Quick Take
Quick Take: Dell publishes no list price for PowerStore, which leaves budget owners guessing what a 500T, 3200T, or 9200T should cost. This guide gives planning bands per model, names the five components that move the number most, and weighs buying outright against APEX consumption.
PowerStore Pricing by Model
Quick Answer: PowerStore pricing in Hong Kong ranges from approximately HK$230,000 (500T entry) to HK$2,500,000+ (9200T fully loaded). A typical 3200T with 10 NVMe drives, 25GbE networking, and 3-year ProSupport costs around HK$550,000–HK$800,000. Key cost drivers: drive count, model tier, networking modules, and support level. Dell APEX consumption pricing is also available through authorized partners like BENQUAN.
For the full model ladder, competitor tables, migration waves, and Hong Kong TCO, see the Dell PowerStore Complete Guide 2026.
Quick Answer: Budget roughly HK$230K to HK$350K for a 500T on 10GbE, HK$550K to HK$800K for a 3200T with ten 7.68TB drives and 25GbE plus FC, and HK$1,800K upward for a 9200T. Dell sells only through partners, so these bands are planning figures, not list prices.
Dell PowerStore is sold through authorized partners — list prices are not publicly published. The ranges below are based on typical Hong Kong configurations and should be used as budgeting estimates only. Actual pricing depends on configuration, volume, and negotiation.
What Drives PowerStore Cost?
Quick Answer: Five levers move the number: model tier, where a 9200T carries 3.3 times the cache of a 3200T; NVMe drive capacity; networking modules, since 100GbE claims the 16-lane PCIe slot; support tier, where ProSupport Plus adds 15 to 25 percent; and licensed extras like Metro Volume.
Understanding the pricing components helps you make trade-offs between cost and capability.
1. Model Tier — Cache and CPU
The largest single cost differentiator between models is system memory and CPU count. The 9200T has 2560GB cache (3.3x the 3200T) and 112 cores (1.75x the 3200T). This premium buys higher VM density, lower latency under load, and higher volume/snapshot limits. If your workload fits within the 3200T's capabilities, the price gap to the 5200T or 9200T is significant.
2. NVMe Drives — Capacity and Type
NVMe drive costs scale with capacity. TLC drives (1.92TB, 3.84TB, 7.68TB, 15.36TB) cost more per TB than QLC drives but offer higher endurance. The 5:1 data reduction guarantee effectively multiplies your usable capacity — a 7.68TB drive delivers ~38TB usable — making the per-TB-effective cost competitive with mid-range SSDs.
3. Networking Modules
25GbE optical modules are the standard. Upgrading to 100GbE or adding 32Gb FC modules adds cost per module. The 100GbE module requires 16-lane PCIe slot 0, limiting configuration flexibility if you also want FC.
4. Support and Services
ProSupport (standard) vs. ProSupport Plus (premium) differs by about 15-25%. Three-year vs. five-year contracts affect annual costs. Deployment services, cabling, and training are typically quoted separately.
5. Software Features
All core PowerStoreOS features (data reduction, thin provisioning, clones, encryption) are included at no additional cost. Optional licensed features like Metro Volume (synchronous replication) and PowerProtect DD integration add cost.
Purchase vs. APEX Consumption
Quick Answer: Buying outright is cheaper over three years but requires sizing for peak plus growth as capital expenditure. APEX Flex on Demand bills monthly per TB consumed as operating expenditure and carries a 15 to 25 percent premium, which buys the ability to start small and scale on demand.
Dell offers two purchasing models for PowerStore in Hong Kong:
| Factor | Traditional Purchase | APEX Flex on Demand |
|---|---|---|
| Payment | Upfront (capex) | Monthly per-TB consumed (opex) |
| Best for | Stable, predictable growth | Variable or rapid growth |
| 3-year cost | Lower total cost | 15-25% premium over purchase |
| Capacity buffer | Purchase for peak + growth | Start small, scale as needed |
| Budget treatment | Capital expenditure | Operating expenditure |
Total Cost of Ownership Factors
Quick Answer: Look past the purchase price: 100TB raw becomes about 500TB usable under the 5:1 guarantee, a 3200T draws around 1,056W and typically cuts power 40 to 60 percent versus a legacy Unity or VNX, and one 2U appliance can retire several older arrays.
Beyond the purchase price, these factors affect the 3-5 year TCO:
Hidden Savings with PowerStore
- 5:1 data reduction guarantee — Buy 100TB raw, get ~500TB usable. No other vendor offers a contractual guarantee.
- Power/cooling savings — A 3200T uses ~1,056W at typical load. Replacing legacy arrays (Unity, VNX) typically cuts power 40-60%.
- Rack space consolidation — 2U per appliance with up to 5.90 PBe effective. Replace 3-10 legacy arrays with one PowerStore cluster.
- Non-disruptive upgrades — No forklift upgrades. Scale up, scale out, and upgrade PowerStoreOS without downtime.
- Built-in software — All data services (thin provisioning, clones, encryption, snapshots, replication) included. No per-feature licensing.
How to Get the Best Price in Hong Kong
Quick Answer: Quote accuracy comes from precision: state VM count, raw and usable capacity, IOPS targets, protocols and growth before asking for numbers. Then work through an authorized partner for current programs and promotions, commit to three or five years of support, and bundle deployment rather than buying services later.
- Define your requirements precisely Provide the number of VMs, capacity needs (raw and usable), IOPS targets, protocol requirements (FC, iSCSI, NFS), and growth projections. A well-defined scope gets you the most accurate quote. 1
- Work with an authorized partner Authorized partners like BENQUAN have access to Dell's latest pricing programs, quarterly promotions, and education/government discounts. Grey-market pricing may look cheaper but lacks Dell warranty and support. 2
- Consider multi-year commitments A 3-year or 5-year ProSupport commitment typically includes service discounts compared to annual renewals. Multi-year APEX consumption contracts also lock in per-TB rates. 3
- Bundle deployment services Including installation, cabling, and migration services as part of the hardware purchase often yields better bundled pricing than procuring services separately. 4
- Request a bench quote vs. workload Ask your partner to quote against your specific workload rather than a generic configuration. The right-sized system often costs less than a "safe" oversized one. 5
Frequently Asked Questions
Quick Answer: Entry-level 500T configurations start near HK$230,000 and a 3200T with ten drives and three-year ProSupport typically runs HK$550,000 to HK$800,000, while a loaded 9200T passes HK$2,500,000. APEX Flex on Demand is available too, at a higher per-TB rate than buying the same capacity outright.
PowerStore pricing in Hong Kong varies by model and configuration. Entry-level 500T starts at approximately HK$230,000. A mid-range 3200T with 10 drives and 3-year ProSupport typically ranges from HK$550,000 to HK$800,000. A fully configured 9200T can exceed HK$2,500,000. Contact BENQUAN at info@benquan.hk for a custom quote.
Key pricing factors include: model tier (500T to 9200T), number and size of NVMe drives, networking module selection (25GbE, 100GbE, 32Gb FC), support tier (ProSupport vs ProSupport Plus), contract length (1-5 years), and whether you choose traditional purchase or APEX consumption pricing.
Dell PowerStore typically offers a lower entry price than Pure Storage FlashArray for equivalent configurations, and the 5:1 guaranteed data reduction provides predictable capacity economics. NetApp AFF pricing is competitive but varies by configuration. The best value depends on your specific workload and negotiation.
Yes. Dell APEX Flex on Demand lets you pay per TB consumed rather than upfront. This is available through authorized partners like BENQUAN. APEX is ideal for variable-growth environments, though the per-TB rate is higher than equivalent upfront purchase over 3-5 years.
Contact an authorized Dell partner like BENQUAN GLOBAL LIMITED. Provide your workload requirements (VM count, capacity, IOPS, protocol), and we will size the optimal configuration and provide a competitive quote. Multi-year commitments and bundled services typically yield better pricing.
Key Takeaway
Key Takeaway: Hong Kong PowerStore quotes swing with drive pack, IO modules, and support tier — treat list bands as planning only. Lock usable TB and lead time before PO. BENQUAN GLOBAL LIMITED supplies PowerStore with competitive Hong Kong pricing and configuration support.