Quick Take
Quick Take: Palo Alto on SKU Lookup moves from catalog date 2026-08-22 (15,309 SKUs) to 2026-09-30 (15,846 SKUs). Net change is +537 / −0. About 490 of the new lines are PAN-PA-* subscription rows, concentrated on Advanced IP Defense. The rest cover ELA modifiers, Cortex Data Security, a few XDR/XSIAM data SKUs, five power supplies, and one.
Validate every Palo Alto line on SKU Lookup before you freeze CapEx. For subscription years, HA pairs, and delivery, submit a dated BOM via rfq.html?intent=bom-risk.
What This Delta Is
Quick Answer: A Palo Alto catalog delta is the part-number set change between two dated SKU Lookup indexes. August 22 held 15,309 public SKUs. September 30 holds 15,846. Five hundred thirty-seven codes are new. None dropped. Buyers use Lookup to confirm a code exists — then price it on a quote.
Definition: BENQUAN SKU Lookup is the live Palo Alto part-number index for appliances, subscriptions, and related orderable codes. The catalog date printed on Lookup is the revision an RFQ should cite. The September 30 refresh is a subscription-heavy expansion, not a chassis replacement wave and not a published list-price table.
Keep it separate from the October 3, 2026 Palo Alto list surcharge (Gen 4 temporary surcharge, Gen 5 base-list move, CVP waiver window). A new AIPD row on Lookup does not mean every PA-400 or PA-5400 list price already moved.
- Fit this page: Open Palo Alto BOMs that must match catalog date 2026-09-30; AIPD, Data Security, or ELA modifier lines that failed Lookup last month; power-supply and PA-56R FIPS kit checks.
- Unfit: Readers who want one percentage “everything went up on September 30.” That claim is not what this index shows. Use the October 3 notice for surcharge scope.
Start on Palo Alto SKU Lookup and the Palo Alto vendor hub.
Catalog Numbers: 15,309 to 15,846
Quick Answer: Previous public index: 2026-08-22, 15,309 SKUs. New public index: 2026-09-30, 15,846 SKUs. Added 537. Removed 0. Public Lookup has no LIST column, so this page does not report a list-price MoM.
| Metric | Value | Buyer note |
|---|---|---|
| Previous catalog date | 2026-08-22 | 15,309 public SKUs |
| New catalog date | 2026-09-30 | 15,846 public SKUs |
| Net SKU change | +537 | Part-number growth |
| Removed SKUs | 0 | No rename cleanup in this diff |
| Public LIST column | Not shown | Quote-oriented Lookup |
On the 15,270 part numbers present in both the August 22 and September 30 indexes, LIST is unchanged: 0 up, 0 down. The new rows carry their own LIST. Public SKU Lookup still hides the LIST column. Channel net stays industry estimate / pending confirmation until a dated quote lands.
August 22 vs September 30 Index
Quick Answer: Versus August 22, September 30 mainly adds Advanced IP Defense subscription variants on existing PA platforms, plus a smaller set of data-security, ELA, power, and one FIPS kit SKUs.
| Bucket | New lines | What to do on an RFQ |
|---|---|---|
PAN-PA-* subscriptions | 490 | Mostly AIPD, including 3-year, 5-year, HA2, and 5G tails. Heaviest on PA-52R (86), PA-54R (28), PA-450R (24), PA-455 (24). Midrange and 5400 families add about a dozen each. |
| ELA / modifier add-ons | about 23 | FedRAMP-mod and SD-WAN ELA add-on codes (1/3/5 year). Attach only on an ELA quote, not a one-box BOM. |
| Cortex Data / XDR / XSIAM | 10 | PAN-DATA-SECURITY, retention and forwarding GB SKUs, plus XDR/XSIAM data-security and XTI lines. |
| Power supplies | 5 | PAN-PWR-1200W-AC-A, PAN-PWR-1200W-DC-A, PAN-PWR-530W-54V-AC-B, PAN-PWR-66W-12V-AC-A, PAN-PWR-66W-12V-AC-R. |
| FIPS kit | 1 | PAN-FIPS-KIT-56R for PA-56R. Hardware kit, not a subscription. |
Limitation: Region, deal registration, and bundle eligibility can hide a code from a specific quote even when Lookup lists it. Confirm the code, then confirm the commercial path.
What Was Added
Quick Answer: Do not paste all 537 lines onto a PO. Add AIPD when the security design names Advanced IP Defense. Add Data Security GB SKUs when ingestion and retention are in scope. Add power and the PA-56R FIPS kit only against the matching chassis.
Representative new codes (not the full list):
| SKU | Read |
|---|---|
| PAN-PA-1410-AIPD | Advanced IP Defense, year 1, PA-1410 — same pattern repeats across many PA models and terms |
| PAN-DATA-SECURITY | Cortex Data Security with DSPM, DLP orchestration, and DDR |
| PAN-DATA-PRO-GB | Daily ingested GB with stated hot/cold retention windows — size GB, do not guess |
| PAN-XDR-DATA-SECURITY / PAN-XSIAM-DATA-SECURITY | Data-security attach for XDR and XSIAM — match the platform you actually run |
| PAN-FIPS-KIT-56R | FIPS hardware kit for PA-56R |
| PAN-PWR-1200W-AC-A | 1200 W AC supply — pair to the chassis power budget, not as a spare-by-default |
PA-52R alone accounts for 86 of the new subscription rows. A branch refresh that does not include PA-52R should ignore that block.
Removals
Quick Answer: Zero part numbers left the index between August 22 and September 30. There is no rename pair to search-replace in ERP from this diff.
Absence of a removal is not a promise that every old quote line is still the commercial default. Subscription term (1-year vs 3-year vs 5-year) and HA2 vs standalone still have to match the design. If a distributor quote uses a code Lookup cannot resolve, treat that as a mismatch — not as proof the September index deleted it, because this diff deleted nothing.
RFQ How-To Steps
Quick Answer: Cite 2026-09-30, validate on Lookup, add AIPD only if required, keep October 3 surcharge work on its own checklist, then send one BOM.
- Stamp the catalog date. BOMs and comparison sheets should say Palo Alto catalog 2026-09-30, 15,846 SKUs.
- Validate codes. Open SKU Lookup → Palo Alto. Bulk paste is part numbers only.
- Decide AIPD per platform. New rows cluster on PA-52R, PA-54R, PA-450R, PA-455, and smaller sets on 1400 / 3400 / 5400. Match model, term, and HA2 flag.
- Size data SKUs in GB.
PAN-DATA-PRO-GBand retention add-ons are quantity-sensitive. Write the GB assumption on the RFQ. - Split the October 3 track. If the quote also hits the October 3 surcharge, say so explicitly. Do not bury it inside “catalog +537.”
- Submit. rfq.html?intent=bom-risk with quantities, subscription years, ship-to region, and need-by date.
Common Traps
- Catalog date vs surcharge date. September 30 is the Lookup index. October 3 is the list-surcharge effective date for named families. They are not the same event.
- Auto-adding AIPD. Lookup listing a code does not mean the renewal must include it. Attach Advanced IP Defense only when the design or the incumbent subscription includes it.
- HA2 vs standalone. Many new tails are
-HA2or-R. A single-firewall site should not inherit an HA pair SKU. - ELA modifiers on a transactional quote.
PAN-*-ELA-FMODand GOV ELA add-ons belong on an enterprise agreement, not a one-chassis spare order. - Expecting LIST on the public page. Palo Alto Lookup does not publish a LIST column. A missing price on Lookup is normal, not a broken row.
- PA-52R volume. Eighty-six new rows on one branch model can dominate a diff export. Filter by the models you actually buy.
Frequently Asked Questions
Yes. Catalog date 2026-09-30, 15,846 public SKUs. The previous public index was 2026-08-22 with 15,309 SKUs.
About 490 are PAN-PA subscription rows, mostly Advanced IP Defense across branch and midrange platforms, including multi-year and HA2 variants. The remainder are ELA modifiers, Cortex Data Security and XDR/XSIAM data SKUs, five power supplies, and PAN-FIPS-KIT-56R. Nothing was removed.
Retained part numbers (15,270 lines in both indexes) show 0% LIST movement. New SKUs have their own LIST. Public Lookup still does not display LIST. The October 3 surcharge is a separate notice — read that page before you reprice Gen 4 or Gen 5 families.
No. The new AIPD rows mean the code is orderable on the September 30 index. Include it only when the security design or the current subscription set requires Advanced IP Defense.
Submit the mapped BOM on rfq.html?intent=bom-risk with quantities, term, and delivery window. BENQUAN returns a dated quote. Until that quote is issued, any channel figure is an industry estimate / pending confirmation.
References
- Palo Alto SKU Lookup — live part-number index, catalog date 2026-09-30.
- Palo Alto vendor hub — model index and RFQ entry.
- Palo Alto October 3, 2026 list surcharge — separate from this catalog delta.
- Palo Alto Networks documentation — platform and subscription descriptions.
Key Takeaway
Key Takeaway: Freeze Palo Alto BOMs against catalog date 2026-09-30 (15,846 SKUs). The +537 is mostly Advanced IP Defense subscription depth, with zero removals. Do not treat it as the October 3 list surcharge. BENQUAN GLOBAL LIMITED supplies Palo Alto appliances, subscriptions, and spares with worldwide shipping — submit the mapped BOM via rfq.html?intent=bom-risk.