Network Security / Branch / Retail / ML-Powered NGFW

Does inspection drop the PA-400 to between 0.8 and 3 Gbps?

Desktop and compact branch ML-Powered NGFWs — PA-410 through PA-460 with optional PoE and integrated 5G — for distributed enterprise, retail, and midsize sites.

Quick Take

Quick Take: Branch firewall sizing goes wrong when the quote is built on firewall-only throughput. With inspection enabled the PA-400 ladder delivers between 0.8 and 3.0 Gbps, and session capacity moves from 64,000 to 400,000 across the same five models, so the site's concurrency matters as much as its bandwidth.

Performance Table

Quick Answer: Size on Threat Prevention and IPsec rather than firewall-only throughput. The ladder runs from roughly 0.8 Gbps Threat Prevention and 64,000 sessions on PA-410 up to about 3.0 Gbps and 400,000 sessions on PA-460. Virtual system support also scales, from one on PA-410 to five on PA-450 and above.

Performance figures follow the vendor PA-400 Series datasheet (PAN-OS 12.1 class numbers). Confirm against your software train — older datasheets may list PAN-OS 11.x values. BENQUAN GLOBAL LIMITED supplies Palo Alto appliances and subscriptions. Related: PA-1400, PA-3400, SKU Lookup. Request a quote.

Model FW (appmix) Threat Prevention IPsec VPN Sessions VS base/max
PA-410 / 415 / 415-5G~1.4–1.5 Gbps~0.8 Gbps~0.5 Gbps64K1/1
PA-440 / 445~2.4–2.7 Gbps~1.2–1.25 Gbps~1.1 Gbps200K1/2
PA-450 / 455~3.3–3.6 Gbps~2.1–2.3 Gbps~1.7–1.8 Gbps300K1/5
PA-455-5G~3.2 Gbps~1.8 Gbps~1.6 Gbps300K1/5
PA-460~4.2 Gbps~3.0 Gbps~2.3 Gbps400K1/5

*Some 5G SKU rows appear as preliminary on older sheets — lock numbers to the datasheet revision on your quote. TP includes App-ID, IPS, AV, WildFire, DNS Security, file blocking, and logging.

Overview

Quick Answer: PA-400 runs the same PAN-OS ML-Powered NGFW stack as the larger appliances — App-ID, Threat Prevention, WildFire, DNS Security, optional SD-WAN — in a compact desktop chassis. Zero-touch provisioning and Panorama templates are what make it practical to roll out across dozens or hundreds of branches at once.

Hardware Notes

Quick Answer: Interfaces are mostly 1G copper, seven ports on the fanless PA-410 and eight on PA-440 through PA-460. PoE variants such as PA-415, PA-445, and PA-455 add four PoE ports sharing roughly 91 W, capped near 60 W per port. The 5G SKUs embed a cellular modem for backup or primary WAN.

VariantI/O highlight
PA-4107× 1G RJ45; fanless; lowest power
PA-440 / 450 / 4608× 1G RJ45 desktop
PA-415 / 445Combo SFP/RJ45 + PoE copper
PA-455More combo + PoE for denser branch
PA-415-5G / 455-5GEmbedded 5G modem + LAN/PoE mix

When to skip PA-400: Need multigig, 10G SFP+, or 4–6 Gbps TP → PA-1400 · see also PA-400 vs PA-1400 buying guide. High-speed internet gateway → PA-3400.

Use Cases

Quick Answer: The series fits retail chains, small remote offices, and executive home offices, plus any site where cellular is the primary or backup WAN. Zero-touch provisioning with Panorama templates keeps policy consistent across a large estate. PoE variants remove the need for a separate switch at sites with a few phones or access points.

Mass branch rollout

PA-410/440 with ZTP and Panorama templates for consistent policy at scale.

PoE branch kit

PA-415/445/455 when a few phones/APs must be powered from the firewall.

5G primary or backup WAN

PA-415-5G / 455-5G to avoid a separate cellular router for critical uptime.

Buying Notes

Quick Answer: Work in this order: set the Threat Prevention target, decide whether you need PoE or an embedded 5G modem, choose active/active or active/passive HA, then add subscriptions for Threat Prevention, WildFire, DNS Security and SD-WAN, management through Panorama or Strata Cloud Manager, and a support plan sized for distributed sites.

  1. Model ladder PA-410 → PA-460 by Threat Prevention
  2. PoE device list vs ~91 W budget
  3. 5G SKU and carrier plan if cellular WAN
  4. Active/active or active/passive HA
  5. Threat Prevention / WildFire / DNS / SD-WAN subscriptions
  6. Support and RMA for distributed sites

Search Palo Alto parts on SKU Lookup.

Which Part Numbers Should You Freeze on the RFQ (3 SKUs)?

Quick Answer: When quoting PAN-PA-450 and sibling configurations across these 3 part numbers, lock the exact base MPN, redundant power supplies, optics, and matching 1-year or 3-year support tier on separate lines before comparing vendor discounts. Channel net pricing remains industry estimate / pending confirmation.

Ordering SKUKey Configuration & BoundaryAdjacent BOM Lines to Freeze
PAN-PA-450PA-400 desktop NGFW, ~2.1 Gbps Threat Prevention class, subscriptions and support as separate lines. Worldwide brief, no public net.PAN-PA-450 ×2, Threat / URL / WildFire term, Partner / OEM years, PAN-PA-1410
PAN-PA-415PA-400 micro-branch NGFW, PoE SKU check, subscriptions as separate lines. Do not mix with PA-450 or PA-1410 on one column.PAN-PA-415-5G, Threat / URL / WildFire term, Partner / OEM years, PAN-PA-450
PAN-PA-440PA-400 desktop, ~1.2 Gbps Threat Prevention, 8x 1G RJ45, 200K sessions. Not PA-415/445/450 or PA-1410.Second PAN-PA-440, Threat / URL / WildFire term, Partner / OEM years, PAN-PA-445

Frequently Asked Questions

Quick Answer: PA-400 appliances are compact desktop or small-form-factor boxes for branch and retail sites, not 19-inch rackmount units; step to PA-1400 for 1U multigig and PoE with 4.5-6.2 Gbps Threat Prevention. Advanced SD-WAN runs on PA-400 only when licensed, so put that subscription on the RFQ.

The official PA-400 Series datasheet is on Palo Alto Networks: paloaltonetworks.com/resources/datasheets/pa-400-series. This page is the RFQ table — PA-410 through PA-460 threat prevention — so you size a branch box before opening the vendor sheet. Confirm PAN-OS train and SD-WAN licensing on the quote.

These are compact desktop / small form-factor appliances (some near 1U width). For standard 19" 1U with denser I/O, look at PA-1400.

Yes when Advanced SD-WAN is licensed on the firewall — include it on the RFQ; it is not assumed in base hardware.

PA-400 = compact branch/retail. PA-1400 = 1U with multigig/PoE and higher TP (4.5–6.2 Gbps). Choose by throughput and port needs.

BENQUAN GLOBAL LIMITED supplies PA-400 series appliances and subscriptions. Contact info@benquan.hk or request a quote.

Key Takeaway

Key Takeaway: Choose PA-410 or PA-440 for small offices, PA-450 upward when inspected traffic passes two gigabits, a PoE variant when phones or access points hang off the firewall, and a 5G model where cellular is the only WAN. BENQUAN GLOBAL LIMITED supplies Palo Alto Networks PA-455 appliances with competitive pricing.

Which PA-400 model, and how many?

Branch rollouts go wrong in two ways: the wrong model at every site, or a PoE and 5G mix that does not match what is actually plugged in. Send us your site count, throughput target, powered devices, and WAN plan — we will confirm the model ladder, the full bill of materials, and a Hong Kong delivery schedule.

Get Sizing Help and a Quote

Or call +852-21349834 · info@benquan.hk

Contents