Quick Take
Quick Take: PAN-PA-SURGE-A and PAN-PA-SURGE-B are commercial surcharge SKUs on the same base — PA-Series Firewall List Price (hardware). A = $0.10 per $1 (10%). B = $0.15 per $1 (15%). Neither is a chassis, a subscription, or Ethernet SPD. Freeze the letter from the quote as its own RFQ row. Soft channel net pending confirmation.
If the distributor printed SURGE-B and your workbook still says SURGE-A, CapEx moves by five percentage points of chassis list before anyone talks discount. Copy the letter first. Then confirm the base is hardware list only — not Threat years.
What are PAN-PA-SURGE-A and PAN-PA-SURGE-B?
Quick Answer: Commercial surcharge SKUs on PA-Series firewall list — not chassis, not subscriptions, not Ethernet SPD.
Typical scene: a PA-Series quote already named PAN-PA-440 or PAN-PA-5410 plus three years of Threat. Finance approved the chassis column. Then a line appears — PAN-PA-SURGE-A or PAN-PA-SURGE-B. The trap is treating both as “the usual 10%,” or stamping either percent onto subscriptions because “everything is Palo Alto list.”
Think of SURGE as a tire surcharge on a truck quote. The truck (chassis) stays its own line. The surcharge has two rate stickers: A at 10% and B at 15%. Wrong sticker, wrong CapEx.
Family ladder and October policy rates still matter — as a second link: October 3, 2026 PA-Series list surcharge (family rates, not these MPNs).
PAN-PA-SURGE-A vs SURGE-B — which percent?
Quick Answer: Same base. A = $0.10 per $1 (10%). B = $0.15 per $1 (15%). Copy the exact letter.
| MPN | List unit (public formula) | Equals | Base |
|---|---|---|---|
PAN-PA-SURGE-A | $0.10 per $1 of PA-Series firewall list | 10% of hardware list | Firewall list only |
PAN-PA-SURGE-B | $0.15 per $1 of PA-Series firewall list | 15% of hardware list | Firewall list only |
Shared rules: own RFQ row; HA = same letter twice when there are two chassis lists; soft channel net pending confirmation. Do not invent a third percent from chat.
What does the percent attach to?
Quick Answer: PA-Series Firewall List Price — hardware. Not Threat, URL, WildFire, or support years.
| Line | On this freeze | RFQ action |
|---|---|---|
| PAN-PA-SURGE-A / B | Percent of firewall list | Own row; letter from the quote |
| PA-Series chassis | The list the percent multiplies | Chassis MPN × qty separate |
| Threat / URL / WildFire / support | Not the stated SURGE base | Leave off this row |
| PAN-NGFW-SLS | Different %-of-HW SKU | Do not nest SURGE on it |
| Ethernet SPD / IEC 61000-4-5 | Wrong product class | Unfit for this MPN |
| Oct 3 family rates | Policy instrument | Second page — not this H1 |
The $0.10 / $0.15 formulas are list-structure identities. Public pages do not show chassis dollars or a computed surcharge total. Soft channel net is industry estimate / pending confirmation.
Fit / Unfit — when to use which letter
Quick Answer: Use A or B when the quote names that MPN. Never as a silent chassis substitute or a stamp on subscriptions.
- Fit: PA-Series RFQ that must show the hardware-list surcharge as its own MPN; HA pair with one base per chassis list; open quotes that named chassis but omitted the SURGE letter that the distributor already printed.
- Unfit: Silent PA-440 / PA-5410 substitute; stamping 10% or 15% onto Threat / URL / WildFire / support; Ethernet SPD hardware; nesting SURGE on PAN-NGFW-SLS; treating Oct 3 family 15% as the same cell as SURGE-B.
How do you freeze the correct SURGE letter on one RFQ?
Quick Answer: Copy MPN → confirm letter → lock hardware-list base → count HA → keep Oct 3 separate → send the pack.
- Step 1 — Copy the exact MPN. Write PAN-PA-SURGE-A or PAN-PA-SURGE-B — not “surge” alone.
- Step 2 — Confirm the letter matches the quote. A is 10%. B is 15%. Swapping letters moves five points of chassis list.
- Step 3 — Lock the base. PA-Series firewall list / hardware only. Leave Threat, URL, WildFire, and support years off this row.
- Step 4 — Count HA. Two chassis lists → two SURGE lines with the same letter.
- Step 5 — Separate Oct 3 family rates. Link the policy page if needed. Do not merge instruments into one cell.
- Step 6 — Send the pack. Chassis MPN × qty, HA, SURGE letter, support years. Net stays pending confirmation.
Small first step: open your current quote, find the SURGE cell, and write only the full MPN next to chassis qty. If two colleagues read the same letter, the freeze works.
Typical RFQ scenes
Quick Answer: Missing line, wrong letter, percent on Threat, dual-box lump — four failures that show up before PO.
Scene A — missing line. Chassis approved; SURGE absent. PO rejects. Add the letter the distributor already used.
Scene B — wrong letter. Workbook says SURGE-A; quote shows SURGE-B. CapEx moves five points of chassis list. Copy the quote letter.
Scene C — percent on Threat years. Wrong base. Hardware list only unless a dated quote renames the base.
Scene D — dual-box one lump. Two chassis lists mean two SURGE lines with the same letter.
These are typical procurement failures, not named customers. Confirm quantity, HA, software train, and support years on the same brief before you freeze CapEx.
FAQ
Quick Answer: A and B share one base and differ by five points of chassis list. Own row. Hardware list only. Net pending confirmation.
No. Both are commercial surcharge SKUs. A = $0.10 per $1 of PA-Series firewall list (10%). B = $0.15 per $1 (15%). The chassis MPN stays its own hardware line.
Not on this freeze. The stated base is PA-Series firewall list — hardware. Do not stamp either percent onto Threat, URL, WildFire, or support years unless a later dated quote names that base.
Same base, different list unit. A = $0.10 per $1 (10%). B = $0.15 per $1 (15%). Copy the exact MPN from the distributor quote. Soft channel net pending confirmation.
No. Oct 3 family rates (PA-400/1400 15%, PA-3400/5400 10%, PA-500 +15% base list) live on the October policy article. SURGE-A/B are named MPNs with their own $0.10/$0.15 formulas. If a PA-400 quote mixes both instruments, flag the mismatch — pending confirmation.
One surcharge base per firewall list. Two boxes → two lines of the same letter (two A or two B), not one lump and not one A plus one B unless the quote literally says so.
Quote list, net, and discount stay off public pages. The $0.10 and $0.15 lines are formulas, not published chassis dollars. Channel figures are industry estimate / pending confirmation on the RFQ.
References
Quick Answer: Product identity follows Palo Alto PA-Series NGFW and hardware docs. Family rate policy is a separate BENQUAN article. Checked 23 October 2026.
Key Takeaway
Key Takeaway: Freeze the letter on the quote: PAN-PA-SURGE-A = 10% ($0.10 per $1) or PAN-PA-SURGE-B = 15% ($0.15 per $1) of PA-Series firewall list — hardware only — then write chassis MPN × qty beside it. BENQUAN GLOBAL LIMITED supplies PAN-PA-SURGE-A / SURGE-B RFQ mapping with competitive pricing and configuration support. Channel net pending confirmation.