCIe lane configurations:

Slot PCIe Width Recommendation
Slot 0 16-lane PCIe Gen3 100GbE module must go here. FC module preferred here. 25GbE module works here.
Slot 1 8-lane PCIe Gen3 FC or 25GbE module. Not recommended for 100GbE.

Key Placement Rules

  • 100GbE must be in slot 0 — only slot 0 provides enough PCIe bandwidth for 100 Gbps per port.
  • Cable slot 0 ports first — for FC modules in both slots, cable slot 0 ports before slot 1 ports due to the PCIe difference.
  • First two ports of each card first — for 25GbE and 10GBASE-T modules (8-lane PCIe), cabling the first two ports of all cards first maximizes MBPS scaling.
  • Slot 1 bottleneck is only at full 32Gb FC saturation — the 8-lane slot 1 only limits throughput when all four FC ports run at 32 Gb simultaneously.

Network Topology Guidelines

Quick Answer: Run dual redundant FC fabrics with two paths per host to each PowerStore node and no more than eight active paths per volume. On Ethernet, pair VLT-connected switches, use LACP, and bond NAS ports. Set MTU 9000 end-to-end — cluster, switches, and host adapters — for all storage networks.

Fibre Channel Fabrics

Configure dual redundant FC fabrics. Each PowerStore node and each host must have connectivity on both fabrics. Minimize the number of hops between host and storage. Each host should have at least two paths to each PowerStore node (four paths per appliance), with no more than eight active paths per volume.

Ethernet Networks

Use multiple switches connected with Virtual Link Trunking (VLT) or equivalent technology. Each PowerStore node should connect to all switches. Use LACP for link aggregation across switch ports. For NAS connectivity, use bonded ports (user-defined link aggregations in PowerStoreOS 4.0+).

Jumbo Frames

Set MTU to 9000 (jumbo frames) for all storage networks. Enable at the cluster level (Cluster MTU = 9000) and on the storage network. Jumbo frames must be supported end-to-end including switches and HBAs.

Interface Selection Decision Framework

Quick Answer: Map the environment to the interface: existing FC SAN buys 32Gb Fibre Channel, mixed block-plus-file estates take 25GbE optical, VDI and replication-heavy sites justify 100GbE in slot 0, and copper-only plants keep 10GBASE-T until refresh. For VMware vVols, NVMe/TCP over 25GbE or NVMe/FC both work.

Choose Your Interface

  • Already have FC SAN infrastructure — 32Gb Fibre Channel. You can run traditional FCP or upgrade to NVMe/FC for lower latency on the same ports.
  • Mixed block + file, unified storage — 25GbE optical. Run iSCSI or NVMe/TCP for block, plus NFS/SMB for file on the same ports with VLAN separation.
  • VDI, large databases, replication-intensive — 100GbE in slot 0. The dual 100GbE ports provide the highest throughput capacity.
  • Cost-sensitive, existing 10GbE copper — 10GBASE-T. Adequate for moderate workloads; upgrade to 25GbE optical when budget allows.
  • VMware vVols deployment — NVMe/TCP over 25GbE or NVMe/FC over 32Gb FC. Both are supported; NVMe/FC provides lower latency.

Frequently Asked Questions

Quick Answer: Common questions cover which interfaces PowerStore supports, when Fibre Channel beats Ethernet, NVMe/FC support on 32Gb ports, and the 3200T port ceiling of 24 front-end ports. Confirm IO module choice, slot placement, and switch compatibility on the order — modules decide protocols, and slot 0 decides 100GbE.

PowerStore supports 25GbE optical, 100GbE optical, 32Gb Fibre Channel, and 10GBASE-T copper interfaces. The available options depend on the model — the 500T has onboard 10GbE ports, while 1000-9200 models use a four-port card plus two optional IO module slots.

Use Fibre Channel if you have existing FC infrastructure, need NVMe/FC for lowest latency, or require dedicated storage networking. Use Ethernet (25GbE or 100GbE) for unified block and file access, NVMe/TCP, or when consolidating onto a single network fabric.

Yes. PowerStore supports NVMe/FC on the same 32Gb Fibre Channel ports used for traditional FCP. All parts of the network — switches and HBAs — must support NVMe over Fibre Channel. NVMe/FC reduces transport latency compared to FCP.

PowerStore 3200T supports up to 24 front-end network ports: up to 24 10/25 GbE ports, 8 100GbE ports, and 16 32Gb Fibre Channel ports. The exact maximum depends on the combination of IO modules installed.

BENQUAN GLOBAL LIMITED is an authorized Dell Technologies partner. We offer deployment support, ProSupport coverage, and fast delivery for all PowerStore models.

Key Takeaway

Key Takeaway: Interface choice locks protocol support: 32Gb FC for SAN estates and NVMe/FC, 25GbE for unified block and file, 100GbE in slot 0 for peak throughput, 10GBASE-T for legacy copper. Fix modules and slot placement before the PO — they are not field trade-ins. BENQUAN GLOBAL LIMITED supplies Dell PowerStore arrays and IO modules with competitive pricing and configuration support.

Not sure your BOM is optimal?

If IO module mix, slot placement, or switch compatibility is unclear, click below for a free compatibility and delivery risk assessment. Fast global BOM validation and risk assessment.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk

Contents