Insights / Buying Guide

PowerStore 3200T: 64 Cores, 5.90 PBe?

Complete technical reference for the Dell PowerStore 3200T all-NVMe storage array — hardware, capacity, networking, protocols, software, and physical specifications.

Quick Take

Quick Take: Dell PowerStore 3200T packs four Xeon processors, 64 cores, and 768GB of system memory into a 2U dual-node chassis, scaling from 25 internal NVMe bays to 93 drives and roughly 5.90 PBe effective. Front-end choices span 25GbE, 100GbE, and 32Gb Fibre Channel with nearly all software bundled..

Hardware Specifications

Quick Answer: A 3200T controller pair fills 2U with four Intel Xeon processors, 64 cores at 2.1 GHz and 768GB of memory split evenly across the two nodes, backed by mirrored NVRAM. Twenty-five NVMe bays grow to 93 drives with three ENS24 shelves, reaching 5.90 PBe effective. Front-end options span 25GbE, 100GbE and 32Gb Fibre Channel.

Quick Reference: The Dell PowerStore 3200T is a 2U all-NVMe storage appliance with 4 Intel Xeon processors (64 cores @ 2.1 GHz), 768GB cache, 25 NVMe drive slots (up to 93 with expansion), 5.90 PBe maximum effective capacity, and support for FC, iSCSI, NVMe/FC, NVMe/TCP, NFS, and SMB protocols. All software features including data reduction (5:1 guaranteed), thin provisioning, snapshots, and replication are included at no additional cost.

For the full model ladder, competitor tables, migration waves, and Hong Kong TCO, see the Dell PowerStore Complete Guide 2026.

System Overview

Model PowerStore 3200T
Form Factor 2U rackmount, dual active/active nodes
Processors 4 Intel Xeon processors, 64 cores total @ 2.1 GHz
System Memory 768 GB (384 GB per controller)
NVRAM Modules 2 (mirrored, write cache protection)
IO Module Slots Slot 0: 16-lane PCIe Gen3, Slot 1: 8-lane PCIe Gen3
Power Supplies Dual redundant, hot-swappable, 200-240 VAC
ENERGY STAR Certified

Drive Support and Capacity

Base Enclosure 2U with 25 x 2.5" NVMe drive slots
Expansion Enclosures Up to 3 x ENS24 (24 drives each), 2U form factor
Max Drives per Appliance 93 (25 base + 68 expansion)
Max Effective per Appliance Up to 5.90 PBe (effective)
Max per Cluster 23.60 PBe (4 appliances)
NVMe TLC SSD Options 1.92 TB, 3.84 TB, 7.68 TB, 15.36 TB
NVMe QLC SSD Options 15.36 TB, 30.72 TB
Optane SCM Option 750 GB (write-intensive caching)
Drive Security All drives are SED. FIPS 140-2 / 140-3 Level 2 optional
Data Reduction 5:1 guaranteed (hardware compression, global deduplication, thin provisioning)

Front-End Networking

Max Front-End Ports 24 total
10/25GbE Optical Ports Up to 24 (SFP28, 4-port embedded + 4-port optional IO modules)
100GbE Optical Ports Up to 8 (QSFP28, 2-port module, slot 0 only)
32Gb Fibre Channel Ports Up to 16 (4-port modules, supports 32/16/8/4 Gb)
10GBASE-T Copper Ports Up to 16 (4-port module, RJ45)
Back-End Expansion 100GbE QSFP (4 ports)
Management Ports 1GbE (2 ports, one per node)

Protocol Support

Block Protocols FC, iSCSI, NVMe/FC, NVMe/TCP
File Protocols NFSv3, NFSv4, NFSv4.1, NFSv4.2, SMB 1/2/3.0/3.02/3.1.1, FTP, SFTP
VMware vVols vVols 2.0 over FC, NVMe/FC, iSCSI, NVMe/TCP

System Limits

Quick Answer: Ceilings rarely bind midrange estates: 10,000 block volumes or clones, 200,000 block snapshots, 18,000 vVols, and 2,000 file systems across 250 NAS servers. Individual volumes and file systems both stop at 256TB, and four appliances — models may differ — cluster into one managed system.

Scale Limits

Max Block Volumes / Clones 10,000
Max Volumes per Volume Group 128
Max Volume Groups 125
Max Volume Size 256 TB
Max Snapshots (Block) 200,000
Max User File Systems 2,000
Max NAS Servers 250
Max File System Size 256 TB
Max vVol Storage Containers 200
Max vVols 18,000
Cluster Scale-Out Up to 4 appliances, mixed models allowed

Software Features

Quick Answer: Almost everything is bundled: thin provisioning and clones, a 5:1 reduction guarantee, Dynamic Resiliency Engine, immutable snapshots, file-level retention, SED encryption with external key management, and both synchronous and asynchronous block replication. Only Metro Volume and Metro File need licenses, and those add a third-site witness for synchronous cross-site pairs.

Data Efficiency

Thin Provisioning Included
Thin Clones Included
Data Reduction 5:1 guarantee, hardware compression, global deduplication, zero-detect
Dynamic Resiliency Engine Included (protects against multiple simultaneous drive failures)

Data Protection

Local Snapshots Included (up to 200K)
Immutable & Secure Snapshots Included (ransomware protection)
File Level Retention (FLR) Included
Encryption SED-based with self-managed or external key management (KMIP)

Replication

Synchronous Replication (Block) Included
Asynchronous Replication (Block/File) Included
Metro Volume Licensed feature (synchronous with 3rd-site witness)
Metro File Licensed feature
PowerProtect DD Integration Included (manage backups directly from PowerStore)

Management and Automation

Management Interface PowerStore Manager GUI, CLI, REST API
Infrastructure Observability Cloud-based analytics with ProSupport
Quality of Service Block and vVols
Automation Ansible modules, PowerStore REST API, PowerShell SDK
Monitoring Syslog, SNMP, email alerts, CloudIQ

Physical and Environmental Specifications

Quick Answer: PowerStore 3200T is a 2U dual-node chassis about 8.72 cm high and 44.72 cm wide, with dual hot-swap PSUs, front-serviceable NVMe bays, and ENERGY STAR certification. Plan rack depth, airflow, and dual PDU feeds before delivery; environmental limits follow the Dell install guide.

Physical Dimensions

Height 8.72 cm (3.43 in) — 2U
Width 44.72 cm (17.61 in)
Depth 79.55 cm (31.32 in)
Weight (empty) 35.8 kg (79 lb)
Weight (fully populated) 41.7 kg (92 lb)

Power and Cooling (Base Enclosure)

AC Line Voltage 200-240 VAC ±10%, single phase, 47-63 Hz
Typical Power (26°C) 1,056.4 W (1,078 VA)
Max Power (40°C) 1,393.6 W (1,422 VA)
Typical Heat (26°C) 3,605 BTU/hr
Max Heat (40°C) 4,755 BTU/hr
Typical Current (26°C) 5.4 A at 200V
Max Current (40°C) 7.1 A at 200V

Environmental

Operating Temperature 10°C to 35°C (50°F to 95°F)
Non-Operating Temperature -40°C to 70°C (-40°F to 158°F)
Operating Humidity 8% to 80% non-condensing
Operating Altitude Up to 3,048 m (10,000 ft)
Acoustic Noise 71.6 dB (bystander position)

Certifications and Compliance

Security Common Criteria EAL2 (PowerStoreOS 3.5), DoDIN APL, FIPS 140-2/140-3
Network IPv6 USGv6-R1 certified
EMC/EMI FCC Class A, CE, ICES-003, VCCI, BSMI, KC, RCM
Safety UL/CSA, IEC 62368-1, CB, CE, UKCA, BIS, NOM
RoHS Compliant
ENERGY STAR Certified

3200T vs 1200T vs 5200T Spec Comparison

Quick Answer: PowerStore 3200T sits between 1200T and 5200T on CPU, cache, and object limits while sharing the same ~5.90 PBe per-appliance capacity envelope. Choose 1200T for lighter VM estates, 3200T for 100–300 VMs, and 5200T when you need higher sustained IOPS or denser replication workloads.

Use this ladder before you freeze the BOM. Full narrative comparison lives in the 3200T vs 1200T buying guide and the 3200T vs 5200T vs 9200T ladder.

Spec1200T3200T5200T
Form factor2U dual A/A2U dual A/A2U dual A/A
CPU cores (typical)Lower midrange64 cores @ 2.1 GHzHigher midrange
System memoryLower than 3200T768 GB (384 GB/node)Higher than 3200T
Base NVMe slots~2525~25
Max drives / appliance~9393 (25+68)~93
Max effective / appliance~5.90 PBe~5.90 PBe~5.90 PBe
Best-fit VM count~50–120 VMs~100–300 VMs~250–500+ VMs
Front-end fabricsFC / iSCSI / NVMeFC / iSCSI / NVMe/TCP / NVMe/FCSame + higher headroom

Capacity ceilings look similar because PowerStore T models share drive and expansion envelopes. Performance and object limits diverge with controller tier. If your bottleneck is IOPS latency under mixed VDI + database load, step up; if the bottleneck is usable TB after reduction, add drives or ENS24 shelves first. See the T-series use-case map for family context.

Performance Baselines and Workload Expectations

Quick Answer: Expect sub-millisecond NVMe latency for random reads on warm datasets, multi-hundred-thousand IOPS class throughput on dense TLC packs, and line-rate 25/100GbE when hosts and switches are clean. Real RFQ numbers depend on block size, queue depth, reduction ratio, and whether Metro or replication is active.

Published peak numbers are useful for vendor comparison, not for BOM sizing alone. For Hong Kong midmarket estates we typically validate:

  • OLTP / SQL mixed: 8K–16K blocks, 70/30 read/write, target <1 ms median latency at planned peak
  • VMware general: 32K–64K blocks, snapshot and clone churn included in the soak window
  • VDI boot storms: size for concurrent login peaks, not average daily IOPS
  • Backup / ingest windows: sequential throughput limited by host adapters and switch oversubscription first
Workload classDrive pack starting pointFabric preferenceWatch-outs
100–150 VMs mixed12–16× 3.84–7.68 TB TLC25GbE iSCSI or NVMe/TCPSnapshot retention days
150–300 VMs + DB16–25× TLC + ENS24 plan32Gb FC or 100GbEMetro/async pair bandwidth
VDI 500–1,000 seatsDense TLC, high reductionNVMe/TCP preferredBoot storm concurrency
File + block consolidationTLC or QLC (Q SKU)Mixed NAS + SAN portsFile protocol CPU share

Always-on data reduction changes usable capacity more than raw IOPS. Size usable TB from measured reduction on a representative sample, not the 5:1 guarantee alone. For fabric BOM details, use the network interface guide.

Typical Configurations: Three Buying Scenarios

Quick Answer: Most Hong Kong RFQs land in three BOM patterns: lean VMware midrange, dense consolidation with expansion, and dual-site replication. Each starts from the same 3200T controller pair; drive count, IO modules, optics, and support term usually drive 60–70 percent of quote variance across otherwise identical SKUs.

Scenario A — Lean VMware Midrange (100–150 VMs)

  • 1× PowerStore 3200T appliance (dual controllers)
  • 12–16× NVMe TLC drives (3.84 or 7.68 TB class)
  • 2× 25GbE or 32Gb FC IO modules for hosts
  • No expansion enclosure at day one; reserve rack U for ENS24
  • 3-year ProSupport Plus typical
  • Indicative HKD band: see Hong Kong price guide midrange rows

Scenario B — Dense Consolidation (200–300 VMs + file)

  • 1× 3200T with 20–25 base drives + 1× ENS24 planned within 12 months
  • Mixed block + NFS/SMB; confirm mezz/cluster ports
  • 100GbE or dual-fabric FC for headroom
  • Immutable snapshots + replication license path verified on quote
  • Use VMware capacity guide for datastore math

Scenario C — Dual-Site / Metro Intent

  • Matched 3200T pairs (or 3200T + higher tier at DR)
  • Synchronous or Metro Volume with witness design
  • Dark fibre or low-latency metro link budgeted separately
  • Freeze RPO/RTO before drive SKUs; fabric often dominates cost
  • Migration from Unity XT: follow Unity to PowerStore migration

Capacity Planning Worked Examples

Quick Answer: Convert business TB to usable raw by dividing by the measured data-reduction ratio, then add growth, snapshot reserve, and spare. A 120 TB used VMware estate at 3.5:1 effective needs roughly 34 TB raw before growth; at 30% growth and 20% snapshot headroom you should buy closer to 53 TB usable raw.

Example 1 — VMware estate: Current used = 120 TB. Sampled reduction = 3.5:1. Raw need today ≈ 120 / 3.5 = 34.3 TB. Add 30% growth (44.6 TB) and 20% snapshot/clone headroom ≈ 53.5 TB usable. With 7.68 TB TLC drives and RAID/DP overhead, a 12–16 drive pack is the usual starting RFQ.

Example 2 — Database + VMs: DB is only 2:1 reducible; VMs are 4:1. Weighted average often lands near 2.5–3:1. Do not apply the VDI 6:1 marketing ratio to SQL volumes.

Example 3 — Cluster path: If year-3 used capacity exceeds ~70% of one appliance after efficiency, plan a second appliance in the four-node cluster envelope rather than overstuffing one chassis. Pillar economics and TCO: Dell PowerStore Complete Guide 2026.

InputExample valueFormula note
Used logical TB120From vCenter / array report
Measured reduction3.5:1Sample, not brochure
Raw today~34 TBlogical / ratio
Growth (24–36 mo)30%Business forecast
Snapshot reserve15–25%Policy dependent
Buy target usable~50–55 TBBefore sparing

Case Snapshot: Midmarket VMware Refresh

Quick Answer: A Hong Kong services firm moved ~180 VMs from aging hybrid arrays to a single PowerStore 3200T with 16× 7.68 TB TLC and 25GbE NVMe/TCP. Cutover used Storage vMotion over four weekends; post-move p95 latency dropped under 1 ms and usable free space rose ~2.2× after reduction stabilized.

Before: Two midlife hybrid arrays, ~95 TB used, nightly backup windows slipping past 06:00, no consistent snapshot immutability.

BOM chosen: PowerStore 3200T, 16 TLC drives, dual 25GbE modules, 3-year support, no ENS24 at day one.

Migration: New cluster online in week 1; Storage vMotion waves by datastore criticality; final decommission at week 6.

Outcome (90 days): Median VM latency <1 ms; backup window finished before 04:30; effective free capacity ~2.2× vs pre-move raw free; ops team standardized on one PowerStoreOS toolchain.

For competitor framing before you commit, review PowerStore vs NetApp AFF.

RFQ BOM Checklist for PowerStore 3200T

Quick Answer: A comparable Dell PowerStore 3200T request for quotation lists controllers, drive stock keeping units and quantities, input output modules, optics, expansion enclosure intent, target PowerStoreOS release, self-encrypting drive requirements, replication or Metro options, and support term as separate lines. Missing any line makes competing quotes impossible to score fairly.

  1. Appliance model: PowerStore 3200T (confirm not 3200Q unless QLC is intended)
  2. Drive part numbers, capacity class, TLC vs QLC, quantity, sparing policy
  3. Front-end IO modules: speed, protocol, quantity per node
  4. Optics / DAC / AOC lengths matched to rack layout
  5. Cluster/mezz connectivity requirements
  6. ENS24 quantity now vs reserved rack space
  7. Software: replication, Metro Volume, AppsON if any
  8. Security: SED, KMIP, immutable snapshots retention
  9. Support: ProSupport / Plus years and 4-hour options
  10. Installation / migration professional services scope
  11. Delivery location Hong Kong and preferred week
  12. Acceptance tests: latency, failover, snapshot restore drill

Submit structured RFQs via Request Quote so BENQUAN can return line-comparable HKD pricing.

Migration Notes from Unity XT and Peer Arrays

Quick Answer: Most VMware estates migrate to PowerStore 3200T with Storage vMotion in phased waves over four to eight weeks. SAN-only hosts can use PowerStore Import or host-based copy instead; schedule zoning, multipathing, and backup changes before the first production cutover weekend to reduce risk.

Recommended sequence:

  • Week 0: discovery — used TB, reduction sample, fabric inventory
  • Week 1–2: rack, cable, initialize, attach hosts, soak test
  • Week 3–6: Storage vMotion by datastore priority
  • Week 7–8: decommission old arrays after backup verification

Step-by-step: Unity to PowerStore migration guide. Platform differences: PowerStore vs Unity XT.

Operations Best Practices After Go-Live

Quick Answer: After cutover, freeze snapshot policies, enable alerting on capacity and latency SLOs, test failover quarterly, and keep PowerStoreOS within Dell support matrix. Most post-install tickets come from fabric errors, not controller faults, so monitor switch optics and host multipathing first.

  • Set capacity alerts at 70% and 85% usable
  • Document RPO/RTO and prove restore monthly
  • Keep one clean change window for PowerStoreOS upgrades
  • Track reduction ratio drift after major app onboarding
  • Revisit ENS24 purchase when 90-day forecast crosses 75%

Frequently Asked Questions

Quick Answer: The five recurring questions cover cache (768GB across two controllers), CPU (four Xeons, 64 cores), ceiling capacity (5.90 PBe per appliance, 23.60 PBe across a four-appliance cluster), front-end networking (up to 24 ports mixing 25GbE, 100GbE and 32Gb Fibre Channel), and which data services arrive without extra licensing.

PowerStore 3200T has 768GB of system memory (384GB per controller) with 2 NVRAM modules for write cache protection.

PowerStore 3200T uses 4 Intel Xeon processors with 64 total cores at 2.1 GHz.

Per appliance, the 3200T supports up to 5.90 PBe effective capacity with 93 drives (25 base + 68 expansion). Per cluster (up to 4 appliances), maximum capacity is 23.60 PBe.

PowerStore 3200T supports up to 24 front-end ports including 24 10/25GbE, 8 100GbE, and 16 32Gb Fibre Channel ports. Back-end expansion uses 100GbE QSFP.

All core data protection is included: thin provisioning, thin clones, snapshots (200K max), synchronous and asynchronous replication, Metro Volume with 3rd-site witness, immutable snapshots, SED encryption with KMIP, and PowerProtect DD integration.

Key Takeaway

Key Takeaway: The 3200T carries 100–300 VM estates in 2U: 25 NVMe slots, 93 drives max via three ENS24 shelves, 5.90 PBe per appliance, and up to 24× 25GbE, 8× 100GbE, or 16× 32Gb FC front-end ports. Freeze drive mix, fabric ports, and Metro licensing before PO; everything else ships bundled. BENQUAN GLOBAL LIMITED supplies Dell PowerStore 3200T with competitive pricing.

Not sure your 3200T BOM is optimal?

If drive pack, cache, IO modules, or VMware capacity assumptions are unclear, click below for a free compatibility and delivery risk assessment. Fast global BOM validation and risk assessment.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk

Contents