Network Security / Palo Alto / New chassis / October 2026

Oct 2026: +2,367 PA SKUs; PA-5510 Class?

PA-5510 is not a mistyped PA-5400. Soft LIST starts at USD 198,000 — and it is still missing from the September Lookup.

Quick Take

Quick Take: The October 2026 Palo Alto commercial price file adds about 2,367 SKUs versus September, led by PA-5510 / PA-5520 / PA-5530 and PA-1510-POE. Soft chassis LIST spans USD 3,050 to 299,000. Retained LIST is flat. This is not the 3 October Gen 4/5 surcharge, and public Lookup is still dated 30 September 2026.

You asked for a PA-5400 refresh and the reply came back with PA-5510-AC. That is not a typo and not the October 3 surcharge. It is a new chassis family with its own soft LIST — and it is still missing from the public Lookup dated 30 September 2026.

What exactly changed in the October 2026 commercial price file?

Quick Answer: September file ≈ 11,363 SKUs → October file ≈ 13,730 SKUs (+2,367 / −0). Of overlapping SKUs, LIST up = 0 and LIST down = 0. The growth is almost entirely new hardware plus the subscription and support packs that travel with those chassis.

Definition: a commercial LIST is the vendor’s published USD reference for an orderable code. It is the starting line of a quote, not the net you pay. Channel net, stock and lead time sit on a dated quote and stay pending confirmation until that sheet lands.

Think of it like a car dealer adding a new model year to the lot while keeping last year’s sticker prices. The new badges get new stickers; the old badges do not get a blanket hike in this file. Separately, on 3 October, Gen 4/5 hardware took a surcharge action — that is a different letter and a different column on your RFQ.

MetricSeptember 2026 fileOctober 2026 file
SKU rows≈ 11,363≈ 13,730
Added / removed—+2,367 / 0
Retained LIST up / down—0 / 0
New HW chassis lines (priced)—38 of 44 HW adds
Public SKU Lookup date2026-09-30 (15,846)Still 2026-09-30 — no PA-5510 yet
  • Fit: integrators sizing a new DC firewall beyond PA-5400; campus / branch bids that need PoE or 5G on the appliance; buyers who received PA-5510 / PA-1510-POE on a quote and cannot find them in Lookup.
  • Unfit: anyone only repricing Gen 4 PA-400/1400/3400/5400 or Gen 5 PA-500 under the 3 October surcharge — use the surcharge page instead; retail single-unit shoppers.

What soft LIST do you use for PA-5510, PA-5520 and PA-5530?

Quick Answer: On the October 2026 commercial price file, PAN-PA-5510-AC and PAN-PA-5510-DC soft LIST at USD 198,000; PA-5520 twins at 254,000; PA-5530 twins at 299,000. AC and DC share the same LIST. Treat every figure as industry estimate until channel net is confirmed on a dated quote.

Catalog SKUSoft LIST (USD)Role
PAN-PA-5510-AC / PAN-PA-5510-DC198,000New PA-5500 DC class
PAN-PA-5520-AC / PAN-PA-5520-DC254,000Mid PA-5500
PAN-PA-5530-AC / PAN-PA-5530-DC299,000Top PA-5500
PAN-PA-5510-VSYS-1023,000VSYS upgrade pack
PAN-PA-5520-VSYS-5082,500VSYS upgrade pack
PAN-PA-5530-VSYS-100125,000VSYS upgrade pack
PAN-PA-5500-SSD-3.84TB-PAIR-A216,000SSD assembly
PAN-PA-5500-SSD-960G-PAIR-A27,000SSD assembly

Each PA-55xx family also carries roughly eighty subscription and support SKUs in the same file (Threat Prevention, Advanced URL, multi-year and HA-style variants). If the tender needs Threat Prevention Year-1, paste the matching PAN-PA-5510-* attach line — do not invent a PA-5400 attach code for a PA-5510 chassis.

When do you RFQ PA-5510 instead of keeping a PA-5400 refresh?

Quick Answer: Keep the PA-5400 path when the design still fits the existing chassis and you only need Gen4 surcharge math. RFQ PA-5510 / 5520 / 5530 when the quote already names those codes, or when a DC refresh has outgrown PA-5400/5450 and you need a new family — not a mistyped 5400. Do not invent PA-5510 Threat Prevention Gbps until a dated datasheet lands; this table is commercial identity, not a throughput bake-off.

CheckPA-5400 / PA-5450 pathPA-5510 / 5520 / 5530 path
Price-file identityGen 4 family already on September LookupNew codes on October 2026 commercial file
Soft LIST exampleUse the dated PA-5400 quote / series page — do not paste 5510 LIST herePAN-PA-5510-AC USD 198,000 (industry estimate / pending confirmation)
3 Oct Gen4/5 surchargeApplies to PA-400/1400/3400/5400Do not stack 10% or 15% on PA-5510 unless a later notice says so
Public Lookup 2026-09-30Rows existZero PA-5510 rows — cite the October file date
Attach prefixPAN-PA-54xx-*PAN-PA-55xx-* — never reuse a 5400 attach on a 5510 chassis
Throughput rowsSize on the PA-5400 datasheet Threat rowsPending a public PA-5500 datasheet — do not copy 5400 Gbps onto 5510

Typical scene: the integrator asked for a PA-5410 or PA-5445 refresh and the distributor returned PAN-PA-5510-AC. That is a new orderable chassis, not a SKU typo. Send both the old PA-5400 BOM and the new MPN so BENQUAN can map LIST vs surcharge vs Lookup lag in one business day. Mbps for PA-5510 stay pending confirmation until the vendor sheet prints them.

Why must you not mix this with the Gen 4 / Gen 5 October 3 hike?

Quick Answer: The 3 October NextWave action puts a temporary list surcharge on Gen 4 PA-400/1400/3400/5400 and moves Gen 5 PA-500 base list. The October commercial price file instead adds new orderable chassis such as PA-5510. Stacking a 10% or 15% surcharge on PA-5510 soft LIST is wrong unless a later vendor notice says so.

Use How to Handle PA Gen4/5 Price Hike Oct 2026 for PA-400 / PA-1400 / PA-3400 / PA-5400 / PA-500 math. Use this page for PA-5510 / PA-1510-POE soft LIST. If a distributor rolls both into one “October uplift” percentage, ask them to split the columns.

Why does SKU Lookup still show 30 September 2026?

Quick Answer: Public Palo Alto Lookup on benquan.hk is still catalog date 2026-09-30 with 15,846 SKUs. That September revision added Advanced IP Defense depth — see the September catalog delta — and still has zero PA-5510 or PA-1510-POE rows for buyers to search.

Empty Lookup search is not proof the MPN is fake. It is proof the public index lags the October commercial file. Put the price-file date in the RFQ note so the reviewer does not reject the line.

Which PoE and rugged SKUs landed with soft LIST?

Quick Answer: Soft LIST on the October file: PAN-PA-1510-POE USD 25,500; PA-1520-POE 36,000; PA-1530-POE 46,000; PAN-PA-54R-POE 8,700; PA-54R-POE-D-5G 10,700; PA-56R-POE-5G 14,900; and PA-520-5G 3,050. Spare 1200W PoE PSU PAN-PWR-1200W-54V-AC-A lists at 2,550 — channel net pending confirmation.

Catalog SKUSoft LIST (USD)Note
PAN-PA-1510-POE25,500PoE branch; kit includes PSU / rack / US power cord per description
PAN-PA-1520-POE36,000PoE branch
PAN-PA-1530-POE46,000Dual 1200W AC in kit
PAN-PA-54R-POE8,700Rugged PoE
PAN-PA-54R-POE-D-5G10,700Rugged PoE + 5G
PAN-PA-56R-POE-5G14,900Rugged PoE + 5G
PAN-PA-520-5G3,050Branch 5G
PAN-PWR-1200W-54V-AC-A2,550Spare PSU for PA-15x0-POE

Write PoE watt budget and antenna / rack kit needs in the RFQ comments. Cellular antenna SKUs such as PAN-PA-5G-ANTENNA-SET (USD 450) and PAN-PA-5G-ANT-4X4-5M-SMAM (USD 600) appear beside the 5G chassis in the same file.

Do you order subscriptions with the new chassis?

Quick Answer: Yes when the tender needs Threat Prevention, Advanced URL or multi-year cover. The October file ships full attach packs under each new chassis prefix. Example soft LIST: PAN-PA-5510-ATP and PAN-PA-5510-ADVURL at USD 59,400 each for the one-year style codes shown — channel net still pending confirmation.

HA-style and 3YR/5YR variants exist with their own codes. Mirror the structure you already use on PA-5400 bids — same discipline, new prefix. Net on attach is pending confirmation just like chassis net.

Where does this show up on a real project?

Quick Answer: Three typical scenes, not named customers: a DC refresh that outgrew PA-5450 sizing and drafts PAN-PA-5510-AC; a branch PoE bid that replaces a switch-plus-firewall pair with PA-1510-POE; and a rugged 5G edge where PA-54R-POE-D-5G lands on the first distributor draft.

  • DC refresh: Old BOM says PA-5450; new draft says PAN-PA-5510-AC. Re-price at USD 198,000 soft LIST, add ATP/URL, keep Gen4 surcharge off this line.
  • Campus PoE: Spec asks for firewall-native PoE. Use PA-1510/1520/1530-POE soft LIST and call out spare PSU.
  • Edge 5G: Quote PAN-PA-56R-POE-5G or PA-520-5G with antenna kit lines explicit so receiving docks the full kit.

How do you RFQ PA-5510 or PA-1510-POE without mixing the surcharge?

Quick Answer: Split Gen4/5 surcharge, Lookup date and October price-file MPNs into three columns. Pick the exact AC/DC or PoE code, paste October soft LIST, add required attach, write “Lookup still 2026-09-30” in the note, then send the BOM for a dated dual-path quote.

  1. Step 1 — Separate three October events — Column A = Gen 4/5 surcharge (3 Oct). Column B = Lookup catalog date 2026-09-30. Column C = this October commercial price file with new PA-5500 / PA-1500-POE MPNs. Never merge the three into one %.
  2. Step 2 — Pick the chassis MPN — DC class: PAN-PA-5510-AC/DC, PAN-PA-5520-AC/DC, or PAN-PA-5530-AC/DC. PoE branch: PAN-PA-1510-POE / 1520-POE / 1530-POE. Rugged/5G: PAN-PA-54R-POE, PAN-PA-56R-POE-5G, PAN-PA-520-5G.
  3. Step 3 — Paste soft LIST from the October file — Use the table on this page as the starting LIST. Mark every figure industry estimate / pending confirmation. Ask the distributor to show LIST date, net, stock and validity on one sheet.
  4. Step 4 — Add attach, do not ship a naked chassis — Each new family in the October file includes Threat Prevention / URL / support style packs. If the tender needs subscriptions, list them as separate lines with the same chassis prefix.
  5. Step 5 — Flag Lookup lag in the RFQ note — Write: “MPNs from October 2026 commercial price file; public Lookup still 2026-09-30.” That stops a reviewer from killing the line because SKU Lookup search returned empty.
  6. Step 6 — Send the BOM to BENQUAN — One target model or the old PA-5400 / PA-1400 BOM is enough. We return mapped MPNs and a soft LIST table in one business day. Worldwide shipping; channel net pending confirmation.

What do you send in the first RFQ email?

Quick Answer: Send the target chassis or the old PA-5400 / PA-1400 BOM, state AC versus DC, say whether Threat Prevention Year-1 is required, name the destination for logistics, and note that MPNs come from the October 2026 commercial price file — Lookup may still show empty.

  • One line: PAN-PA-5510-AC ×2 + PAN-PA-5510-ATP ×2 — or paste the full spreadsheet.
  • Ask for: soft LIST date, net, stock, validity — all pending confirmation until answered.
  • Channel: rfq.html?intent=bom-risk.

Which mistakes burn budget on these new codes?

Quick Answer: The budget burns when you apply Gen4 surcharge percent to PA-5510, order AC into a DC plant, ship a chassis without the attach the tender requires, or treat an empty Lookup search as proof the SKU is invalid instead of a lagging index.

  • Do not rename PA-5510 to PA-5400 to “make Lookup happy.”
  • Do not assume September Prisma discount tweaks mean every firewall got cheaper.
  • Do not publish or demand channel net as if it were LIST.

FAQ

No. PA-5510 / 5520 / 5530 are new October 2026 commercial-file chassis. Do not paste PA-5400 attach codes or Gen4 surcharge percent onto them, and do not copy PA-5400 Threat Prevention Gbps until a public PA-5500 datasheet prints those rows. Soft LIST for PAN-PA-5510-AC is USD 198,000 — industry estimate / pending confirmation.

Not on the public Lookup dated 30 September 2026 (15,846 SKUs). That revision has zero PA-5510 and zero PA-1510-POE rows. The October 2026 commercial price file already lists them. Cite the price-file date on the RFQ; do not wait for Lookup to catch up before you ask for a quote.

No. The October 3 NextWave action is a temporary surcharge on Gen 4 PA-400/1400/3400/5400 and a base-list move on Gen 5 PA-500. This page is about new chassis families that appeared in the October 2026 commercial price file. Keep surcharge math and new-chassis soft LIST on separate columns.

USD 198,000 for PAN-PA-5510-AC and the same figure for PAN-PA-5510-DC on the October 2026 commercial price file. That is a vendor LIST reference, not channel net. Net, stock and lead time stay pending confirmation on a dated quote.

PAN-PA-5520-AC/DC soft LIST USD 254,000; PAN-PA-5530-AC/DC USD 299,000. Each family also ships with a full subscription and support pack in the same price file — roughly eighty SKUs per chassis family when you count attach.

When the site needs PoE powered ports on the firewall itself. Soft LIST: PAN-PA-1510-POE USD 25,500; PA-1520-POE 36,000; PA-1530-POE 46,000 (dual PSU kit). Accessories such as PAN-PWR-1200W-54V-AC-A (USD 2,550) sit beside the chassis. Confirm PoE budget in the RFQ notes.

On retained rows, no. The September-to-October compare shows zero LIST increases and zero LIST cuts on overlapping SKUs. About eleven Prisma-related rows deepened the published discount column. That is not a chassis LIST hike.

Order the power variant the rack needs. Example: PAN-PA-5510-AC vs PAN-PA-5510-DC at the same soft LIST. Mixing AC and DC on a dual-PSU chassis is a classic BOM reject. State the power plant in the RFQ subject line.

References

Key Takeaway

Key Takeaway: For late-October 2026 RFQs, put PA-5510 / PA-5520 / PA-5530 and PA-1510-POE soft LIST from the October commercial price file on their own lines — USD 198,000, 254,000, 299,000 and 25,500–46,000 — keep Gen4/5 surcharge math separate, and note Lookup still reads 2026-09-30. BENQUAN GLOBAL LIMITED supplies Palo Alto Networks firewalls with competitive pricing.

Need a dual-path quote on PA-5510 or PA-1510-POE?

Send the target chassis or your current PA-5400 / PA-1400 BOM. Soft LIST table back in one business day — net and stock pending confirmation.

Request Quote

Contents