Quick Take
Quick Take: Deciding between Palo Alto PA-1410 and FortiGate 100F? Choose the PA-1410 for higher Threat Prevention throughput (2.4 Gbps) and 4x 10G SFP+ uplink density. Choose the FortiGate 100F (FG-100F-BDL) for budget-optimized UTP subscription TCO, high GE port count, and fast ex-stock delivery. BENQUAN GLOBAL LIMITED supplies Palo Alto and Fortinet appliances with competitive global pricing and worldwide logistics.
Specs Comparison
Quick Answer: PA-1410 leads on deep Threat Prevention throughput at 2.4 against 1 Gbps, IPS throughput, and 10G SFP+ port count with four against two. FortiGate 100F leads on raw firewall throughput at 20 against 6.8 Gbps, IPsec VPN at 11.5 Gbps, session capacity, and gigabit copper port density.
| Specification | Palo Alto Networks PA-1410 | Fortinet FortiGate 100F (FG-100F) |
|---|---|---|
| Firewall Throughput | 6.8 Gbps | 20 Gbps |
| IPS Throughput | 4.3 Gbps | 1.4 Gbps |
| Threat Prevention Throughput | 2.4 Gbps (DPI) | 1 Gbps (UTP / DPI) |
| IPsec VPN Throughput | 2.9 Gbps | 11.5 Gbps |
| Concurrent Sessions | 500,000 | 1.5 Million |
| New Connections/Sec | 37,000 | 56,000 |
| 10G Interfaces | 4x 10GbE SFP+ | 2x 10GbE SFP+ |
| 1G Interfaces | 8x 1GbE RJ45, 4x 1GbE SFP | 12x 1GbE RJ45, 4x 1GbE SFP, 2x Shared |
| Power Supplies | Dual Hot-Swappable AC PSUs | Dual Internal Fixed AC PSUs |
Overview
Quick Answer: The Palo Alto PA-1410 and Fortinet FortiGate 100F are two of the most deployed 1RU next-generation firewalls for medium enterprise branch offices, regional headquarters of 200 to 500 users, and WAN edge sites. The PA-1410 runs PAN-OS machine learning inspection while the 100F leans on Fortinet's SOC4 ASIC.
As organizations upgrade branch office internet perimeters to multi-gigabit fiber connections and deploy inline SSL/TLS decryption, selecting the right firewall model prevents costly network bottlenecks.
The Palo Alto PA-1410 (PA-1400 Series) brings Palo Alto's Machine Learning-powered PAN-OS 11.x architecture down to a compact 1RU form factor, while the FortiGate 100F leverages Fortinet's custom SOC4 SD-WAN ASIC for high-density hardware acceleration.
Licensing & TCO
Quick Answer: FortiGate 100F UTP bundles typically deliver 35 to 45 percent lower three-year subscription cost than Palo Alto PA-1410 Core Guard or Pro Guard packages. The Fortinet bundle pairs FortiCare Premium support with IPS, malware protection, web filtering and application control, while Palo Alto adds WildFire and Advanced URL Filtering.
Subscription licenses account for the majority of firewall operational expenditure over a 3 to 5 year lifecycle. Compare quotes using these standard package tiers:
FortiGate 100F UTP Bundle (FG-100F-BDL)
Combines FortiCare Premium 24/7 support with IPS, Advanced Malware Protection, Web Filtering, Anti-Spam, and Application Control. SOC4 ASIC offloads IPSec and SD-WAN processing for cost-effective branch routing.
Palo Alto PA-1410 Core Guard / Pro Guard
Includes Advanced Threat Prevention, Advanced URL Filtering, WildFire, and DNS Security. Single-pass inspection maintains consistent 2.4 Gbps throughput even under heavy encrypted traffic inspection.
Lead Time & Sourcing
Quick Answer: Lead times for Palo Alto PA-1410 hardware from tier-one distribution average four to eight weeks. FortiGate 100F appliances are widely held in distributor stock with one to two week fulfillment or immediate ex-stock shipment, which matters when a branch deployment or equipment replacement has a fixed deadline.
For urgent branch deployments or equipment replacement deadlines, sourcing pre-stocked PA-1410 or FG-100F units through authorized global suppliers eliminates project delays. BENQUAN GLOBAL LIMITED maintains channel allocation for both brands.
BOM Risk Checklist
Quick Answer: Four line items commonly stall a branch install. Itemize the 10G transceivers, using PAN-SFP-10G-SR class modules for PA-1410 and FN-TRAN-SFP+SR for FortiGate, confirm dual AC power cords for the PA-1410 hot-swappable supplies, and add rack-mount brackets plus a three or five year support contract.
Check these 4 critical BOM line items before issuing a purchase order:
1. 10G Optical Transceivers
For PA-1410, itemize PAN-SFP-CG-1GB or PAN-SFP-10G-SR transceivers. For FG-100F, itemize FN-TRAN-SFP+SR 10G optical modules for switch uplinks.
2. Power Supply Configuration
Verify dual AC power cables are specified for PA-1410 hot-swappable PSUs to ensure dual-feed rack power compliance.
Frequently Asked Questions
Quick Answer: Engineers most often ask how PA-1410 and FG-100F throughput compare, since the PA-1410 leads on deep threat inspection at 2.4 Gbps while the 100F leads on raw firewall and VPN throughput. Three-year subscription cost and stock availability usually decide the branch refresh once the sizing brief is fixed.
The Palo Alto PA-1410 delivers 2.4 Gbps Threat Prevention throughput with 4x 10G SFP+ ports. The FortiGate 100F delivers 1 Gbps Threat Protection throughput and 20 Gbps raw firewall throughput with 2x 10G SFP+ ports.
FortiGate 100F UTP bundles (FG-100F-BDL) typically offer 35-45% lower total cost of ownership over 3 years compared to Palo Alto PA-1410 Core Guard or Pro Guard subscription packages.
The Palo Alto PA-1410 features dual hot-swappable AC power supplies for high availability. The FortiGate 100F features dual fixed internal power supplies for power redundancy.
BENQUAN GLOBAL LIMITED supplies Palo Alto PA-1410 and FortiGate 100F appliances with competitive global pricing, ex-stock availability checks, and worldwide B2B logistics. Request a quote.
Key Takeaway
Key Takeaway: Freeze Palo Alto PA-1410 when 2.4 Gbps deep Threat Prevention inspection, 4x 10G SFP+ ports, and PAN-OS security features are required. Select FortiGate 100F (FG-100F-BDL) for budget-conscious branch offices needing high GE port density and fast ex-stock delivery. BENQUAN GLOBAL LIMITED supplies both platforms with competitive global pricing and worldwide logistics.