Quick Take
Quick Take: A tender BOM that says "servers, switches, storage" buys you three different kits and a price comparison that means nothing. Write 9 fields on every line — function, performance floor, quantity with units, interfaces and optics, licence term, power and cooling, warranty, delivery window, acceptance test — add a deviation table, and ask for one alternative column. Then bids differ in price and delivery, not in what is being bought.
You are not writing paperwork. You are deciding what the evaluation committee will be able to compare. Spend two hours on the BOM now, or spend a tender round re-running it later. Send us the draft clauses and we will mark the lines that will come back incomparable, before the tender opens.
What goes wrong when the PA-400 RFQ uses firewall-only Gbps?
Quick Answer: You award a light inspection test. Production turns Threat Prevention on.
Search already sends palo alto pa-440 and palo alto pa-450 queries to BENQUAN — and the specs page answers chassis photos plus PAN-PA-400-RACKTRAY when buyers need a sizing number. Typical scene: finance compares “4.2 Gbps firewall” on PA-460 against another vendor’s Threat Prevention figure. After cutover, Threat subscriptions and IPsec are on; latency climbs and new sessions fail at every branch.
This page is model-specific: which Palo Alto PA-400 datasheet rows are eligible for award. The general rulebook lives on NGFW throughput: which datasheet rows to size. Ports, PoE and RACKTRAY stay on the PA-400 series specs RFQ page. Need 4.5 Gbps+ Threat Prevention? Step to the PA-1400 datasheet row map.
Soft channel Mbps below are industry-published “up to” figures from the public PA-400 Series datasheet (PAN-OS 12.1 appmix, file mark 25 Feb 2026) — pending confirmation on your dated PDF and software train.
PA-400 datasheet rows — which ones bind the RFQ?
Quick Answer: Same appliance, stacked numbers; award on Threat Prevention and IPsec.
| Datasheet row (PAN-OS 12.1 appmix) | PA-410 | PA-440 | PA-450 | PA-460 | Use for RFQ sizing? |
|---|---|---|---|---|---|
| Firewall throughput (appmix) | 1.4 Gbps | 2.4 Gbps | 3.3 Gbps | 4.2 Gbps | No — not award metric |
| Threat Prevention (appmix) | 0.8 Gbps | 1.2 Gbps | 2.1 Gbps | 3.0 Gbps | Default yes |
| IPsec VPN | 0.5 Gbps | 1.1 Gbps | 1.7 Gbps | 2.3 Gbps | Required if VPN binds |
| New sessions/sec | 11,000 | 34,000 | 48,000 | 67,000 | Always beside Gbps |
| Max concurrent sessions | 64,000 | 200,000 | 300,000 | 400,000 | Always beside Gbps |
Threat Prevention on the public sheet includes App-ID, IPS, antivirus, antispyware, WildFire, DNS Security, file blocking, and logging under appmix. All values are “up to” and vary with configuration — Mbps pending confirmation. Variants on the same sheet: PA-415 / 415-5G keep 0.8 Gbps Threat Prevention; PA-445 is 1.25; PA-455 is 2.3 / IPsec 1.8; PA-455-5G is 1.8 / IPsec 1.6 — do not paste PA-455 math onto the 5G SKU. For interactive first-pass math, use Palo Alto firewall sizing calculator.
What “real” PA-400 throughput means for procurement
Quick Answer: Capacity with Threat Prevention on — not firewall-only marketing.
Definition: for buying and tendering PA-410 / 440 / 450 / 460, real throughput is the sustained rate when the security features you will enable are on, under a mix close to production — including IPsec if VPN is in the design. It is not the firewall-only appmix Gbps printed above Threat Prevention on the datasheet.
Like rating a delivery van by payload with the cargo loaded, not empty top speed. Palo Alto labels the deep inspected row Threat Prevention; Fortinet materials often say Threat Protection — different words, same RFQ idea. Model numbers, PoE watts and RACKTRAY belong on the specs page; this page only freezes the metric name.
PA-460 lifts Threat Prevention, IPsec and the session table versus PA-410. Pick 460 when those ceilings bind — do not invent a firewall-only story to keep the cheaper 410 on a 2 Gbps inspected WAN. If you already need more than 3.0 Gbps Threat Prevention, the next named-row page is PA-1400, not a bigger PA-400 firewall-only number.
Lock PA-400 metrics on the RFQ, 6 steps
Quick Answer: Features → Threat Prevention → IPsec if VPN → sessions → PAN-OS date → calculator check.
- Step 1 — List features that stay on day one — App-ID, Threat Prevention subscriptions, WildFire, DNS Security, URL, IPsec VPN — if enabled, it belongs in the sizing row.
- Step 2 — Circle Threat Prevention on the PA-400 PDF — PAN-OS 12.1 appmix: 0.8 / 1.2 / 2.1 / 3.0 Gbps (410 / 440 / 450 / 460). Strike firewall-only 1.4–4.2 Gbps for award math.
- Step 3 — Add IPsec if VPN binds — Lock 0.5 / 1.1 / 1.7 / 2.3 Gbps when tunnels are in scope. PA-410 IPsec is 0.5 Gbps — that often binds first.
- Step 4 — Write CPS and session ceilings — Put new sessions/sec and concurrent sessions beside Gbps on the RFQ.
- Step 5 — Attach datasheet page and PAN-OS train — Require every bidder to cite the same named row and the 25 Feb 2026 sheet (or your later revision) plus software train.
- Step 6 — Cross-check headroom with the calculator — Run peak bandwidth + VPN share through /firewall-sizing-calculator.html; method detail on the NGFW companion. Mbps pending confirmation.
Small first step: open your dated PA-400 Series PDF. Highlight Threat Prevention and IPsec. If the RFQ still cites only “firewall throughput,” rewrite that line before you compare price across sites.
Who must use Threat Prevention — who can simplify?
Quick Answer: Branch with Threat on + VPN: deep rows mandatory. Low-VPN segments: still ban firewall-only awards.
Retail or branch internet edge with Threat Prevention subscriptions and IPsec. Threat Prevention (0.8–3.0 Gbps) and IPsec (0.5–2.3 Gbps) bind design. Size HA so failover does not strand sessions. Firewall-only is never enough if Threat and VPN are planned. Multiply by site count — one wrong row is one wrong box at every store.
Internal segmentation with App-ID + IPS, limited VPN. Threat Prevention may bind — still print feature names on the RFQ so sellers cannot substitute the 1.4–4.2 Gbps firewall line.
- Fit: any PA-410 / 440 / 450 / 460 RFQ naming Gbps; equal-BOM multi-vendor bake-off; buyers who landed on pa-440 / pa-450 queries with no useful click.
- Not fit: PA-1400 1U class (4.5 Gbps+ TP); PA-3400+ chassis needs; already-measured production PA-400 with proven Threat Prevention headroom; single-unit retail buyers.
PA-400 datasheet traps on RFQ
Quick Answer: Award on firewall-only, ignore IPsec, skip sessions, mix 455 with 455-5G.
| Trap | What happens | Fix |
|---|---|---|
| Award on 1.4–4.2 Gbps FW | Threat-on collapse at every site | Threat Prevention 0.8 / 1.2 / 2.1 / 3.0 |
| Ignore IPsec row | VPN kills PA-410 first | 0.5 / 1.1 / 1.7 / 2.3 Gbps IPsec |
| Gbps only | Session exhaustion (64k on 410) | Add sessions/sec |
| Use average Mbps | Peaks drop sessions | 95th percentile + headroom |
| No PDF / PAN-OS date | Stale row | 25 Feb 2026 sheet + train on RFQ |
| Mix PA-455 with PA-455-5G | Wrong ceiling | Name exact MPN — 5G is 1.8 / 1.6 |
Cross-brand comparisons still need the same named row — open the NGFW datasheet-vs-real method before you mix Palo Alto Threat Prevention with another vendor’s firewall headline.
Frequently Asked Questions
Quick Answer: A tender BOM is the issuer's pricing baseline: same lines, same units, same licence years. Bidders answer with a deviation table, and the committee compares lines, not totals.
Default to Threat Prevention appmix — 0.8 Gbps on PA-410, 1.2 on PA-440, 2.1 on PA-450, 3.0 on PA-460 (public PA-400 Series datasheet, PAN-OS 12.1, 25 Feb 2026). If site-to-site or remote-access VPN binds capacity, also lock IPsec (0.5 / 1.1 / 1.7 / 2.3 Gbps). Do not award on firewall-only appmix (1.4–4.2 Gbps). Mbps pending confirmation — re-check your PDF and software train.
Firewall appmix measures forwarding with a lighter inspection mix. Threat Prevention includes App-ID, IPS, antivirus, antispyware, WildFire, DNS Security, file blocking, and logging under the same appmix label. Same chassis, deeper test — the Threat Prevention row is the procurement metric. See the companion NGFW method article.
When VPN is in the design (branch HA, hub spoke, remote access), IPsec Gbps often binds before Threat Prevention alone — especially on PA-410 (0.5 Gbps IPsec). Put both named rows on the RFQ line. Pure internet edge with no tunnel budget: still ban firewall-only awards.
Use Threat Prevention and sessions: 410 ≈ 0.8 Gbps TP / 64k sessions; 440 ≈ 1.2 / 200k; 450 ≈ 2.1 / 300k; 460 ≈ 3.0 / 400k. PoE and 5G variants stay on the specs page; this page only freezes the metric names.
No. On the same 25 Feb 2026 sheet, PA-455 Threat Prevention is 2.3 Gbps and IPsec 1.8 Gbps; PA-455-5G drops to 1.8 Gbps Threat Prevention and 1.6 Gbps IPsec (firewall 3.2 Gbps). Do not paste PA-455 math onto a 5G SKU. Mbps pending confirmation.
The specs page freezes ports, PoE watts, RACKTRAY SKUs and 5G options. This page answers which Threat Prevention / IPsec rows to lock for sizing and award. Use both; for the cross-brand method, open the NGFW datasheet-vs-real article and the firewall sizing calculator.
No. PAN-PA-400-POE-PWR-150W, PAN-PA-400-RACKTRAY and PAN-PA-400-POE-RACKTRAY are accessory SKUs — power and rack hardware. They do not rewrite PA-410/440/450/460 Threat Prevention or IPsec Gbps. Order them on the PA-400 series specs BOM; keep this page for the named throughput rows. Mbps pending confirmation.
References
Quick Answer: Buyer behaviour figures come from the G2 and TechnologyMatch 2026 surveys; tender scale from DoNews award tracking for the first seven months of 2026. Checked 21 October 2026.
Key Takeaway
Key Takeaway: Size and RFQ PA-410 / 440 / 450 / 460 on Threat Prevention (0.8 / 1.2 / 2.1 / 3.0 Gbps) — and IPsec (0.5 / 1.1 / 1.7 / 2.3 Gbps) when VPN binds — not firewall-only appmix (1.4–4.2 Gbps). BENQUAN GLOBAL LIMITED supplies PA-400 series with competitive pricing for equal-BOM RFQs that name the same datasheet rows; Mbps pending confirmation.