Quick Take
Quick Take: The Palo Alto SKU Lookup catalog dated August 22, 2026 grows from 15,262 to 15,309 SKUs — forty-seven adds, zero removals, zero LIST moves on retained rows. New lines cluster in Cortex AgentiX professional services, NGFW ELA8, SD-WAN ELA and ESA, plus Virtual ION 7132. This is a catalog refresh, not the October 3 list surcharge.
What This GPL Catalog Delta Is
Quick Answer: A Palo Alto GPL catalog delta is an catalog SKU-set change between dated indexes — here July 2 (15,262 SKUs) versus August 22 (15,309 SKUs). Forty-seven lines appear; none leave; retained LIST values stay identical. It expands orderable ELA, ESA, and AgentiX service codes. It does not reprice existing chassis or subscriptions.
Definition: A Palo Alto Networks GPL / SKU Lookup catalog delta is the difference between two dated SKU indexes used for government and commercial ordering. The previous public index baseline was the July 2, 2026 workbook (15,262 SKUs). The new index is dated August 22, 2026 (15,309 SKUs). The diff also aligns with the prior local full index that tracked the same 15,262-SKU set from a June 30 source file.
Buyers freeze Palo Alto BOMs against a catalog date, not against a marketing slide. When the catalog grows without LIST moves on retained rows, the risk is missing new entitlement or support SKUs — not understating a chassis hike that did not happen on August 22.
- Fit this page: Freezing PA NGFW, ELA, SD-WAN ION, or Cortex AgentiX professional-services RFQs against the August 22 catalog; validating new ELA8 and SD-WAN ESA lines before CapEx sign-off.
- Unfit: Readers hunting chassis LIST hike percentages, PA-Series surcharge math, or the October 3, 2026 commercial cliff — use the separate October price-increase guide instead.
Use SKU Lookup (Palo Alto brand) to confirm part presence. For brand-level BOM templates, start at the Palo Alto RFQ hub.
Catalog Numbers: 15,262 to 15,309
Quick Answer: July 2 index: 15,262 SKUs. August 22 index: 15,309 SKUs. Net plus 47 added, zero removed. LIST values on every retained SKU match exactly — zero price moves on the common set. Category mix among the adds: Support 19, Software 18, Professional Services 8, Hardware 2.
These counts come from a full SKU-set diff between the July 2 and August 22 catalog indexs. Retained rows show 0 percent LIST movement versus the July baseline. AgentiX consulting still prints a 40 hours minimum on the hourly SKU and a 5 days minimum on the daily SKU. Deployment Essential runs 3 months and Deployment Enhanced runs 5 months per the new PS codes. They are inventory and service-meter metrics, not a chassis surcharge schedule. Public pages must not reprint LIST dollars because Palo Alto remains outside the public public LIST on SKU Lookup on SKU Lookup.
| Metric | Value | Buyer note |
|---|---|---|
| Previous index date | 2026-07-02 | 15,262 SKUs |
| New index date | 2026-08-22 | 15,309 SKUs |
| SKUs added | 47 | Orderable new codes only |
| SKUs removed | 0 | No deletions in this delta |
| LIST changes on retained SKUs | 0 | All common LIST values identical |
| Public LIST dollars | Not published | LIST not published on this site on SKU Lookup |
| Category among +47 | Count | Theme |
|---|---|---|
| Implementation - Support | 19 | Mostly SD-WAN ESA Gov / Premium / USG tiers |
| Software | 18 | NGFW ELA8 + SD-WAN ELA commercial and Gov |
| Implementation - Professional Services | 8 | Cortex AgentiX / AES consulting and deployment |
| Hardware | 2 | Virtual ION 32-core + HW-coded twin |
Net catalog growth of 47 SKUs with a flat retained LIST set means CapEx shocks on August 22 come from new lines you forgot to attach — not from a silent reprice of yesterday’s chassis. Confirm the quote footer still prints catalog date 2026-08-22 before you treat an old ELA sheet as current.
Added SKU Themes: AgentiX, ELA8, SD-WAN, VION
Quick Answer: Five themes cover the adds: eight Cortex AgentiX professional-services codes, NGFW ELA8 commercial plus Gov, SD-WAN ELA software bundles, SD-WAN ESA support (mostly Gov), and two Virtual ION 7132 hardware SKUs with a matching Premium Support line. Compare themes on separate RFQ columns.
Theme tables below name SKUs and purpose only. They intentionally omit LIST dollars. Treat every commercial figure as pending confirmation on a dated quote.
A) Cortex AgentiX / AES professional services (8)
These sit under Implementation - Professional Services. They buy consulting hours, deployment packages, and project-manager days for Cortex AgentiX / AES — not NGFW chassis capacity.
| SKU | Purpose |
|---|---|
| PAN-CONSULT-1HR-AGENTIX | Consulting hourly; 40 hours minimum (Cortex AgentiX) |
| PAN-CONSULT-DAY-AGENTIX | Consulting per day; minimum 5 days |
| PAN-CONSULT-DS-ADDON-AGENTIX | Addon: 2 expert sessions with Deployment Service (1 month) |
| PAN-CONSULT-DS-ENH-AGENTIX | Deployment Enhanced (5 months) |
| PAN-CONSULT-DS-ESS-AES | Deployment Endpoint for Cortex AES (qty=2 sessions) |
| PAN-CONSULT-DS-ESS-AGENTIX | Deployment Essential (3 months) |
| PAN-CONSULT-DS-EXT-AGENTIX | Deployment 1-month extension |
| PAN-CONSULT-PRJM-DAY-AGENTIX | PS project manager per day (AgentiX) |
B) NGFW ELA8 software (commercial + Gov)
ELA8 is the new enterprise license agreement software family for NGFW subscriptions. Commercial PAN-ENT-SUB-ELA8 covers ATP, ADNS (plus ADNSR-X), AIPD, Advanced URL, Advanced WildFire, PAA, and ASD-WAN for NGFW on a one-year term. Gov counterparts use a unit-price-per-dollar-of-NGFW-hardware-estate mechanism — describe that mechanism on the RFQ; do not invent published rates on this page.
| SKU | Lane |
|---|---|
| PAN-ENT-SUB-ELA8 | Commercial ELA8, 1 YR |
| PAN-ENT-GOV-ELA8-1YR | Gov ELA8, 1 year |
| PAN-ENT-GOV-ELA8-3YR | Gov ELA8, 3 years |
| PAN-ENT-GOV-ELA8-5YR | Gov ELA8, 5 years |
| PAN-ENT-GOV-ELA8-ADDON-1YR | Gov ELA8 addon, 1 year |
C) SD-WAN ELA software (commercial + Gov)
SD-WAN ELA SKUs meter bandwidth and security packs for Prisma SD-WAN / ION estates. Keep them on a separate column from NGFW ELA8 even when one seller bundles both.
| SKU | Purpose |
|---|---|
| PAN-ENT-SUB-SDWAN-ELA | Bandwidth ELA for SD-WAN ION |
| PAN-ENT-SUB-SDWAN-ELA-BSC | Core Security |
| PAN-ENT-SUB-SDWAN-ELA-DSC | Device Security |
| PAN-ENT-SUB-SDWAN-ELA-SCM | SCM Pro includes SLS |
| PAN-ENT-SUB-SDWAN-ELA-SLS | SLS |
| PAN-ENT-GOV-SDWAN-ELA-1YR / -3YR / -5YR / -ADDON-1YR | Gov bandwidth ELA terms |
| PAN-ENT-GOV-SDWAN-ELA-BSC / -DSC / -SCM / -SLS | Gov security / SCM packs |
D) SD-WAN ESA support + Virtual ION support
ESA lines are Implementation - Support. Most new codes are Gov Premium, Premium+4Hr RMA, USG Premium, and USG+4Hr RMA across 1 / 3 / 5 year and addon terms, plus commercial Premium addon rows. Also new: PAN-SVC-PREM-VION-7132 Premium Support for Virtual ION 32-core.
| Family | Examples |
|---|---|
| Gov Premium ESA | PAN-GOV-PREM-SDWAN-ESA-1YR / 3YR / 5YR / ADDON-1YR |
| Gov Premium + 4Hr RMA | PAN-GOV-PREM4HR-SDWAN-ESA-1YR / 3YR / 5YR / ADDON-1YR |
| USG Premium ESA | PAN-GOV-USG-SDWAN-ESA-1YR / 3YR / 5YR / ADDON-1YR |
| USG + 4Hr RMA | PAN-GOV-USG4HR-SDWAN-ESA-1YR / 3YR / 5YR / ADDON-1YR |
| Commercial addon | PAN-PREM-SDWAN-ESA-ADDON-1YR; PAN-PREM4HR-SDWAN-ESA-ADDON-1YR |
| Virtual ION support | PAN-SVC-PREM-VION-7132 |
E) Hardware — Virtual ION 7132 (2)
| SKU | Purpose |
|---|---|
| PAN-VION-7132 | Virtual ION, 32 Core Model |
| PAN-VION-7132-HW | Virtual ION, 32 Core Model (HW-coded twin) |
Order the capacity SKU and the support SKU as a pair. Leaving PAN-SVC-PREM-VION-7132 off a production Virtual ION RFQ is a common trap called out below.
vs October 2026 Price Action
Quick Answer: August 22 expands the catalog with forty-seven new SKUs and zero LIST moves on retained rows. October 3 is a separate list update plus temporary PA-Series hardware surcharge. Do not paste Oct surcharge percentages onto this delta sheet, and do not treat Aug 22 as proof that chassis LIST already rose.
Two Palo Alto commercial clocks sit close on the calendar. Mixing them produces wrong CapEx math and wrong negotiation scripts.
| Dimension | Aug 22 catalog delta | Oct 3 price action |
|---|---|---|
| Primary change | +47 SKUs; 0 removals | List / surcharge on named families |
| LIST on retained SKUs | 0 moves (identical) | Separate commercial cliff |
| Buyer question | Which new ELA / ESA / PS / VION codes? | What rises on Panorama, Flex, SD-WAN, PA hardware? |
| This page | Yes — catalog map | No — use Oct guide |
Full October narrative lives on Palo Alto Price Increase October 2026. Keep that guide’s families and surcharge language off an August catalog-validation RFQ unless the PO ship date actually crosses October 3.
- Use this Aug page when the gap is “is ELA8 / SD-WAN ESA / AgentiX PS / VION-7132 on the book?”
- Use the Oct page when the gap is “will list or PA hardware surcharge change after October 3?”
- Use both only when the same PO spans new SKUs and an October ship — then keep two columns, not one blended percent.
How to Freeze the RFQ Against Aug 22
Quick Answer: Six steps: confirm the quote cites catalog date 2026-08-22, validate every SKU on lookup, split ELA versus ESA versus professional services, attach VION support when capacity is present, keep October 3 assumptions off this sheet, then lock a dated RFQ before CapEx freezes.
- Step 1 — Confirm catalog date. Require the distributor quote footer or cover letter to cite GPL catalog dated 2026-08-22 (15,309 SKUs). Reject sheets that still print only the July 2 index when you need the new ELA8 or ESA codes.
- Step 2 — Validate SKUs on lookup. Resolve every line in SKU Lookup under Palo Alto. Flag any part that does not resolve or that belongs to an older ELA family you no longer intend to buy.
- Step 3 — Split ELA, ESA, and PS columns. Put NGFW ELA8 and SD-WAN ELA software on one sheet lane; put SD-WAN ESA support on a second; put Cortex AgentiX consulting and deployment on a third. Do not roll professional-services days into subscription meters.
- Step 4 — Attach VION support. If the BOM includes
PAN-VION-7132orPAN-VION-7132-HW, addPAN-SVC-PREM-VION-7132and the ESA tier that matches the SLA (Premium, Premium+4Hr, USG, or USG+4Hr). - Step 5 — Keep October 3 off this sheet. Do not apply October list or PA-Series surcharge assumptions to an August catalog-validation exercise. Cross-link the October guide only when ship dates actually cross that cliff.
- Step 6 — Lock a dated RFQ. Submit the split BOM via rfq.html?intent=bom-risk. Freeze CapEx only after a dated distributor response that names the August 22 catalog.
Common Catalog and RFQ Traps
Quick Answer: Frequent mistakes: treating Aug 22 as the Oct 3 surcharge, quoting legacy ELA without ELA8 when the brief needs the new bundle, omitting VION Premium Support, blending AgentiX PS days into subscription meters, and publishing or assuming LIST dollars from a non-public Palo Alto index.
- Mixing Oct surcharge with Aug catalog. August adds codes; October reprices named families. Different RFQ columns.
- Quoting old ELA without ELA8. If the design brief assumes ATP + ADNS + AIPD + Advanced URL + Advanced WildFire + PAA + ASD-WAN under one ELA, verify
PAN-ENT-SUB-ELA8(or the matching Gov term) instead of stitching obsolete rows. - Missing the VION support line. Capacity without
PAN-SVC-PREM-VION-7132leaves production Virtual ION uncovered. - Blending AgentiX PS into software. Hourly, daily, and deployment packages are professional services — not SD-WAN ELA meters.
- Assuming LIST dollars on the public site. Palo Alto SKU Lookup does not expose LIST. Ask for a dated quote; do not scrape or invent dollars.
- Ignoring Gov versus commercial twins. ELA8 and SD-WAN ELA/ESA have Gov families with different metering language. Match the buyer lane before you compare unit economics.
- Treating HW-coded VION as a different appliance class.
PAN-VION-7132-HWis the HW-coded twin of the same 32-core Virtual ION model — confirm which code the seller’s book expects.
Frequently Asked Questions
Quick Answer: August 22 does not raise LIST on retained chassis. It is not the October 3 cliff. ELA8 is the new NGFW subscription bundle. Virtual ION 7132 needs Premium Support. Validate parts on SKU Lookup, then RFQ with catalog date 2026-08-22 locked on the quote.
No. Diff against the July 2 index shows zero LIST price changes on retained SKUs. Forty-seven SKUs were added and none removed. Public SKU Lookup keeps LIST not published on this site — treat dollars as distributor-quote only.
No. October 3 is a separate list and PA-Series surcharge cliff. The August 22 catalog refresh only expands the catalog with new ELA8, SD-WAN ESA, AgentiX PS, and VION-7132 lines.
ELA8 is the new NGFW enterprise license agreement software SKU that bundles ATP, ADNS (plus ADNSR-X), AIPD, Advanced URL, Advanced WildFire, PAA, and ASD-WAN for NGFW on a one-year commercial term. Gov ELA8 variants use a unit-per-hardware-estate mechanism — confirm rates on a dated quote.
Yes for production estates. Pair Virtual ION 32-core (PAN-VION-7132 or the HW-coded twin PAN-VION-7132-HW) with Premium Support PAN-SVC-PREM-VION-7132 and any SD-WAN ESA tier your SLA requires.
Search families on benquan.hk SKU Lookup (Palo Alto brand). Confirm new ELA8, SD-WAN ELA/ESA, AgentiX consulting, and VION lines against the August 22 catalog date, then submit the split BOM on rfq.html with intent=bom-risk.
References
Quick Answer: Validate product families on Palo Alto public NGFW, Prisma SD-WAN / ION, Cortex, and support documentation. Numeric SKU counts on this page come from the July 2 versus August 22 catalog index diff. This page publishes no LIST dollars.
- Palo Alto Networks — Network Security / NGFW
- Palo Alto Networks Docs — Prisma SD-WAN
- Palo Alto Networks — Cortex
- Palo Alto Networks Docs — Support
Primary numeric source: catalog index diff between price-list dates 2026-07-02 (15,262 SKUs) and 2026-08-22 (15,309 SKUs). Product URLs above confirm family names only. Soft commercial figures remain industry estimate / pending confirmation.
Key Takeaway
Key Takeaway: Lock Palo Alto BOMs to catalog date 2026-08-22 when you need ELA8, SD-WAN ESA, AgentiX PS, or VION-7132. Treat retained LIST as unchanged versus July 2. Keep the October 3 surcharge on a separate sheet. BENQUAN GLOBAL LIMITED supplies Palo Alto Networks NGFW and SD-WAN configurations with competitive pricing.