Enterprise Storage / All-NVMe / Model Selection

Is the PowerStore a 3200T, 5200T, or 9200T by core count?

Complete three-way comparison of Dell PowerStore T-series models — cache, cores, capacity, and model selection guidance for enterprise buyers.

Quick Take

Quick Take: Choose the PowerStore 3200T (768 GB cache, 64 cores) for 100-300 VMs, the 5200T (1,152 GB, 96 cores) for 200-500 VMs, and the 9200T (2,560 GB, 112 cores) for 500+ VMs. All three share PowerStoreOS, a 2U chassis, and the 5:1 data-reduction guarantee. BENQUAN GLOBAL LIMITED supplies all PowerStore models.

PowerStore 3200T vs 5200T vs 9200T: Side-by-Side Specs

Quick Answer: All three arrays share a 2U chassis, 25 NVMe drive slots, 5.90 PBe per appliance, and the 5:1 data-reduction guarantee. They diverge in compute and memory: 64 cores and 768 GB on the 3200T, 96 cores and 1,152 GB on the 5200T, 112 cores and 2,560 GB on the 9200T.

All three PowerStore T-series arrays run the same PowerStoreOS software in the same 2U, 25-slot NVMe enclosure — what you buy at each tier is compute and memory headroom. This guide puts the 3200T, 5200T, and 9200T side by side so you can size the tier before freezing the BOM. Related: PowerStore complete guide, request a configuration review.

Specification 3200T 5200T 9200T
Target Environment Mid-range Entry Mid-to-large Enterprise Flagship
Processors 4 x Intel Xeon, 64 cores @ 2.1 GHz 4 x Intel Xeon, 96 cores @ 2.2 GHz 4 x Intel Xeon, 112 cores @ 2.2 GHz
System Memory 768 GB 1,152 GB 50% more 2,560 GB 3.3x
NVRAM Modules 2 4 4
Max Block Volumes 10,000 16,000 32,000 Largest
Max Snapshots 200,000 250,000 350,000
Max vVols 18,000 21,000 32,000
Max 10/25 GbE Ports 24 24 24
100 GbE Ports 8 8 8
Max 32Gb FC Ports 16 16 16
Max Drives per Appliance 93 93 93
Max Capacity per Appliance 5.90 PBe 5.90 PBe 5.90 PBe
Max Cluster Capacity 23.60 PBe 23.60 PBe 23.60 PBe
Data Reduction 5:1 guaranteed 5:1 guaranteed 5:1 guaranteed
Ideal VM Count 100 - 300 200 - 500 Sweet spot 500+
Typical Power 1,056 W 1,391 W 1,597 W
Heat Dissipation 3,605 BTU/hr 4,747 BTU/hr 5,449 BTU/hr
Form Factor 2U 2U 2U
Relative Entry Price $$ $$$ $$$$

Where the Models Diverge

Quick Answer: PowerStoreOS, the 2U base enclosure, and the 5:1 data-reduction guarantee are identical across the range. What changes is cache, core count, and volume or snapshot limits — and that determines which workloads each model handles: the bigger the cache and core budget, the heavier the consolidation it sustains.

All three T-series models share the same PowerStoreOS software, 2U base enclosure with 25 NVMe drive slots, and 5:1 data reduction guarantee. The differences are in compute and memory — and that determines which workloads each model handles best.

Cache Scaling

The 9200T's 2560GB cache (3.3x the 3200T) keeps dramatically more hot data in memory. For read-heavy workloads like SQL Server, VDI boot storms, and large-scale file services, this translates directly to higher cache hit ratios and lower latency at scale. The 5200T's 1152GB cache hits the sweet spot for most mixed-workload environments. The 3200T's 768GB cache is sufficient for 100-300 VM deployments with typical workload profiles.

Compute Headroom

The 9200T's 112 cores (vs 64 in the 3200T) matter most under heavy protocol concurrency — many simultaneous NFS, SMB, iSCSI, and FC connections all requiring CPU cycles for protocol processing, compression, and deduplication. The 5200T's 96 cores handle most mid-to-large deployments without bottlenecking.

Volume and Snapshot Limits

The 9200T supports 32,000 block volumes and 350,000 snapshots — more than triple the 3200T's limits. This matters for service providers, large VDI deployments, and environments with aggressive snapshot retention policies.

PowerStore 3200T — Mid-Range Workhorse

Quick Answer: The PowerStore 3200T pairs 768 GB of cache with 64 cores and 10,000 block volumes, making it the entry point into all-NVMe PowerStore. It comfortably runs 100-300 mixed VMs, SQL Server databases under 50 TB, and mid-size VDI estates at the lowest cost per usable terabyte.

Deployment example — regional bank, 150-VM VMware cluster: a regional bank consolidated three legacy SANs into a single PowerStore 3200T running 150 mixed VMs (SQL Server, Exchange, file servers). With 768GB cache and the 5:1 data reduction guarantee, it delivered sub-millisecond latency and 1.2PB usable from 276TB raw — at a price point that fit a mid-range budget.

  • Best for: 100-300 VMs, SQL Server databases under 50TB, VDI
  • Price positioning: best entry price for all-NVMe
  • Upgrade path: scale out with 5200T or 9200T nodes in the same cluster

PowerStore 5200T — Mid-to-Large Sweet Spot

Quick Answer: The PowerStore 5200T carries 1,152 GB of cache — 50% more than the 3200T — plus 96 cores, 16,000 volumes, and 250,000 snapshots. That headroom absorbs read spikes and heavy protocol concurrency, making it the price/performance sweet spot for 200-500 VM mixed-workload environments without stepping up to flagship pricing.

Deployment example — logistics firm, 350 mixed VMs: a logistics company running 350 mixed VMs (ERP, databases, file services, container workloads) chose the 5200T. The 50% cache increase over the 3200T eliminated read-latency spikes during peak batch processing, and the 96 cores handled simultaneous NFS, SMB, and iSCSI protocol traffic without strain.

  • Best for: 200-500 VMs, large databases, mixed protocol environments
  • Price positioning: best price/performance for most enterprises
  • Upgrade path: scale out with 9200T nodes for capacity growth

PowerStore 9200T — Enterprise Flagship

Quick Answer: The PowerStore 9200T is the flagship: 2,560 GB of cache (3.3x the 3200T), 112 cores, 32,000 block volumes, and 350,000 snapshots. It targets 500+ VM consolidations, large SQL Server estates, service providers, and VDI farms with aggressive snapshot schedules that would saturate the smaller models.

Deployment example — financial enterprise, 800-VM consolidation: a financial enterprise consolidated four datacenter sites onto a 4-appliance PowerStore cluster built on 9200T nodes. Each node ran 800+ VMs with aggressive 15-minute snapshot schedules for database protection. The 2560GB cache held cache-hit ratios above 85% on trading databases, and the 112 cores absorbed peak-hour protocol concurrency without degradation.

  • Best for: 500+ VMs, enterprise databases, large-scale VDI, service providers
  • Price positioning: premium for maximum headroom
  • Upgrade path: scale out up to 4 nodes per cluster, 23.60 PBe

Decision Framework

Quick Answer: Count VMs first, then check cache and limits. Under 200 VMs the 3200T wins on entry price, 200-500 VMs the 5200T wins on price/performance, and beyond 500 VMs the 9200T wins on headroom. All models mix in one cluster, so start small and scale out.

Choose Your Model

  • Under 200 VMs, moderate database sizes — PowerStore 3200T delivers all-NVMe performance at the best entry price. You get full PowerStoreOS capabilities including 5:1 data reduction, Metro replication, and Ansible automation.
  • 200-500 VMs, demanding mixed workloads — PowerStore 5200T is the sweet spot. The 1152GB cache and 96 cores provide headroom for growth without jumping to the flagship price tier.
  • 500+ VMs, massive databases, aggressive snapshots — PowerStore 9200T. The 2560GB cache, 112 cores, and enterprise-scale limits (32K volumes, 350K snapshots) handle the largest consolidation projects.
  • Planning for growth — All models can be mixed in the same cluster. Start with a 3200T and add 5200T or 9200T nodes as you scale.

Frequently Asked Questions

Quick Answer: Buyers most often ask how the three models differ, how many virtual machines each tier sustains, whether the 5200T handles large SQL Server databases, and whether models can be mixed in one scale-out cluster. The answers below reuse the same spec limits shown in the comparison table above.

The 3200T has 768GB cache and 64 cores (target: 100-300 VMs). The 5200T has 1152GB cache and 96 cores (target: 200-500 VMs). The 9200T has 2560GB cache and 112 cores (target: 500+ VMs). All three share the same 2U form factor and 5:1 data reduction guarantee.

The PowerStore 9200T supports 500+ VMs in VMware environments, with 2560GB cache, 32,000 block volumes, and 350,000 snapshots. It is designed for large enterprise workloads including massive SQL Server databases and VDI deployments.

Yes, the 5200T with 1152GB cache and 96 cores handles SQL Server databases over 50TB with consistent sub-millisecond latency. It supports up to 16,000 block volumes and 250,000 snapshots.

Yes. PowerStore scale-out clusters can include any combination of appliance models. You can start with a 3200T and add 5200T or 9200T nodes later. All models support load balancing and seamless data movement between appliances.

Share your target model and capacity through the RFQ form for a same-day response.

Key Takeaway

Key Takeaway: All three T-series models share PowerStoreOS, the 2U 25-slot NVMe enclosure, and the 5:1 data-reduction guarantee, so the choice comes down to cache, cores, and volume limits: 3200T for 100-300 VMs, 5200T for 200-500, 9200T for 500 and beyond. Mixed clusters let you scale tiers later. BENQUAN GLOBAL LIMITED supplies Dell PowerStore with competitive pricing and configuration support.

Not sure your PowerStore BOM is optimal?

Share your VM count, capacity target, and protocol mix for a free compatibility and delivery risk assessment. BENQUAN validates model tier, drive configuration, and lead-time options.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk

Contents